User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 11:05, 19 November 2019 diff hist -4 m Category:146 Disadvantaged Business Enterprise (DBE) →146.3.2.3 Commercially Useful Function (CUF): Per CM, the location for storing the CUF documents was updated from the archaic V drive to eProjects.
- 16:12, 14 November 2019 diff hist -282 m Main Page EPG 751.11.2.1
- 16:05, 14 November 2019 diff hist 0 m 751.11 Bearings →751.11.2.1 Elastomeric Bearings
- 16:04, 14 November 2019 diff hist 0 N File:751.11.2.1 taper.jpg current
- 16:03, 14 November 2019 diff hist -59 751.11 Bearings →751.11.2.1 Elastomeric Bearings: Per BR, revised illustrations to clarify the maximum allowed taper
- 14:09, 14 November 2019 diff hist -48 m Main Page New AWP MA Sample Record Acceptance By Certification QRG
- 11:55, 14 November 2019 diff hist +142 m Category:101 Standard Forms →AASHTOWare Project Quick Reference Guides (QRGs): Per CM, new QRG, AWP MA Sampling and Testing Status Report, link
- 16:27, 12 November 2019 diff hist 0 File:751.5 back ns.gif Smithk uploaded a new version of File:751.5 back ns.gif current
- 16:23, 12 November 2019 diff hist 0 File:751.5 back fs.gif Smithk uploaded a new version of File:751.5 back fs.gif current
- 16:20, 12 November 2019 diff hist 0 File:751.5 arrow-side continuous fillet welding.gif Smithk uploaded a new version of File:751.5 arrow-side continuous fillet welding.gif current
- 16:14, 12 November 2019 diff hist 0 File:751.5 90 degree stirrup hook.gif Smithk uploaded a new version of File:751.5 90 degree stirrup hook.gif current
- 16:09, 12 November 2019 diff hist 0 File:751.5 30 45 60 degree bend detail.gif Smithk uploaded a new version of File:751.5 30 45 60 degree bend detail.gif current
- 16:00, 12 November 2019 diff hist 0 File:751.5 135 degree stirrup hook.gif Smithk uploaded a new version of File:751.5 135 degree stirrup hook.gif current
- 15:46, 12 November 2019 diff hist 0 File:751.5 120 135 150 degree bend detail.gif Smithk uploaded a new version of File:751.5 120 135 150 degree bend detail.gif current
- 15:39, 12 November 2019 diff hist 0 File:751.40 Temporary Traffic Control Device Section Thru Roadway.gif Smithk uploaded a new version of File:751.40 Temporary Traffic Control Device Section Thru Roadway.gif current
- 15:28, 12 November 2019 diff hist 0 File:751.40 Substructure Repair.gif Smithk uploaded a new version of File:751.40 Substructure Repair.gif current
- 15:20, 12 November 2019 diff hist 0 File:751.40 Slab Drain Details (Details for Raising Scuppers) Plan of Grate Support and Scupper Extens.gif Smithk uploaded a new version of File:751.40 Slab Drain Details (Details for Raising Scuppers) Plan of Grate Support and Scupper Extens.gif current
- 13:59, 12 November 2019 diff hist 0 m LPA:136.3 Federal Aid Basics →136.3.8.10.3 Project Programming: updated link
- 13:20, 8 November 2019 diff hist +5 m Category:101 Standard Forms Per Env'l, updated Form 806.8.2, Project-Specific SWPPP Information
- 13:19, 8 November 2019 diff hist 0 N File:Form 806.8.2 2019.pdf current
- 13:18, 8 November 2019 diff hist +5 m 806.8 Storm Water Pollution Prevention Plan (SWPPP) Per Env'l, updated Form 806.8.2, Project-Specific SWPPP Information
- 12:26, 8 November 2019 diff hist +37 m Category:101 Standard Forms →Construction and Contractor Related
- 13:29, 6 November 2019 diff hist +9 m Main Page EPG 105.9
- 13:27, 6 November 2019 diff hist +494 m Category:105 Control of Work →105.9.3 Daily Work Reports: Per CM, added guidance for when DWRs in AASHTOWARE may be suspended.
- 11:58, 6 November 2019 diff hist +75 m 751.6 General Quantities →751.6.1 Index of Quantities
- 11:29, 6 November 2019 diff hist +220 m 751.6 General Quantities Per BR, added references to the "Emulsified Asphalt, Seal Coat" pay item and unit weight
- 15:39, 5 November 2019 diff hist +54 m Category:236 Right of Way Per RW, insisted on adding a link of the "Value Determination Schedule" (which is a chart of fees) to the listing of major types of access.
- 12:26, 5 November 2019 diff hist 0 m 237.9 Submission of Plans and Supporting Documents
- 10:01, 5 November 2019 diff hist 0 File:237.9.3 due dates.pdf Smithk uploaded a new version of File:237.9.3 due dates.pdf current
- 11:42, 4 November 2019 diff hist +13 m Help Article →Division Contacts
- 10:22, 1 November 2019 diff hist -13 m 103.1 Bid Opening and Award Process →103.1.6.1.3 Assembling Job Special Provisions
- 10:14, 1 November 2019 diff hist +14 m 103.1 Bid Opening and Award Process
- 10:07, 1 November 2019 diff hist -8 m 237.9 Submission of Plans and Supporting Documents →237.9.3 PS&E Submittal Guidelines
- 09:29, 1 November 2019 diff hist 0 m Help Article →Division Contacts
- 09:27, 1 November 2019 diff hist +47 m Help Article
- 09:24, 1 November 2019 diff hist +63 m Help Article
- 14:42, 31 October 2019 diff hist +57 m 751.11 Bearings →751.11.2.1 Elastomeric Bearings: Per BR, clarified the maximum allowed taper
- 07:45, 31 October 2019 diff hist +16 m Category:153 Agreements and Contracts
- 07:44, 31 October 2019 diff hist +8 m 236.14 Change in Route Status Report
- 07:43, 31 October 2019 diff hist +16 m 236.4 Description Writing and Titles
- 07:42, 31 October 2019 diff hist +4 m 236.4 Description Writing and Titles
- 07:41, 31 October 2019 diff hist -20 m 236.4 Description Writing and Titles updated link
- 07:39, 31 October 2019 diff hist -8 m 236.14 Change in Route Status Report updated link
- 07:38, 31 October 2019 diff hist +84 m Category:153 Agreements and Contracts Updated link
- 13:35, 29 October 2019 diff hist +1 m LPA:136.3 Federal Aid Basics →136.3.8.10.2 Project Eligibility and Selection
- 13:27, 29 October 2019 diff hist -104 m Category:153 Agreements and Contracts
- 13:22, 29 October 2019 diff hist +26 m Category:153 Agreements and Contracts →153.1 The Agreement Process
- 13:20, 29 October 2019 diff hist +26 m Category:153 Agreements and Contracts →153.1.1 Things to Know Before Beginning the Process
- 12:45, 29 October 2019 diff hist 0 m Category:153 Agreements and Contracts →153.1.1 Things to Know Before Beginning the Process
- 08:50, 29 October 2019 diff hist +2 m 606.2 Guard Cable
- 08:47, 29 October 2019 diff hist +1 m 606.2 Guard Cable
- 15:11, 28 October 2019 diff hist +182 Main Page EPG 236
- 14:48, 28 October 2019 diff hist +139 m 236.6 Appraisal and Appraisal Review →236.6.5.9 Non-Competitive Proposals for Contract Realty Appraisals: Per RW, minor clarifications pertaining to current practices
- 14:29, 28 October 2019 diff hist +143 m 236.5 Property Management →236.5.28.3 Compensation for Changes in Access: Per RW, minor clarifications pertaining to current practices
- 11:29, 25 October 2019 diff hist +175 m Main Page EPG 105.9
- 11:11, 25 October 2019 diff hist +38 m Category:146 Disadvantaged Business Enterprise (DBE) →146.3.3 DBE Trucking Companies: Per CM, updated daily diary and daily work reports links
- 11:08, 25 October 2019 diff hist +35 m Category:113 Construction Inspection Guidance for Contractor's Claims Per CM, updated daily diary link
- 11:02, 25 October 2019 diff hist -266 m Category:109 Measurement and Payment Per CM, revisions allow for the expanded opportunities of the AWP.
- 11:01, 25 October 2019 diff hist -462 m Category:108 Prosecution and Progress Per CM, revisions allow for the expanded opportunities of the AWP.
- 10:59, 25 October 2019 diff hist -468 m Category:105 Control of Work →105.9 Authority and Duties of Resident Engineer (Sec 105.9): Per CM, revisions allow for the expanded opportunities of the AWP.
- 10:25, 25 October 2019 diff hist -36 m 910.4 ITS Architecture Per TS, updated links
- 09:56, 25 October 2019 diff hist +128 m Category:105 Control of Work Per CM, updated daily diary and daily work reports links
- 15:11, 24 October 2019 diff hist -2 m 751.22 Prestressed Concrete I Girders Per BR, updated archaic AASHTO Prestressed Girder code references
- 14:26, 24 October 2019 diff hist -176 m 236.16 Outdoor Advertising Per Outdoor Advertising, updated links
- 09:29, 24 October 2019 diff hist +14 m 751.37 Drilled Shafts →751.37.1.6 General Detail Considerations: Per BR, re-titled
- 09:27, 24 October 2019 diff hist +28 m Main Page
- 09:26, 24 October 2019 diff hist +28 m 751.5 Structural Detailing Guidelines
- 09:24, 24 October 2019 diff hist +15 m 751.38 Spread Footings
- 09:22, 24 October 2019 diff hist +15 m 751.5 Structural Detailing Guidelines
- 08:30, 24 October 2019 diff hist +6 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, updated links
- 13:58, 23 October 2019 diff hist +51 m 751.37 Drilled Shafts →751.37.1.6 General Detail Considerations
- 12:28, 23 October 2019 diff hist -409 m Main Page EPG 751.37.1.6
- 12:10, 23 October 2019 diff hist +131 m 751.5 Structural Detailing Guidelines →751.5.3.3 Intermediate Bents: Per BR, updated links
- 12:05, 23 October 2019 diff hist +36 m 751.37 Drilled Shafts →751.37.1.6 General Detail Considerations
- 12:00, 23 October 2019 diff hist 0 N File:751.37.1.6.jpg current
- 11:33, 23 October 2019 diff hist +44 m 751.37 Drilled Shafts →751.37.1.6 General Detail Considerations
- 11:27, 23 October 2019 diff hist +972 m 751.37 Drilled Shafts →751.37.1.6 General Detail Considerations: Per BR, drilled shaft standard drawing information clarified and transferred to EPG 751.37.1.6; voided standard drawing DSS_01_drilled_shaft.
- 10:11, 23 October 2019 diff hist -3 m LPA:136.12 Figures, Glossary and Other Useful Links Figs. 136.4.7 and 136.4.11
- 10:11, 23 October 2019 diff hist 0 N File:136.4.11 2019.docx current
- 10:10, 23 October 2019 diff hist 0 N File:136.4.7 2019.docx current
- 10:10, 23 October 2019 diff hist -14 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, minor updates to Figs. 136.4.7 and 136.4.11
- 15:03, 22 October 2019 diff hist 0 N File:616.2.1 Road Closed Beyond april 2011a.pdf current
- 15:02, 22 October 2019 diff hist +1 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F)
- 14:59, 22 October 2019 diff hist 0 File:616.2.1 Road Closed Beyond april 2011.pdf Smithk uploaded a new version of File:616.2.1 Road Closed Beyond april 2011.pdf current
- 12:12, 22 October 2019 diff hist 0 N File:616.13.2 Directions July 2016a.docx current
- 12:12, 22 October 2019 diff hist +1 m 616.13 Work Zone Capacity, Queue and Travel Delay
- 12:07, 22 October 2019 diff hist 0 File:616.13.2 Directions July 2016.docx Smithk uploaded a new version of File:616.13.2 Directions July 2016.docx current
- 10:43, 22 October 2019 diff hist -8 m Category:Safe and Sound Per Bidding and Estimates, updated the PS&E Due Date Chart
- 10:40, 22 October 2019 diff hist -16 m 103.1 Bid Opening and Award Process Per Bidding and Estimates, updated the PS&E Due Date Chart
- 10:39, 22 October 2019 diff hist +57 m 237.6 Project Estimates →237.6.3 PS&E: Per Bidding and Estimates, updated the PS&E Due Date Chart
- 10:38, 22 October 2019 diff hist -8 m 237.9 Submission of Plans and Supporting Documents →237.9.3 PS&E Submittal Guidelines: Per Bidding and Estimates, updated the PS&E Due Date Chart
- 13:07, 21 October 2019 diff hist +38 m Main Page
- 13:07, 21 October 2019 diff hist +54 m 121.7 Program Estimates
- 13:01, 21 October 2019 diff hist +165 m Main Page EPG 121.7
- 13:00, 21 October 2019 diff hist +415 121.7 Program Estimates Per Bidding & Estimate, district estimate documentation must address the total project cost and include estimated costs for PE, CE, Constr'n, RW, Utilities, Bridge. Program estimate documentation & supporting documents to be stored in e-Projects
- 12:37, 21 October 2019 diff hist -151 m Main Page EPG 104.7 and EPG 121.7
- 12:31, 21 October 2019 diff hist +534 121.7 Program Estimates Per Bidding and Estimates, estimating guidance updated to add optional spreadsheet to assist the districts with their scoping and estimating processes. The Resurfacing Per Mile Scoping Form was made available.
- 11:29, 21 October 2019 diff hist 0 N File:104.7 Resurfacing.xlsx current
- 11:28, 21 October 2019 diff hist 0 N File:121.7 Project Scoping Form.xlsx current
- 11:25, 21 October 2019 diff hist +1,502 104.7 Scoping Estimates Per Bidding and Estimates, estimating guidance updated to add optional spreadsheets to assist the districts with scoping and estimating processes. The Resurfacing Per Mile Scoping Form and the Project Scoping Form were made available.