- 08:07, 23 July 2018 diff hist +4 m Category:753 Bridge Inspection Rating Per BR, updated contact info
- 07:38, 23 July 2018 diff hist 0 File:101 Floodplain Development Permit Application Oct 2015.pdf EPGsysop uploaded a new version of File:101 Floodplain Development Permit Application Oct 2015.pdf current
- 07:38, 23 July 2018 diff hist 0 File:101 Floodplain Development Permit Application 2015.pdf EPGsysop uploaded a new version of File:101 Floodplain Development Permit Application 2015.pdf current
- 07:37, 23 July 2018 diff hist 0 File:101 Floodplain Development Permit Application.pdf EPGsysop uploaded a new version of File:101 Floodplain Development Permit Application.pdf current
- 07:36, 23 July 2018 diff hist 0 File:101 Affidavit for Compliance with Prevailing Wage.pdf EPGsysop uploaded a new version of File:101 Affidavit for Compliance with Prevailing Wage.pdf current
- 08:56, 19 July 2018 diff hist -5,741 Help Article
- 08:54, 19 July 2018 diff hist -5,067 Main Page
- 13:52, 29 June 2018 diff hist +93 m Main Page EPG 618
- 13:51, 29 June 2018 diff hist +4,418 m Category:618 Mobilization Per CM, new guidance clarifies how REs should always have been administering payment for Mobilization according to the current spec
- 15:15, 28 June 2018 diff hist 0 m Main Page
- 15:00, 28 June 2018 diff hist 0 N File:402 CLC Contractor June 2018.pdf
- 15:00, 28 June 2018 diff hist +5 m Category:402 Bituminous Surface Leveling minor correction
- 14:29, 28 June 2018 diff hist 0 N File:Main Page June 28, 2018.jpg current
- 14:29, 28 June 2018 diff hist +417 m Main Page
- 13:03, 28 June 2018 diff hist +68 m Main Page EPG 236.7.5.4
- 12:30, 28 June 2018 diff hist +1,184 m 236.7 Negotiation →236.7.5.4 Acquisition from State of Missouri Agencies: Per RW, clarified when we acquire property from the State of MO, specifically, the Univ. of MO and Dept. of Conservation
- 15:08, 27 June 2018 diff hist +81 m 238.2 Land Surveying →238.2.17 Professional Land Surveyor Review: Per RW, further clarified guidance
- 10:10, 27 June 2018 diff hist 0 m 751.1 Preliminary Design Per BR, clarified Request for Soil Properties Form A in "Request for Final Soundings for Structures" Form
- 10:09, 27 June 2018 diff hist 0 m 320.4 Procedure for Final Sounding Per BR, clarified Request for Soil Properties Form A in "Request for Final Soundings for Structures" Form
- 10:09, 27 June 2018 diff hist 0 m 320.3 Drilling Operations Per BR, clarified Request for Soil Properties Form A in "Request for Final Soundings for Structures" Form
- 10:08, 27 June 2018 diff hist 0 N File:751.1.2.20 Request Jun 2018.xlsx current
- 10:07, 27 June 2018 diff hist 0 m Category:101 Standard Forms →Bridge: Per BR, clarified Request for Soil Properties Form A in "Request for Final Soundings for Structures" Form
- 14:27, 26 June 2018 diff hist +121 m 237.14 Electronic Design Data Delivery (BIM Deliverables) →237.14.2.6 Civil Geometry Report: Per CADD, updated reference to document used to produce the Civil Geometry Report. The archaic "MoDOTCivilGeometry Report" was replaced.
- 10:25, 26 June 2018 diff hist -121 m Main Page EPG 238.2.17
- 08:32, 26 June 2018 diff hist +162 m 238.2 Land Surveying Per RW, clarified EPG 238.2.17 with current business practices. Updated Exhibit A - legal descriptions-survey approval and Form 238.2.18.2 Plat Review Checklist.
- 13:17, 22 June 2018 diff hist +1 m Main Page
- 09:28, 22 June 2018 diff hist -5 m Category:134 Engineering Professional Services →134.1.1 Federal Law: updated broken CFR 172.3 link
- 10:28, 21 June 2018 diff hist 0 N File:127.25.2.1 Hazardous June 2018.docx current
- 10:27, 21 June 2018 diff hist +5 m 127.25 Maintenance Environmental Policies Per Env'l, updated "Hazardous Materials Response Plan" document
- 08:58, 21 June 2018 diff hist -3 m Category:110 State and Federal Wage Rates and Other Requirements →Required Notices and Posters: Per CM, updated " checklist of the jobsite posters" link
- 08:43, 21 June 2018 diff hist +12 m Category:101 Standard Forms →Construction and Materials: Per CM, retitled all of the On-Call spreadsheets to begin with JOC. Updated their links. Added new Microsurfacing JOC.
- 12:42, 19 June 2018 diff hist -6 m 606.1 Guardrail →606.1.3.5.1 Closures of Existing Streets and Roads: Per TS, with the help of the WZQC, EPG 606.1.3.5 had minor clarifications to reflect the current practices at MoDOT.
- 12:40, 19 June 2018 diff hist 0 N File:616.8.8a MT 2018.pdf current
- 12:39, 19 June 2018 diff hist +10 m 616.8 Typical Applications (MUTCD 6H)
- 12:37, 19 June 2018 diff hist +10 m 616.8 Typical Applications (MUTCD 6H) Per TS, with the help of the WZQC, EPG 606.1.3.5 had minor clarifications to reflect the current practices at MoDOT. A reference to EPG 606.1.3.5 was added to TA-8a.
- 11:14, 15 June 2018 diff hist +96 m Category:101 Standard Forms →Construction and Materials: Per CM, added On-Call Lighting Repair Job Order
- 09:16, 15 June 2018 diff hist +22 m 236.7 Negotiation →236.7.6.3 Acquisition Procedure: updated link
- 09:15, 15 June 2018 diff hist -54 m 236.4 Description Writing and Titles →236.4.4.8 Obtaining Title Insurance: Per RW, clarified EPG 236.4.4.8 Obtaining Title Insurance with guidance reflecting current title commitment business practices.
- 08:21, 15 June 2018 diff hist -2 m Main Page
- 08:13, 14 June 2018 diff hist +47 m 751.6 General Quantities →751.6.1 Index of Quantities: Per BR, added pay item
- 15:10, 13 June 2018 diff hist +98 m Category:751 LRFD Bridge Design Guidelines Per BR, guidance about specs for designing retaining walls to long-established current standards
- 09:17, 13 June 2018 diff hist +81 m Category:751 LRFD Bridge Design Guidelines Per BR, updated link to report
- 13:22, 11 June 2018 diff hist +197 m Category:321 Geotechnical Engineering Per Geotech, updated some FHWA reference documents
- 09:52, 11 June 2018 diff hist -62 m 127.28 Planning and Environmental Linkages (PEL) and the National Environmental Policy Act (NEPA) Per TP, updated Long-Range Plan link
- 09:49, 11 June 2018 diff hist -14 m 121.2 The Planning Framework for Transportation Decision-Making Per TP, updated Long-Range Plan links
- 12:13, 7 June 2018 diff hist 0 m Category:731 Precast Reinforced Concrete Manholes and Drop Inlets →731.1.3 Quantity Sheet Procedure (Column Headings): corrected link
- 11:27, 7 June 2018 diff hist +266 m 616.22 Advanced Work Zone Training Per WZQC, updated training link
- 11:25, 7 June 2018 diff hist +107 m 616.21 Work Zone Technician Training Per WZQC, updated training link
- 14:27, 6 June 2018 diff hist +2 m 643.2 Local Utility Adjustments - Public and Private Per Bidding and Est'g, further updated D-12
- 14:27, 6 June 2018 diff hist +4 m Category:124 Quality Control / Quality Assurance (QC/QA) Per Bidding and Est'g, further updated D-12
- 14:26, 6 June 2018 diff hist +2 m Category:101 Standard Forms Per Bidding and Est'g, further updated D-12
- 14:25, 6 June 2018 diff hist 0 N File:D-12 June 6 2018.pdf current
- 14:25, 6 June 2018 diff hist +4 m 237.9 Submission of Plans and Supporting Documents Per Bidding and Est'g, further updated D-12
- 07:47, 6 June 2018 diff hist 0 m Main Page
- 13:57, 5 June 2018 diff hist +5 m 643.2 Local Utility Adjustments - Public and Private Per Bidding and Est'g, further updated D-12
- 13:57, 5 June 2018 diff hist +10 m Category:124 Quality Control / Quality Assurance (QC/QA) Per Bidding and Est'g, further updated D-12
- 13:56, 5 June 2018 diff hist +5 m Category:101 Standard Forms Per Bidding and Est'g, further updated D-12
- 13:55, 5 June 2018 diff hist 0 N File:D-12 June 2018.pdf current
- 13:55, 5 June 2018 diff hist +10 m 237.9 Submission of Plans and Supporting Documents Per Bidding and Est'g, further updated D-12
- 13:31, 5 June 2018 diff hist -5 m 643.2 Local Utility Adjustments - Public and Private Per Bidding and Est'g, updated D-12
- 13:30, 5 June 2018 diff hist -10 m Category:124 Quality Control / Quality Assurance (QC/QA) Per Bidding and Est'g, updated D-12
- 13:28, 5 June 2018 diff hist -5 m Category:101 Standard Forms Per Bidding and Est'g, updated D-12
- 13:27, 5 June 2018 diff hist 0 N File:D-12 2018.pdf current
- 13:27, 5 June 2018 diff hist -2 m 237.9 Submission of Plans and Supporting Documents
- 13:26, 5 June 2018 diff hist -8 m 237.9 Submission of Plans and Supporting Documents Per Bidding and Est'g, updated D-12
- 10:41, 5 June 2018 diff hist -239 m Main Page EPG 751.11.2.1
- 10:33, 5 June 2018 diff hist +428 m 751.11 Bearings →751.11.2.1 Elastomeric Bearings: Per BR, ASTM F1554 Grade 105 anchor bolts may be used when Grade 55 is not adequate.
- 15:17, 1 June 2018 diff hist +4 m Main Page
- 11:21, 1 June 2018 diff hist +1 m 751.50 Standard Detailing Notes →B3a. Bridges
- 10:47, 1 June 2018 diff hist +2 Main Page
- 10:46, 1 June 2018 diff hist -409 m Main Page EPG 751.50
- 10:43, 1 June 2018 diff hist +28 m 751.50 Standard Detailing Notes Per BR, updated Note B3.2
- 12:20, 31 May 2018 diff hist +7 m Main Page
- 12:06, 31 May 2018 diff hist -534 m Category:109 Measurement and Payment →109.7.1 Payment Estimates: Per CM, the Electronics Documentation Choice Request Form is now obsolete since all projects have the eConstruction JSP, which disallows the use of paper submittals.
- 09:43, 31 May 2018 diff hist -145 m 751.10 General Superstructure →751.10.3.1 Type, Alignment and Spacing: Per BR, removed redundant #10 (was same as #9b) and renumbered following points
- 12:11, 30 May 2018 diff hist 0 m Category:109 Measurement and Payment →109.13 Prompt Payment to Subcontractors and Suppliers (for Sec 109.13): Per CM and ECR, pay period corrected to 15 days per Sec 109.13 and State Statue 34.057
- 10:47, 30 May 2018 diff hist 0 m 903.14 Memorial Signs →903.15.2 Memorial Highway and Bridge Program (M18-1, M18-2) (MUTCD Section 2M.10): Per TS, updated contact number
- 10:22, 30 May 2018 diff hist 0 N File:616.26 2018.jpg current
- 10:21, 30 May 2018 diff hist 0 m 616.26 Work Zone User Training current
- 10:17, 30 May 2018 diff hist +287 m 616.26 Work Zone User Training Per TS, updated links to training manuals
- 12:56, 25 May 2018 diff hist +14 m 413.1 Micro-Surfacing
- 12:31, 24 May 2018 diff hist +10 m 616.8 Typical Applications (MUTCD 6H) Per TS, corrected discrepancies between the TAs and standard plans regarding the sign number GO22-1 for Wet Paint Signs.
- 11:21, 24 May 2018 diff hist -66 m Main Page EPG 751.10.3.1
- 10:32, 24 May 2018 diff hist +4 m Category:625 Slab Stabilization Per DE, minor updates to "Guidance for Asphalt Cement Price Index Adjustments"
- 10:31, 24 May 2018 diff hist +4 m Category:409 Seal Coat Per DE, minor updates to "Guidance for Asphalt Cement Price Index Adjustments"
- 10:31, 24 May 2018 diff hist +4 m Category:402 Bituminous Surface Leveling Per DE, minor updates to Guidance for Asphalt Cement Price Index Adjustments
- 10:30, 24 May 2018 diff hist +4 m Category:401 Bituminous Base and Pavement Per DE, minor updates to Guidance for Asphalt Cement Price Index Adjustments
- 10:29, 24 May 2018 diff hist 0 N File:403 Guidance for Asphalt Cement Price Index Adjustments May 2018.docx
- 10:29, 24 May 2018 diff hist +4 m Category:403 Asphaltic Concrete Pavement
- 10:16, 24 May 2018 diff hist +409 m 751.50 Standard Detailing Notes →H7. Slab Drains (Notes for Bridge Standard Drawings)
- 10:09, 24 May 2018 diff hist -237 617.2 Construction Inspection Guidelines for Sec 617 Per CM and EPS, eliminated the specified 4 ft distance required between traffic barrier and stored material. Associated with request #842 (5/17/18)
- 09:55, 24 May 2018 diff hist +522 m 751.10 General Superstructure →751.10.3.1 Type, Alignment and Spacing: Per BR, stated the allowed slab drain color coatings
- 15:04, 23 May 2018 diff hist +15 m Main Page
- 15:03, 23 May 2018 diff hist 0 N File:Main Page May 23, 2018.jpg current
- 15:02, 23 May 2018 diff hist -182 m Main Page
- 14:53, 22 May 2018 diff hist +1 m Main Page
- 11:14, 22 May 2018 diff hist +247 m Main Page EPG 106.12.1.1
- 11:12, 22 May 2018 diff hist -93 m 106.12 Pre-Acceptance Lists (PAL) →3) PAL Material Arrival Confirmation: Per CM, clarified Pre-Acceptance Identification Tag guidance to allow for identifying PAL material shipped to MoDOT projects.
- 10:45, 21 May 2018 diff hist 0 N File:121 Planning Framework 2018.docx current
- 10:45, 21 May 2018 diff hist +5 m Category:121 Project Planning, Prioritization and STIP Commitments Per TP, minor clarifications to "The Planning Framework for Transportation Decision Making"
- 13:50, 18 May 2018 diff hist 0 m Main Page
- 13:27, 18 May 2018 diff hist 0 N File:Main Page May 18, 2018.jpg current
- 13:26, 18 May 2018 diff hist +329 m Main Page
- 09:56, 18 May 2018 diff hist -10 m 616.8 Typical Applications (MUTCD 6H) →Listing of Typical Applications for Design and Construction and Materials: Per TS, delayed correcting the sign number GO22-1 for Wet Paint Signs until later this year.
- 09:52, 18 May 2018 diff hist 0 N File:616.8.35a DECM 2018.pdf current
- 09:52, 18 May 2018 diff hist 0 N File:616.8.17a DECM 2018.pdf current
- 09:51, 18 May 2018 diff hist +10 m 616.8 Typical Applications (MUTCD 6H) →Listing of Typical Applications for Design and Construction and Materials: Per TS, corrected discrepancies between the TAs and standard plans regarding the sign number GO22-1 for Wet Paint Signs.
- 15:44, 17 May 2018 diff hist +1 m Category:110 State and Federal Wage Rates and Other Requirements →110.3.3 Semi-Annual Labor Report: Per CM, updated contact name
- 15:23, 17 May 2018 diff hist +1 m Main Page
- 14:55, 17 May 2018 diff hist +35 m Main Page
- 14:54, 17 May 2018 diff hist +51 m 617.2 Construction Inspection Guidelines for Sec 617
- 14:51, 17 May 2018 diff hist +303 m Main Page EPG 616.19.2.5, EPG 617.2, EPG 806.7
- 14:47, 17 May 2018 diff hist 0 N File:806 Zone 3.jpg current
- 14:46, 17 May 2018 diff hist 0 N File:806 Zone 2.jpg current
- 14:46, 17 May 2018 diff hist 0 N File:806 Zone 1.jpg current
- 14:45, 17 May 2018 diff hist 0 N File:806 design guidance map.jpg current
- 14:43, 17 May 2018 diff hist +2,557 Category:806 Pollution, Erosion and Sediment Control →Temporary Erosion Control Blankets (Sec. 806.90): Per Env'l, the types of erosion control blankets were increased and guidance now includes a matrix for choosing blanket types
- 14:39, 17 May 2018 diff hist +3 750.6 Erosion Control and Energy Dissipation →750.6.3.4 Erosion Control Blankets and Turf Reinforcement Mats: Per Env'l, the types of erosion control blankets were increased
- 14:23, 17 May 2018 diff hist -730 617.2 Construction Inspection Guidelines for Sec 617 Per EPS, clarified guidance for anchoring 2-loop and 3-loop concrete barriers on asphalt, composite and concrete pavements in work zones.
- 14:19, 17 May 2018 diff hist +11 616.19 Quality Standards for Temporary Traffic Control Devices →616.19.2.5 Temporary Traffic Barriers: Per EPS, clarified guidance for anchoring 2-loop and 3-loop concrete barriers on asphalt, composite and concrete pavements in work zones.
- 13:10, 14 May 2018 diff hist -34 m Main Page EPG 153.8
- 13:02, 14 May 2018 diff hist +21 m 153.9 Design
- 08:49, 14 May 2018 diff hist +882 m 153.9 Design Per DE, modified the reviewer column for DE43, DE44, DE46-49
- 12:05, 11 May 2018 diff hist -267 m Category:110 State and Federal Wage Rates and Other Requirements →Required Notices and Posters: Per CM, removed the associated numbers from the posters
- 12:03, 11 May 2018 diff hist +15 m Main Page
- 11:23, 11 May 2018 diff hist 0 N File:236.16 Vegetation Permit 2018.pdf current
- 11:23, 11 May 2018 diff hist 0 N File:236.16 Reject Vegetation Cover 2018.pdf current
- 11:22, 11 May 2018 diff hist -252 m 236.16 Outdoor Advertising Per Outdoor Advertising, updated two correspondence forms
- 11:05, 11 May 2018 diff hist -2 m Main Page
- 10:41, 11 May 2018 diff hist 0 m Category:110 State and Federal Wage Rates and Other Requirements →Required Notices and Posters
- 10:39, 11 May 2018 diff hist +268 m Main Page EPG 110.2
- 10:30, 11 May 2018 diff hist +406 m Category:110 State and Federal Wage Rates and Other Requirements →Required Notices and Posters: Per CM, added three Federal Aid Projects posters
- 14:56, 10 May 2018 diff hist +22 m 751.14 Steel Superstructure →751.14.5.9 Weathering Steel
- 14:54, 10 May 2018 diff hist 0 m 751.14 Steel Superstructure →751.14.5.8 Protective Coating Requirements
- 08:07, 10 May 2018 diff hist 0 N File:101 Floodplain Development Permit Application May 2018.pdf current
- 08:07, 10 May 2018 diff hist +4 m Category:101 Standard Forms Per BR, minor correction to Floodplain Development Permit Application
- 13:24, 9 May 2018 diff hist -1 m Category:110 State and Federal Wage Rates and Other Requirements
- 13:23, 9 May 2018 diff hist -1,251 m Main Page EPG 110.3.4
- 12:29, 9 May 2018 diff hist +920 m Category:110 State and Federal Wage Rates and Other Requirements →110.3.3 Semi-Annual Labor Report: Per CM, new guidance about the DOL's PW-2 form agreed to by DOL
- 08:48, 9 May 2018 diff hist -34 m Main Page EPG 231.4
- 08:46, 9 May 2018 diff hist +421 m 231.4 Shoulder Width →231.4.1 Introduction: Per DE, revised guidance about guardrail placement from the edge of the shoulder to bring guidance in line with Std Plan 606.00.
- 12:38, 7 May 2018 diff hist 0 m Main Page
- 11:16, 7 May 2018 diff hist 0 N File:Main Page May 7, 2018.jpg current
- 11:16, 7 May 2018 diff hist -35 m Main Page
- 08:17, 4 May 2018 diff hist +7 m 237.14 Electronic Design Data Delivery (BIM Deliverables) →237.14.3.5 Electronic Information for Bidder’s Automation: Per Bidding and Contracts, minor correction
- 07:25, 4 May 2018 diff hist 0 N File:910 TSMO.pdf current
- 07:24, 4 May 2018 diff hist +43 m Category:910 Intelligent Transportation Systems Per TS, added TSM&O info
- 15:22, 3 May 2018 diff hist -1 m 751.1 Preliminary Design →751.1.3.9 Environmental Considerations: Asbestos, Lead and Recoating
- 13:36, 3 May 2018 diff hist +34 m Main Page
- 13:33, 3 May 2018 diff hist 0 N File:Main Page Apr 3, 2018.gif current
- 13:33, 3 May 2018 diff hist 0 N File:Main Page May 3a, 2018.jpg current
- 13:33, 3 May 2018 diff hist 0 N File:Main Page May 3b, 2018.jpg current
- 13:32, 3 May 2018 diff hist +752 m Main Page
- 10:51, 3 May 2018 diff hist +179 m Main Page EPG 751.1.3.9
- 10:30, 3 May 2018 diff hist +2,950 m 751.1 Preliminary Design Per BR, new bridge preliminary design guidance for how to assess asbestos and lead considerations for structure removal, rehabs and recoatings and how to address these considerations on Bridge Memo
- 11:16, 2 May 2018 diff hist -355 m Main Page EPG 237.14.3.6
- 07:33, 2 May 2018 diff hist +810 m 237.14 Electronic Design Data Delivery (BIM Deliverables) →237.14.3.6 Electronic Design Data for MoDOT Construction: Per CADD, clarified guidance
- 12:06, 1 May 2018 diff hist +152 m 238.3 Route Surveying →238.3.36.3.3 Field Notebooks: Per BR, corrected error
- 11:17, 1 May 2018 diff hist -1 m Main Page
- 09:21, 1 May 2018 diff hist +150 m Category:747 Bridge Reports and Layouts
- 13:45, 30 April 2018 diff hist 0 m 751.36 Driven Piles →751.36.3 Design Procedure: Per BR, minor correction
- 13:39, 30 April 2018 diff hist -238 m 236.16 Outdoor Advertising Per Outdoor Advertising, updated links
- 09:10, 30 April 2018 diff hist +346 m Main Page EPG 236.16
- 09:04, 30 April 2018 diff hist -2,351 m 236.16 Outdoor Advertising Per Outdoor Advertising, several revisions due to Administrative Rule Revisions
- 08:30, 30 April 2018 diff hist -7 m Category:747 Bridge Reports and Layouts →747.2.2.4 GEO Files for Stream Crossings: Per CADD, minor updates
- 11:24, 27 April 2018 diff hist -149 Main Page
- 11:19, 27 April 2018 diff hist 0 N File:Main Page Apr 27, 2018.jpg current
- 11:18, 27 April 2018 diff hist -116 m Main Page
- 10:29, 27 April 2018 diff hist +99 m 102.2 Contractor Performance Rating System →102.2.7 Performance Discussion: Per CM, guidance for when certified mail is necessary for the Contractor Performance Rating replaced older guidance.
- 13:34, 26 April 2018 diff hist -643 m Main Page
- 15:19, 25 April 2018 diff hist 0 N File:751.12.2.3 Non-integral 1 2018.jpg current
- 15:19, 25 April 2018 diff hist 0 N File:751.12.2.3 Integral 1 2018.jpg current
- 15:18, 25 April 2018 diff hist +10 m 751.12 Barriers, Railings, Curbs and Fences →751.12.2.3 End Bent Reinforcement: Per BR, corrected dimensions for K5-K8 bars placed in end bent wings and extending into bridge barrier.
- 14:30, 25 April 2018 diff hist -688 m Main Page EPG 751.50
- 14:27, 25 April 2018 diff hist +410 m 751.50 Standard Detailing Notes →E2. Foundation Data Table: Per BR, new std detailing note about deviations in galvanized pile penetration
- 08:40, 25 April 2018 diff hist -263 m 620.2 Pavement and Curb Markings (MUTCD Chapter 3B) →620.2.9 Lane Reduction Transition Markings (MUTCD Section 3B.09): Per TS, deleted Fig. 620.2.9.3 since Fig. 620.2.9.1 already covers Fig. 620.2.9.3's critical concepts.
- 08:27, 24 April 2018 diff hist +9 m Category:403 Asphaltic Concrete Pavement →403.1.18 Quality Assurance (Sec 403.18)
- 15:20, 23 April 2018 diff hist +1 m Main Page
- 09:12, 23 April 2018 diff hist +9 Category:1091 Lighting Equipment
- 09:11, 23 April 2018 diff hist -9 Category:1091 Lighting Equipment
- 09:09, 23 April 2018 diff hist 0 Category:1091 Lighting Equipment
- 11:08, 20 April 2018 diff hist +38 m Category:130 Value Engineering →130.2 Value Engineering Change Proposals: Per EPS, updated link
- 14:52, 16 April 2018 diff hist 0 m Category:110 State and Federal Wage Rates and Other Requirements →Required Notices and Posters
- 12:51, 16 April 2018 diff hist -936 m Main Page EPG 903.4.6
- 12:48, 16 April 2018 diff hist +70 m 903.4 Overhead Sign Mounting →903.4.6 Span, Cantilever and Butterfly Box Trusses
- 12:24, 16 April 2018 diff hist +257 m 903.4 Overhead Sign Mounting →903.4.6 Span, Cantilever and Butterfly Box Trusses: Per BR and TS, corrected verbiage that has caused complexities. MoDOT may be the designer and if not, others will submit signed & sealed dwgs.
- 10:24, 16 April 2018 diff hist +412 m Category:235 Preliminary Plans →235.8.2 FAA’s Notice Criteria Tool: Per Bidding and Contract, additional guidance for core teams on appropriately considering the max equipment height for construction projects involving airports
- 13:59, 13 April 2018 diff hist -10 m Main Page EPG 751.50
- 12:34, 13 April 2018 diff hist +2,646 751.50 Standard Detailing Notes Per BR, new clarifying note D1.5; archaic option in D1.21 replaced with current option; new H9.29 for 2 thrie beam std dwgs
- 07:45, 13 April 2018 diff hist 0 m 949.2 Speed Limit Guidelines →949.2.3 Additional Guidelines for Establishing Speed Limits: Per TS, minor clarification
- 12:56, 11 April 2018 diff hist -566 m Main Page EPG 751.8
- 12:51, 11 April 2018 diff hist 0 N File:751.8.3.4.jpg current
- 12:50, 11 April 2018 diff hist +1,473 m 751.8 LRFD Concrete Box Culverts Per BR, added guidance for culvert wing walls on rock.
- 08:01, 11 April 2018 diff hist +60 m 127.25 Maintenance Environmental Policies
- 07:57, 11 April 2018 diff hist -192 m 127.25 Maintenance Environmental Policies Per Env'l, updated several links
- 12:53, 10 April 2018 diff hist +10 m Main Page EPG 110.1
- 11:28, 10 April 2018 diff hist +715 m LPA:136.13 LPA Policy Changes EPG 136.9.4.1.1.10.1
- 11:17, 10 April 2018 diff hist 0 m LPA:136.9 Plans, Specs and Estimates (PSE) →136.9.4.1.1.10.1 Federal Wage Rates (23 USC 113 and 29 CFR 5)
- 11:16, 10 April 2018 diff hist -5 m LPA:136.9 Plans, Specs and Estimates (PSE) →136.9.4.1.1.10.1 Federal Wage Rates (23 USC 113 and 29 CFR 5)
- 11:15, 10 April 2018 diff hist +269 m LPA:136.9 Plans, Specs and Estimates (PSE) →136.9.4.1.1.10.1 Federal Wage Rates (23 USC 113 and 29 CFR 5): Per FHWA and DE, updated guidance about including the correct wage rate order from the Dept. of Labor on both MoDOT and LPA projects
- 11:11, 10 April 2018 diff hist +437 m Category:110 State and Federal Wage Rates and Other Requirements →110.1 Wage Rates (Guidance for Sec 110.1): Per FHWA and DE, updated guidance about including the correct wage rate order from the Dept. of Labor on both MoDOT and LPA projects.
- 09:30, 10 April 2018 diff hist -2 m 751.6 General Quantities →751.6.1 Index of Quantities
- 09:06, 10 April 2018 diff hist +189 m 751.6 General Quantities →751.6.1 Index of Quantities: Per BR, added Open Cell Foam Joint System pay items
- 13:05, 9 April 2018 diff hist -193 m Main Page EPG 127.29.7
- 13:01, 9 April 2018 diff hist +695 127.29 Stormwater →127.29.7 MCM 5: Post-Construction Stormwater Management in New Development and Redevelopment: Per Env'l, added guidance per permit agreement with MDNR.
- 14:36, 6 April 2018 diff hist 0 N File:Main Page Apr 6c, 2018.jpg current
- 14:36, 6 April 2018 diff hist 0 N File:Main Page Apr 6b, 2018.gif current
- 14:36, 6 April 2018 diff hist 0 Main Page
- 14:35, 6 April 2018 diff hist 0 N File:Main Page Apr 6a, 2018.jpg current
- 14:35, 6 April 2018 diff hist 0 N File:Main Page Apr 6, 2018.jpg current
- 14:34, 6 April 2018 diff hist +739 m Main Page
- 12:28, 6 April 2018 diff hist +16 m 320.4 Procedure for Final Sounding Per BR, updated Request for Final Soundings for Structures Form
- 12:27, 6 April 2018 diff hist +8 m 320.3 Drilling Operations Per BR, updated Request for Final Soundings for Structures Form
- 12:25, 6 April 2018 diff hist 0 N File:751.1.2.19 Guidance 2018.xlsx
- 12:24, 6 April 2018 diff hist -2 m 751.1 Preliminary Design Per BR, updated Request for Final Soundings for Structures Form and Guidance for Request for Final Soundings of Structures
- 12:21, 6 April 2018 diff hist 0 N File:751.1.2.20 Request Apr 2018.xlsx current
- 12:20, 6 April 2018 diff hist +4 m Category:101 Standard Forms Per BR, updated Request for Final Soundings for Structures Form
- 13:29, 5 April 2018 diff hist -93 m Main Page EPG 110.2
- 13:26, 5 April 2018 diff hist +1 Category:110 State and Federal Wage Rates and Other Requirements →Required Notices and Posters: Per CM, revised the bulletin board inspection rate from every two months to every three months.
- 09:37, 5 April 2018 diff hist +101 m Main Page EPG 749.5
- 09:07, 5 April 2018 diff hist +2,610 Category:749 Hydrologic Analysis Per BR, revised Time of Concentration equation guidance by providing optional combination of Kirby-Hathaway & Kirpich equations and adding the optional low slope factor presented in the new research.
- 15:26, 4 April 2018 diff hist +7 m 237.14 Electronic Design Data Delivery (BIM Deliverables) →237.14.5 Glossary of Terms
- 15:19, 4 April 2018 diff hist +53 m 237.14 Electronic Design Data Delivery (BIM Deliverables) →237.14.5 Glossary of Terms: Per CADD, minor revisions to glossary terms
- 15:10, 4 April 2018 diff hist +12 m Category:747 Bridge Reports and Layouts Per BR, Bridge Survey Report further edited
- 15:09, 4 April 2018 diff hist +6 m 238.3 Route Surveying
- 15:08, 4 April 2018 diff hist +6 m Category:101 Standard Forms
- 15:07, 4 April 2018 diff hist 0 N File:747 Bridge Survey Report April 2018.docx current
- 15:07, 4 April 2018 diff hist +6 m Main Page
- 14:34, 4 April 2018 diff hist -311 m Main Page Bridge Survey Report
- 14:29, 4 April 2018 diff hist -41 m Category:101 Standard Forms →Bridge: Per BR, updated Bridge Survey Report
- 14:28, 4 April 2018 diff hist -42 m 238.3 Route Surveying Per BR, updated Bridge Survey Report
- 14:26, 4 April 2018 diff hist 0 N File:747 Bridge Survey Report 2018.docx current
- 14:25, 4 April 2018 diff hist -78 m Category:747 Bridge Reports and Layouts Per BR, updated Bridge Survey Report
- 12:55, 4 April 2018 diff hist +7 m 127.29 Stormwater →127.29.7 Post-Construction Stormwater Management in New Development and Redevelopment
- 10:17, 4 April 2018 diff hist 0 m LPA:136.8 Local Public Agency Land Acquisition
- 08:43, 4 April 2018 diff hist -93 m 751.50 Standard Detailing Notes Per BR, several minor clarifications
- 08:15, 4 April 2018 diff hist 0 N File:751.50 E3.2 boring.jpg current
- 12:53, 3 April 2018 diff hist -163 m Main Page EPG 237.13.5
- 12:49, 3 April 2018 diff hist -62 m 237.13 Contract Plan File Name Convention →237.13.5 Example Set of Electronic Design Data: Per CADD, updated the chart with current examples
- 11:23, 3 April 2018 diff hist -3 m Category:756 Seismic Design
- 11:21, 3 April 2018 diff hist -3 m Category:756 Seismic Design
- 11:20, 3 April 2018 diff hist +46 m Category:756 Seismic Design
- 11:18, 3 April 2018 diff hist +64 m 751.2 Loads →751.2.2.6 Other Loads: Per BR, minor clarification
- 10:36, 3 April 2018 diff hist 0 m 237.14 Electronic Design Data Delivery (BIM Deliverables)
- 10:36, 3 April 2018 diff hist +353 m 237.14 Electronic Design Data Delivery (BIM Deliverables)
- 10:18, 3 April 2018 diff hist +3 m 237.14 Electronic Design Data Delivery (BIM Deliverables) →237.14.5 Glossary of Terms
- 10:14, 3 April 2018 diff hist +68 m 237.14 Electronic Design Data Delivery (BIM Deliverables) →237.14.5 Glossary of Terms
- 10:00, 3 April 2018 diff hist +1 237.14 Electronic Design Data Delivery (BIM Deliverables) →237.14.5 Glossary of Terms
- 12:08, 2 April 2018 diff hist 0 N File:Main Page Apr 2, 2018.jpg current
- 12:08, 2 April 2018 diff hist -208 m Main Page EPG 236.5.16
- 10:45, 2 April 2018 diff hist +672 m 236.5 Property Management →236.5.16 Legal Opinion of Title: Per RW, clarified the legal title of opinion for excess property appraised for $25,000 or less that include any references to RW in the acquisition deed.
- 09:49, 2 April 2018 diff hist +292 m Main Page EPG 616.8, EPG 616.27
- 09:33, 2 April 2018 diff hist +24 m 616.27 MoDOT Fleet Lighting
- 09:22, 2 April 2018 diff hist 0 N File:616.8.35d MT Apr 2018.pdf current
- 09:21, 2 April 2018 diff hist 0 N File:616.8.35c MT Apr 2018.pdf current
- 09:21, 2 April 2018 diff hist 0 N File:616.8.35b MT Apr 2018.pdf current
- 09:21, 2 April 2018 diff hist 0 N File:616.8.35a MT Apr 2018.pdf current
- 09:21, 2 April 2018 diff hist 0 N File:616.8.35 MT Apr 2018.pdf current
- 09:20, 2 April 2018 diff hist +20 m 616.8 Typical Applications (MUTCD 6H) Per TS, clarified light bar policy in TA-35 and TAs 35a-d by adding "SEE NOTE".
- 09:07, 2 April 2018 diff hist +494 m 616.27 MoDOT Fleet Lighting TS, updated light bar guidance to bring in line with TAs
- 13:33, 29 March 2018 diff hist +531 m LPA:136.13 LPA Policy Changes EPG 136.6.4.1
- 13:29, 29 March 2018 diff hist +463 m LPA:136.6 Environmental and Cultural Requirements →136.6.4.1 Section 106 (Cultural Resource) Compliance: Per Env'l, clarified procedures in Section 106 (Cultural Resource) Compliance
- 12:39, 29 March 2018 diff hist +316 m LPA:136.13 LPA Policy Changes EPG 136.11.5
- 12:37, 29 March 2018 diff hist -124 m LPA:136.11 Local Public Agency Construction →136.11.5 Subcontracts: Per CM, removed one archaic sentence of guidance about Form C-220
- 12:20, 28 March 2018 diff hist +38 m Main Page EPG 134
- 11:32, 28 March 2018 diff hist +617 m Category:134 Engineering Professional Services Per DE and ECR, DBE Concurrence may now be obtained electronically in eAgreements. Consultant Contract guidance was updated.
- 09:20, 28 March 2018 diff hist -51 m Main Page
- 15:19, 27 March 2018 diff hist 0 N File:Main Page Mar 27, 2018.jpg current
- 15:19, 27 March 2018 diff hist +93 m Main Page
- 13:28, 27 March 2018 diff hist -248 m Main Page EPG 751.2.2
- 13:25, 27 March 2018 diff hist +42 m 751.2 Loads
- 12:52, 27 March 2018 diff hist +12 m Main Page
- 12:51, 27 March 2018 diff hist +11 m Main Page EPG 402 and EPG 409
- 12:18, 27 March 2018 diff hist 0 N File:127.25.2.1 Hazardous 2018.docx current
- 12:18, 27 March 2018 diff hist +5 m 127.25 Maintenance Environmental Policies Per MT, updated ''Hazardous Materials Response Plan'' document
- 11:37, 27 March 2018 diff hist 0 N File:402 FY2019 Contract Leveling Coat Guidelines a.docx current
- 11:37, 27 March 2018 diff hist +2 m Category:402 Bituminous Surface Leveling
- 11:36, 27 March 2018 diff hist 0 N File:409 FY2019 Contract Seal Coat Guidelines a.docx current
- 11:36, 27 March 2018 diff hist +2 m Category:409 Seal Coat
- 11:28, 27 March 2018 diff hist 0 N File:409 FY2019 Contract Seal Coat Guidelines.docx current
- 11:27, 27 March 2018 diff hist 0 N File:409 FY 2019 Seal Coat MoDOT.pdf current
- 11:26, 27 March 2018 diff hist 0 N File:409 FY 2019 Seal Coat Contractor.pdf current
- 11:26, 27 March 2018 diff hist +16 m Category:409 Seal Coat Per DE, the CLC and JSP packages were updated
- 11:23, 27 March 2018 diff hist 0 N File:402 CLC MoDOT 2018.pdf current
- 11:22, 27 March 2018 diff hist 0 N File:402 CLC Contractor 2018.pdf current
- 11:21, 27 March 2018 diff hist 0 N File:402 FY2019 Contract Leveling Coat Guidelines.docx current
- 11:19, 27 March 2018 diff hist +36 m Category:402 Bituminous Surface Leveling Per DE, the CLC and JSP packages were updated
- 08:41, 27 March 2018 diff hist +107 m 751.2 Loads →751.2.2 Transient Loads: Per BR, Wind Pressure on Vehicles, Braking force, and Centrifugal force are assumed to act horizontally at the roadway surface, per AASHTO agenda 2005
- 15:00, 26 March 2018 diff hist 0 N File:127.1 Instructions.doc
- 15:00, 26 March 2018 diff hist +3 m 127.1 Request for Environmental Services
- 14:59, 26 March 2018 diff hist -56 m 127.1 Request for Environmental Services Per Env'l, updated How to Complete the Request for Env'l Services (formerly "Instructions for the RES Form")
- 14:47, 26 March 2018 diff hist -1 LPA:136.13 LPA Policy Changes
- 14:46, 26 March 2018 diff hist +131 m LPA:136.13 LPA Policy Changes Fig. 136.6.4
- 14:45, 26 March 2018 diff hist +122 m LPA:136.12 Figures, Glossary and Other Useful Links Per Env'l, updated Fig. 136.6.4 How to Complete the Request for Env'l Review
- 14:42, 26 March 2018 diff hist 0 N File:136.6.4 instructions 2018.doc
- 14:42, 26 March 2018 diff hist 0 m LPA:136.6 Environmental and Cultural Requirements Per Env'l, updated Fig. 136.6.4 How to Complete the Request for Env'l Review
- 12:56, 23 March 2018 diff hist 0 N File:823 Incarcerated Manual.pdf current
- 12:55, 23 March 2018 diff hist -96 m Category:823 Incarcerated Personnel Work Release Program Per MT, updated link to Incarcerated Personnel Work Release Program Manual current
- 12:08, 23 March 2018 diff hist 0 m 320.4 Procedure for Final Sounding Per BR, updated Soil Properties Request Form
- 12:06, 23 March 2018 diff hist 0 m 320.3 Drilling Operations Per BR, updated Soil Properties Request Form
- 12:05, 23 March 2018 diff hist +5 m Category:101 Standard Forms →Bridge
- 12:04, 23 March 2018 diff hist -10 m Category:101 Standard Forms →Bridge: Per BR, updated Soil Properties Request Form
- 11:32, 23 March 2018 diff hist 0 N File:751.1.2.20 Request 2018.xlsx current
- 11:32, 23 March 2018 diff hist -10 m 751.1 Preliminary Design Per BR, updated Soil Properties Request Form
- 15:04, 22 March 2018 diff hist +15 m 236.16 Outdoor Advertising Per Outdoor Advertising, updated link
- 11:33, 22 March 2018 diff hist +47 m Category:121 Project Planning, Prioritization and STIP Commitments
- 11:06, 22 March 2018 diff hist 0 N File:121 Planning Framework.docx current
- 11:05, 22 March 2018 diff hist +261 m Category:121 Project Planning, Prioritization and STIP Commitments Per TP, added document, "The Planning Framework for Transportation Decision Making"
- 09:08, 21 March 2018 diff hist 0 N File:606.1.3.1 Guardrail Length of Need Calculator Mar 2018.xlsx
- 09:08, 21 March 2018 diff hist +8 m 606.1 Guardrail Two minor revisions to the Guardrail Length of Need Calculator
- 15:16, 20 March 2018 diff hist +5 m Category:756 Seismic Design
- 15:12, 20 March 2018 diff hist -92 m Category:756 Seismic Design Per BR, clarified seismic information.
- 15:06, 20 March 2018 diff hist 0 N File:756 LRFD flowchart.pdf
- 14:52, 20 March 2018 diff hist +304 m 751.2 Loads →751.2.2.6 Other Loads: Per BR, clarified seismic information.
- 14:47, 20 March 2018 diff hist +1,990 m 751.1 Preliminary Design Per BR, clarified seismic information.
- 11:17, 20 March 2018 diff hist +213 m 751.5 Structural Detailing Guidelines →751.5.9.2.2 Epoxy Coated Reinforcement Requirements: Per BR, clarified Feb 2017 policy expanding the use of epoxy coated reinforcement in bridge structures
- 10:53, 20 March 2018 diff hist +40 m Main Page EPG 103.1.6.6.1.2
- 10:50, 20 March 2018 diff hist +638 m 103.1 Bid Opening and Award Process →103.1.6.6.1.2 File Naming Convention for Plan Sheet Changes: Per Bidding and Contracts, updated guidance for ProjectWise
- 10:17, 16 March 2018 diff hist -13 m Main Page EPG 237.14
- 09:57, 16 March 2018 diff hist 0 N File:237.14.2.8.jpg current
- 09:57, 16 March 2018 diff hist +30,027 m 237.14 Electronic Design Data Delivery (BIM Deliverables) Per CADD, article completely rewritten
- 09:36, 16 March 2018 diff hist +1,087 m 237.9 Submission of Plans and Supporting Documents →237.9.3.3.3 Electronic Deliverables File: "Electronic Deliverables" used to be some of the files to be included. Now each file is named and collected in a ZIP file called "Electronic Deliverables"
- 13:47, 14 March 2018 diff hist +33 m 236.3 Administration Per RW, in EPG 236.3.5.2, replaced Form 238.2.17 Professional Land Surveyor Description Review Form with new "Legal Description, Exhibit A" form
- 13:39, 14 March 2018 diff hist -1 m 236.7 Negotiation →236.7.2.20 Acquisition by Condemnation
- 13:39, 14 March 2018 diff hist +34 m 236.7 Negotiation →236.7.2.20 Acquisition by Condemnation: Per RW, replaced Form 238.2.17 Professional Land Surveyor Description Review Form with new "Legal Description, Exhibit A" form
- 13:21, 14 March 2018 diff hist -9 m 238.2 Land Surveying Per RW, replaced Form 238.2.17 Professional Land Surveyor Description Review Form with new "Legal Description, Exhibit A" form
- 12:45, 14 March 2018 diff hist -30 m Category:Safe and Sound →Schedule: updated PS&E Due Date chart link
- 12:42, 14 March 2018 diff hist -44 m 237.9 Submission of Plans and Supporting Documents updated PS&E Due Date chart link
- 12:40, 14 March 2018 diff hist -42 m 103.1 Bid Opening and Award Process updated PS&E Due Date chart link
- 11:44, 9 March 2018 diff hist -62 m Main Page EPG 751.1.2.21
- 11:42, 9 March 2018 diff hist +410 m 751.1 Preliminary Design →751.1.2.21 Substructure Type: Per BR, min galvanized penetration guidance added for retaining wall piles supported on piles & bridge end bents on piles with embankments supported by MSE walls
- 16:12, 8 March 2018 diff hist 0 m 127.16 Wetland and Stream Mitigation
- 15:54, 8 March 2018 diff hist +125 m Main Page
- 15:32, 8 March 2018 diff hist -10 m Category:101 Standard Forms →Utility or Right of Way Related: Updated link to Permit for Work on Right of Way
- 14:52, 8 March 2018 diff hist +3 m Main Page
- 13:58, 8 March 2018 diff hist -6 m Category:612 Impact Attenuators →612.1.3 MoDOT Protective Vehicle/TMA Guidelines
- 13:46, 8 March 2018 diff hist -103 m Category:101 Standard Forms Per ECR and CM, deleted archaic Spanish version of the Wage Interview Form (CR-1)
- 13:45, 8 March 2018 diff hist -110 m Category:110 State and Federal Wage Rates and Other Requirements Per ECR and CM, deleted archaic Spanish version of the Wage Interview Form (CR-1)
- 12:39, 8 March 2018 diff hist +51 m Main Page EPG 612, EPG 616.8
- 12:10, 8 March 2018 diff hist 0 N File:616.8.35d MT 2018.pdf current
- 12:10, 8 March 2018 diff hist 0 N File:616.8.35c MT 2018.pdf current
- 12:10, 8 March 2018 diff hist 0 N File:616.8.35b MT 2018.pdf current
- 12:10, 8 March 2018 diff hist 0 N File:616.8.35a MT 2018.pdf current
- 12:09, 8 March 2018 diff hist 0 N File:616.8.35 MT 2018.pdf current
- 12:09, 8 March 2018 diff hist +25 m 616.8 Typical Applications (MUTCD 6H) Per TS, the TMA Light Bar is now temporarily optional and not required to be purchased for use. TA 35 MT and TAs 35a-d MT
- 11:49, 8 March 2018 diff hist +228 m Category:612 Impact Attenuators →612.1.3 MoDOT Protective Vehicle/TMA Guidelines: Per TS, the TMA Light Bar is now temporarily optional and not required to be purchased for use.
- 16:27, 7 March 2018 diff hist -70 m 127.25 Maintenance Environmental Policies →127.25.2.2 MoDOT Hazardous Material Spills: Per Env'l, updated link
- 16:22, 7 March 2018 diff hist +49 m 127.25 Maintenance Environmental Policies →127.25.2.2 MoDOT Hazardous Material Spills: Per Env'l, updated link
- 16:14, 7 March 2018 diff hist +198 m 751.12 Barriers, Railings, Curbs and Fences →751.12.4 Chain Link Fence: Per BR, clarified wind load and dead load for chain link fence.
- 16:06, 5 March 2018 diff hist +766 m Category:1040 Guardrail, End Terminals, One-Strand Access Restraint Cable and Three-Strand Guard Cable Material →Table 1040.2.1.1 List of Prequalified Guardrail Fabricators Brand Registration and Guarantee on File: Per CM, added manufacturer
- 15:20, 2 March 2018 diff hist +430 m 153.13 Highway Safety Per HS, added HS07 agreement
- 14:47, 2 March 2018 diff hist 0 m 237.13 Contract Plan File Name Convention →237.13.2 Electronic Design Data: Per CADD, corrected file naming convention
- 11:55, 2 March 2018 diff hist -242 m Category:702 Load-Bearing Piles Per CM, most recent revision deleted since it was deemed incorrect
- 11:50, 2 March 2018 diff hist 0 N File:702.pdf current
- 11:50, 2 March 2018 diff hist +12 m Category:702 Load-Bearing Piles →702.1.5 Pile Driving Documentation
- 11:47, 2 March 2018 diff hist +242 m Category:702 Load-Bearing Piles →702.1.5 Pile Driving Documentation: Per BR, clarified that reporting of PDA data is not required when piles are driven to rock.
- 11:38, 2 March 2018 diff hist +4 m 750.7 Non-Hydraulic Considerations →750.7.2.3 Roadways and Roadside Applications with ADT < 1700
- 11:35, 2 March 2018 diff hist +53 m 750.7 Non-Hydraulic Considerations →750.7.2.3 Roadways and Roadside Applications with ADT < 1700
- 11:33, 2 March 2018 diff hist +9 m Category:941 Permits and Access Requests →941.6.3.7 Construction Inspection
- 11:28, 2 March 2018 diff hist 0 N File:730.3.jpg current
- 10:56, 2 March 2018 diff hist 0 m Category:732 Flared End Sections →732.1 Installation: Corrected link
- 10:31, 2 March 2018 diff hist -2 m Main Page
- 10:06, 1 March 2018 diff hist +3 m 616.18 Construction Inspection Guidelines for Sec 616 →Flagger Requirements (for Sec 616.4.3): Updated sign no. for PLEASE WAIT FOR PILOT CAR to G20-4a
- 10:04, 1 March 2018 diff hist -2 m 616.3 Temporary Traffic Control Elements (MUTCD Chapter 6C) →616.3.13 Pilot Car Method of One-Lane, Two-Way Traffic Control (MUTCD 6C.13)
- 10:00, 1 March 2018 diff hist +17 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →Table 616.6.58: Updated sign no. for PLEASE WAIT FOR PILOT CAR to G20-4a
- 08:56, 28 February 2018 diff hist -664 m 153.16 Maintenance Per TS, MT and Comm Secr, TR57 replaced MT27
- 15:46, 27 February 2018 diff hist +7 m 751.24 LFD Retaining Walls →751.24.2.1 Design: Per BR, minor clarifications
- 12:02, 27 February 2018 diff hist -239 m Main Page EPG 450
- 11:56, 27 February 2018 diff hist 0 N File:450 Estimate Factors 2018.doc current
- 11:56, 27 February 2018 diff hist +10 m Category:450 Bituminous Pavement Design Per EPS, updated Tack Coat estimate factors
- 11:36, 27 February 2018 diff hist 0 N File:Main Page Feb 27, 2018.jpg current
- 11:35, 27 February 2018 diff hist +126 m Main Page
- 11:16, 27 February 2018 diff hist 0 m 901.7 Light Source and Intensity →901.7.2 Average Maintained Intensity
- 11:01, 27 February 2018 diff hist -100 m 901.7 Light Source and Intensity →901.7.2 Average Maintained Intensity: Per EPS, updated link
- 10:27, 27 February 2018 diff hist +1,031 m 153.21 Traffic Per TS, added three new agreements (TR55, TR56, TR57)
- 15:01, 26 February 2018 diff hist -203 m 238.2 Land Surveying →238.2.8 Survey Property Damage: Per RW, removed reference to archaic RW11 agreement
- 14:51, 26 February 2018 diff hist +1 m 751.24 LFD Retaining Walls →751.24.2.1 Design
- 13:47, 26 February 2018 diff hist 0 m 751.24 LFD Retaining Walls →751.24.2.1 Design: Per Br, minor cosmetic clarification
- 12:08, 26 February 2018 diff hist +35 m Category:110 State and Federal Wage Rates and Other Requirements Per CM, updated links
- 13:36, 23 February 2018 diff hist -714 m 236.14 Change in Route Status Report →236.14.6 Roadway Relinquishment Agreement: Per RW, removed outdated forms and references to the forms (RW5, RW6, RW19, RW32)
- 13:35, 23 February 2018 diff hist -680 m 236.6 Appraisal and Appraisal Review Per RW, removed outdated forms and references to the forms (RW5, RW6, RW19, RW32)
- 13:28, 23 February 2018 diff hist -60 m 236.7 Negotiation Per RW, removed outdated forms and references to the forms (RW5, RW6, RW19, RW32)
- 10:49, 23 February 2018 diff hist -463 m 901.11 Light Emitting Diode (LED) Luminaire Performance and Computation of Roadway Illumination Per TS, removed archaic non-LED figures
- 08:59, 23 February 2018 diff hist -2,359 m 153.20 Right of Way Per RW, removed obsolete forms RW05, 06, 09, 07, 11, 19, 26, 30, 32 and 38.
- 14:12, 22 February 2018 diff hist +99 m Category:450 Bituminous Pavement Design →450.9 Safety EdgeSM: Per EPS, brought article in accordance with new Std Plan 401.00 Sheet 3
- 14:11, 22 February 2018 diff hist -141 m Category:550 Portland Cement Concrete Pavement Design →550.1 Safety EdgeSM: Per EPS, brought article in accordance with new Std Plan 401.00 Sheet 3
- 13:01, 22 February 2018 diff hist -252 m Main Page EPG 146.2
- 12:57, 22 February 2018 diff hist +345 m Category:146 Disadvantaged Business Enterprise (DBE) →146.2 DBE Subcontract: Per ECR, clarification regarding overruns and underruns as they relate to DBE participation.
- 13:09, 21 February 2018 diff hist -385 m 153.21 Traffic Per MT, TS and Commission Secr, replaced TR57 with MT27.
- 13:08, 21 February 2018 diff hist -609 m 153.9 Design Per MT, DE and Commission Secr, replaced DE64 and DE65 with MT01 and MT17, respectively.
- 13:07, 21 February 2018 diff hist +1,447 m 153.16 Maintenance Per MT, DE and Commission Secr, replaced DE64 and DE65 with MT01 and MT17, respectively. Per MT, TS and Commission Secr, replaced TR57 with MT27.
- 12:23, 21 February 2018 diff hist -1,447 m 153.16 Maintenance Per MT, DE and Commission Secr, moved former MT01 and MT17 to DE64 and DE65 respectively. Per MT, TS and Commission Secr, moved former MT27 to TR57.
- 12:21, 21 February 2018 diff hist +385 m 153.21 Traffic Per MT, TS and Commission Secr, moved former MT27 to TR57.
- 12:09, 21 February 2018 diff hist +609 m 153.9 Design Per MT, DE and Commission Secr, moved former MT01 and MT17 to DE64 and DE65 respectively.
- 11:15, 21 February 2018 diff hist 0 N File:101 DBE Identification Submittal Form.pdf current
- 11:15, 21 February 2018 diff hist +6 m Category:101 Standard Forms →Construction and Contractor Related: Per ECR, added DBE Identification Submittal Form (replacing "DBE Program Submittal" form)
- 14:15, 20 February 2018 diff hist +1 m Main Page
- 13:06, 20 February 2018 diff hist -38 m 751.6 General Quantities Per BR, “Supplementary television camera inspection” was recently revised to “video camera inspection” in both the official bid listing and Sec 701
- 13:56, 16 February 2018 diff hist 0 m Category:806 Pollution, Erosion and Sediment Control →Silt Fence
- 13:49, 16 February 2018 diff hist -699 m Category:806 Pollution, Erosion and Sediment Control →806.2.1 Temporary Measures: Per DE. In 2009 Type I and Type II ditch checks were replaced w/ rock and alternate ditch checks; straw bails were removed from use as ditch checks.
- 12:21, 16 February 2018 diff hist -24 m Main Page EPG 134, EPG 153.8
- 11:11, 16 February 2018 diff hist +100 m 153.9 Design Per ECR and DE, DBE Concurrence must be requested prior to executing a consultant contracts
- 11:04, 16 February 2018 diff hist +1,830 m Category:134 Engineering Professional Services Per ECR and DE, DBE Concurrence must be requested prior to executing a consultant contracts
- 12:29, 15 February 2018 diff hist -9 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →Table 616.6.50: Per TS, corrected sign no of WET PAINT (Arrow Pivots)
- 12:20, 15 February 2018 diff hist 0 N File:Figure 901.13.10.pdf current
- 12:20, 15 February 2018 diff hist -15 m 901.13 Lighting Proposed by Other Political Subdivisions on State Highways →901.13.10 Submittal: Per TS, updated Fig. 901.13.10 with LED info
- 12:17, 15 February 2018 diff hist 0 N File:901.13.4.pdf current
- 12:17, 15 February 2018 diff hist +223 m 901.13 Lighting Proposed by Other Political Subdivisions on State Highways →901.13.4 Lighting Style, Luminaire Type and Mounting Height
- 12:12, 15 February 2018 diff hist -55 m Category:101 Standard Forms Per TS, updated figures with LED info
- 12:11, 15 February 2018 diff hist 0 N File:Form D21 2018.pdf current
- 12:11, 15 February 2018 diff hist +4 m 901.6 Programming Per TS, updated D21 with LED info
- 11:50, 15 February 2018 diff hist -220 m 901.11 Light Emitting Diode (LED) Luminaire Performance and Computation of Roadway Illumination Per TS, updated figures with LED info
- 11:48, 15 February 2018 diff hist 0 N File:901.11.7.pdf current
- 11:48, 15 February 2018 diff hist 0 N File:901.11.6.pdf current
- 11:48, 15 February 2018 diff hist -132 m 901.11 Light Emitting Diode (LED) Luminaire Performance and Computation of Roadway Illumination Per TS, updated figures with LED info
- 11:44, 15 February 2018 diff hist -24 m 901.9 Layout Per TS, updated figures with LED info
- 11:41, 15 February 2018 diff hist 0 N File:901.7.5.pdf current
- 11:41, 15 February 2018 diff hist 0 N File:901.7.4.pdf current
- 11:41, 15 February 2018 diff hist 0 N File:901.7.3.pdf current
- 11:41, 15 February 2018 diff hist 0 N File:901.7.2.pdf current
- 11:41, 15 February 2018 diff hist 0 N File:901.7.1.pdf current
- 11:40, 15 February 2018 diff hist -581 m 901.7 Light Source and Intensity Per TS, updated figures with LED info
- 11:31, 15 February 2018 diff hist 0 N File:901.2.1.pdf current
- 11:30, 15 February 2018 diff hist -94 m 901.2 Lighting to be Provided, Operated, and Maintained at the Expense of the Local Political Subdivision Per TS, updated Fig. 901.2.1 with LED info
- 11:22, 15 February 2018 diff hist 0 N File:101 No Rise Certificate 2018.pdf
- 11:22, 15 February 2018 diff hist 0 m Category:101 Standard Forms →Bridge: Per BR, minor update for No-Rise Certificate
- 09:30, 15 February 2018 diff hist +934 m 153.11 Financial Services Per FS, added F31 and F32 info
- 14:31, 14 February 2018 diff hist +88 m 751.50 Standard Detailing Notes →G7. Steel HP Pile
- 14:30, 14 February 2018 diff hist +88 m 751.1 Preliminary Design →751.1.2.21 Substructure Type
- 14:20, 14 February 2018 diff hist -12 m 751.1 Preliminary Design →751.1.2.23 Types of Piling
- 14:18, 14 February 2018 diff hist +152 m 751.1 Preliminary Design →751.1.2.21 Substructure Type
- 14:15, 14 February 2018 diff hist +152 m 751.50 Standard Detailing Notes →G7. Steel HP Pile
- 14:12, 14 February 2018 diff hist 0 m 751.36 Driven Piles →751.36.3 Design Procedure: Per Br, minor corrections
- 14:09, 14 February 2018 diff hist -3 751.36 Driven Piles →751.36.2 Steel Pile
- 13:59, 14 February 2018 diff hist -709 m 153.5 Bridge Per BR, updated info for BR08 and BR10. Deleted archaic BR13.
- 14:38, 13 February 2018 diff hist 0 m 153.13 Highway Safety
- 14:37, 13 February 2018 diff hist +6 m 153.13 Highway Safety
- 14:37, 13 February 2018 diff hist +212 m 153.13 Highway Safety Per TS, provided HS2 Blueprint for Safer Roadways Agreement info so drafters know how the agreement is to be processed.
- 12:07, 13 February 2018 diff hist -2 m Main Page
- 12:06, 13 February 2018 diff hist -7 m 901.16 Construction Inspection Guidelines for Sec 901 Per TS, replaced LED wattage references with A,B and C nomenclature
- 12:03, 13 February 2018 diff hist +67 m 901.13 Lighting Proposed by Other Political Subdivisions on State Highways Per TS, replaced LED wattage references with A,B and C nomenclature
- 11:53, 13 February 2018 diff hist -16 m 901.12 Electrical Components Per TS, replaced LED wattage references with A,B and C nomenclature
- 11:52, 13 February 2018 diff hist -42 m 901.11 Light Emitting Diode (LED) Luminaire Performance and Computation of Roadway Illumination Per TS, replaced LED wattage references with A,B and C nomenclature
- 11:49, 13 February 2018 diff hist -14 m 901.9 Layout Per TS, replaced LED wattage references with A,B and C nomenclature
- 11:48, 13 February 2018 diff hist -49 m 901.7 Light Source and Intensity Per TS, replaced LED wattage references with A,B and C nomenclature
- 19:50, 9 February 2018 diff hist +1,637 Main Page
- 18:51, 9 February 2018 diff hist 0 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.89 Radar Speed Advisory Assembly: Per TS, expanded and updated guidance on the placement of the Radar Speed Advisory Assembly.
- 18:38, 9 February 2018 diff hist -1,209 901.16 Construction Inspection Guidelines for Sec 901 Per TS, provided guidance to allow the use of LED luminaires for roadway lighting.
- 18:36, 9 February 2018 diff hist +32 m 901.15 Glossary
- 18:33, 9 February 2018 diff hist -31 901.15 Glossary Per TS, provided guidance to allow the use of LED luminaires for roadway lighting.
- 18:32, 9 February 2018 diff hist -337 901.14 Dusk-to-Dawn Lighting Policy Per TS, provided guidance to allow the use of LED luminaires for roadway lighting.
- 18:31, 9 February 2018 diff hist +1,814 901.13 Lighting Proposed by Other Political Subdivisions on State Highways Per TS, provided guidance to allow the use of LED luminaires for roadway lighting.
- 18:29, 9 February 2018 diff hist +139 901.12 Electrical Components Per TS, provided guidance to allow the use of LED luminaires for roadway lighting.
- 18:27, 9 February 2018 diff hist -1,929 901.11 Light Emitting Diode (LED) Luminaire Performance and Computation of Roadway Illumination Per TS, provided guidance to allow the use of LED luminaires for roadway lighting.
- 18:26, 9 February 2018 diff hist 0 m 901.11 Light Emitting Diode (LED) Luminaire Performance and Computation of Roadway Illumination 901.11 High Pressure Sodium Luminaire Performance and Computation of Roadway Illumination moved to 901.11 Light Emitting Diode (LED) Luminaire Performance and Computation of Roadway Illumination
- 18:26, 9 February 2018 diff hist +109 N 901.11 High Pressure Sodium Luminaire Performance and Computation of Roadway Illumination 901.11 High Pressure Sodium Luminaire Performance and Computation of Roadway Illumination moved to 901.11 Light Emitting Diode (LED) Luminaire Performance and Computation of Roadway Illumination current
- 18:25, 9 February 2018 diff hist -717 901.9 Layout Per TS, provided guidance to allow the use of LED luminaires for roadway lighting.
- 18:25, 9 February 2018 diff hist 0 m 901.9 Layout 901.9 Luminaires moved to 901.9 Layout
- 18:25, 9 February 2018 diff hist +26 N 901.9 Luminaires 901.9 Luminaires moved to 901.9 Layout current
- 18:24, 9 February 2018 diff hist +429 901.8 System Voltage Per TS, provided guidance to allow the use of LED luminaires for roadway lighting.
- 18:23, 9 February 2018 diff hist 0 m 901.8 System Voltage 901.8 Circuiting moved to 901.8 System Voltage
- 18:23, 9 February 2018 diff hist +34 N 901.8 Circuiting 901.8 Circuiting moved to 901.8 System Voltage current
- 18:22, 9 February 2018 diff hist +127 901.7 Light Source and Intensity Per TS, provided guidance to allow the use of LED luminaires for roadway lighting.
- 18:15, 9 February 2018 diff hist +12 Category:901 Lighting Per TS, provided guidance to allow the use of LED luminaires for roadway lighting.
- 18:11, 9 February 2018 diff hist -5 770.8 Maintenance of Bridge Substructure →770.8.4 Steel Piling and Cast In Place (C.I.P.) Piling: minor clarification current
- 18:01, 9 February 2018 diff hist +69 751.50 Standard Detailing Notes →A2. Concrete Box Culverts and Other Type Structures: Per BR, revision addresses collars on precast concrete box culverts when cast-in-place box culverts are called for on the project.
- 18:00, 9 February 2018 diff hist +1,153 751.8 LRFD Concrete Box Culverts Per BR, revision addresses collars on precast concrete box culverts when cast-in-place box culverts are called for. When/how geotextile fabric is used on precast joints was revised
- 17:48, 9 February 2018 diff hist +26 751.50 Standard Detailing Notes →J1. General: Per BR, revised guidance better defines where drainage/water can or cannot be discharged relative to the location of MSE walls
- 17:47, 9 February 2018 diff hist +6 751.24 LFD Retaining Walls Per BR, revised guidance better defines where drainage/water can or cannot be discharged relative to the location of MSE walls
- 17:32, 9 February 2018 diff hist +147 751.10 General Superstructure →751.10.3 Bridge Deck Drainage - Slab Drains: Per BR, revised guidance better defines where drainage/water can or cannot be discharged relative to the location of MSE walls
- 17:29, 9 February 2018 diff hist +1 751.1 Preliminary Design →751.1.4.3 MSE Walls: Per BR, revised guidance better defines where drainage/water can or cannot be discharged relative to the location of MSE walls
- 17:26, 9 February 2018 diff hist -1 751.1 Preliminary Design →751.1.2.18 Preliminary Cost Estimate: Per BR, revised guidance better defines where drainage/water can or cannot be discharged relative to the location of MSE walls
- 17:09, 9 February 2018 diff hist 0 1047.9 Laboratory Testing Guidelines for Sec 1047
- 17:09, 9 February 2018 diff hist 0 m 1047.9 Laboratory Testing Guidelines for Sec 1047 1047.6 Laboratory Testing Guidelines for Sec 1047 moved to 1047.9 Laboratory Testing Guidelines for Sec 1047
- 17:09, 9 February 2018 diff hist +63 N 1047.6 Laboratory Testing Guidelines for Sec 1047 1047.6 Laboratory Testing Guidelines for Sec 1047 moved to 1047.9 Laboratory Testing Guidelines for Sec 1047 current
- 17:08, 9 February 2018 diff hist 0 m 1047.8 Polyethylene Pipe (HDPE) Pipe Inspection Guide
- 17:07, 9 February 2018 diff hist 0 m 1047.8 Polyethylene Pipe (HDPE) Pipe Inspection Guide 1047.5 Polyethylene Pipe (HDPE) Pipe Inspection Guide moved to 1047.8 Polyethylene Pipe (HDPE) Pipe Inspection Guide
- 17:07, 9 February 2018 diff hist +67 N 1047.5 Polyethylene Pipe (HDPE) Pipe Inspection Guide 1047.5 Polyethylene Pipe (HDPE) Pipe Inspection Guide moved to 1047.8 Polyethylene Pipe (HDPE) Pipe Inspection Guide current
- 17:04, 9 February 2018 diff hist +2 m Category:1047 Corrugated Polyethylene Culvert Pipe
- 17:03, 9 February 2018 diff hist -7,149 Category:1047 Corrugated Polyethylene Culvert Pipe Per BR, guidance clarified and completely rewritten to be in accordance with pipe specifications.
- 17:00, 9 February 2018 diff hist 0 N File:1041.8 corrugated.jpg current
- 17:00, 9 February 2018 diff hist 0 N File:1041.8 steel.jpg current
- 16:57, 9 February 2018 diff hist +7,754 N 1041.8 Polypropylene Pipe (PP) Pipe Inspection Guide New page: This guide will assist in the inspection of all types and configurations of polypropylene (PP) pipe, couplings and fittings. Answer each question and take the action indicated for the answ... current
- 16:54, 9 February 2018 diff hist +2 m Category:1041 Polypropylene Culvert Pipe
- 16:54, 9 February 2018 diff hist +70 Category:1000 MATERIALS new EPG 1041
- 16:53, 9 February 2018 diff hist +11,527 N Category:1041 Polypropylene Culvert Pipe Per BR, guidance clarified and completely rewritten to be in accordance with pipe specifications.
- 16:47, 9 February 2018 diff hist +1,402 Category:1028 Corrugated Polyvinyl Chloride Culvert Pipe Per BR, guidance clarified and completely rewritten to be in accordance with pipe specifications.
- 16:45, 9 February 2018 diff hist +1,568 750.7 Non-Hydraulic Considerations →750.7.2 Types: Per BR, guidance clarified and completely rewritten to be in accordance with pipe specifications.
- 16:43, 9 February 2018 diff hist +3,606 Category:732 Flared End Sections Per BR, guidance clarified and completely rewritten to be in accordance with pipe specifications.
- 16:42, 9 February 2018 diff hist +70 Category:700 STRUCTURES AND HYDRAULICS EPG 730 Thermoplastic Pipe Culverts current
- 16:41, 9 February 2018 diff hist +5,499 N Category:730 Thermoplastic Pipe Culverts Per BR, guidance clarified and completely rewritten to be in accordance with pipe specifications.
- 16:39, 9 February 2018 diff hist -2,362 Category:730 Corrugated Polyethylene Pipe Culverts Per BR, guidance clarified and completely rewritten to be in accordance with pipe specifications. current
- 16:37, 9 February 2018 diff hist -1,411 Category:728 Corrugated Polyvinyl Chloride Culvert Pipe EPG 728 was deleted since there is no longer a Sec 728. current
- 16:36, 9 February 2018 diff hist +7,021 N Category:724 Pipe Culverts Per BR, guidance clarified and completely rewritten to be in accordance with pipe specifications.
- 16:33, 9 February 2018 diff hist +57 Category:700 STRUCTURES AND HYDRAULICS
- 16:26, 9 February 2018 diff hist -554 751.50 Standard Detailing Notes →G. Substructure Notes: Per BR, the revised galvanized pile requirements eliminate steel piling option AASHTO M 270, Gr 36 (ASTM A 709, Gr 36) and replace it with AASHTO M 270, Gr 50 (ASTM A709,
- 16:23, 9 February 2018 diff hist -71 751.50 Standard Detailing Notes →E2. Foundation Data Table: Per BR, the revised galvanized pile requirements eliminate steel piling option AASHTO M 270, Gr 36 (ASTM A 709, Gr 36) and replace it with AASHTO M 270, Gr 50 (ASTM A70
- 16:20, 9 February 2018 diff hist +10 751.36 Driven Piles
- 16:18, 9 February 2018 diff hist +939 751.36 Driven Piles Per BR, the revised galvanized pile requirements eliminate steel piling option AASHTO M 270, Grade 36 (ASTM A 709, Grade 36) and replace it with AASHTO M 270, Grade 50 (ASTM A709, Grade 50).
- 16:14, 9 February 2018 diff hist -28 751.1 Preliminary Design →751.1.2 Bridges/Boxes: Per BR, revised galvanized pile requirements eliminate steel piling option AASHTO M 270, Gr 36 (ASTM A 709, Gr 36) & replace it with AASHTO M 270, Gr 50 (ASTM A709, Gr 50)