User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 16:08, 2 December 2019 diff hist +379 m Main Page EPG 751
- 15:26, 2 December 2019 diff hist 0 N File:751.35.4.4.jpg current
- 15:25, 2 December 2019 diff hist 0 N File:751.35.4.3.2.jpg current
- 15:25, 2 December 2019 diff hist 0 N File:751.35.4.3.1.jpg current
- 15:25, 2 December 2019 diff hist 0 N File:751.35.4.2.4.jpg current
- 15:24, 2 December 2019 diff hist 0 N File:751.35.4.2.3.jpg current
- 15:24, 2 December 2019 diff hist 0 N File:751.35.4.2.2.jpg current
- 15:24, 2 December 2019 diff hist 0 N File:751.35.4.2.1.jpg current
- 15:23, 2 December 2019 diff hist 0 N File:751.35.4.1.3.jpg current
- 15:22, 2 December 2019 diff hist 0 N File:751.35.4.1 V1 hook.jpg current
- 15:22, 2 December 2019 diff hist 0 N File:751.35.4.1 U1 hook.jpg current
- 15:22, 2 December 2019 diff hist 0 N File:751.35.4.1 U4 hook.jpg current
- 15:21, 2 December 2019 diff hist 0 N File:751.35.4.1.2.jpg current
- 15:20, 2 December 2019 diff hist 0 N File:751.35.4.1.1.jpg current
- 15:20, 2 December 2019 diff hist 0 N File:751.35.3.4.3.jpg current
- 15:19, 2 December 2019 diff hist 0 N File:751.35.3.4.2.jpg current
- 15:19, 2 December 2019 diff hist 0 N File:751.35.3.4.1.jpg current
- 15:18, 2 December 2019 diff hist 0 N File:751.35.3.3.4.jpg current
- 15:18, 2 December 2019 diff hist 0 N File:751.35.3.3.3.jpg current
- 15:17, 2 December 2019 diff hist 0 N File:751.35.3.3.2.jpg current
- 15:17, 2 December 2019 diff hist 0 N File:751.35.3.3.1.jpg current
- 15:17, 2 December 2019 diff hist -900 m 751.35 Concrete Pile Cap Integral End Bents Per BR, added alternate end bent reinforcement details for shallow structures
- 13:12, 2 December 2019 diff hist -17 m LPA:136.6 Environmental and Cultural Requirements Per Env'l, updated link to State of Missouri 401 Water Quality Certification
- 11:54, 2 December 2019 diff hist -17 m Help Article →Division Contacts
- 10:09, 2 December 2019 diff hist 0 m 751.32 Concrete Pile Cap Intermediate Bents →751.32.4.1 Typical Pile Cap Bent
- 10:01, 2 December 2019 diff hist 0 N File:751.32.4.1 longitudinal.jpg current
- 10:00, 2 December 2019 diff hist 0 N File:751.32.4.1.3.jpg current
- 09:59, 2 December 2019 diff hist +2 m 751.32 Concrete Pile Cap Intermediate Bents →751.32.4.1 Typical Pile Cap Bent
- 09:55, 2 December 2019 diff hist 0 N File:751.32.4.1 part.jpg current
- 09:55, 2 December 2019 diff hist -818 m 751.32 Concrete Pile Cap Intermediate Bents →751.32.4.1 Typical Pile Cap Bent: Per BR, updated reinforcement details to be in accordance with new epoxy coated guidelines and with new development and splice length requirements.
- 08:58, 2 December 2019 diff hist 0 N File:751.31.3.5.6.jpg current
- 08:54, 2 December 2019 diff hist -611 m 751.31 Open Concrete Intermediate Bents →751.31.3.6 Collision Wall
- 08:50, 2 December 2019 diff hist 0 m 751.31 Open Concrete Intermediate Bents →751.31.3.5 Hammer Head Type
- 08:46, 2 December 2019 diff hist 0 N File:751.31.3.5.4.jpg current
- 08:45, 2 December 2019 diff hist 0 m 751.31 Open Concrete Intermediate Bents →751.31.3.5 Hammer Head Type
- 08:43, 2 December 2019 diff hist 0 N File:751.31.3.5.3.jpg current
- 08:42, 2 December 2019 diff hist 0 N File:751.31.3.5.2.jpg current
- 08:41, 2 December 2019 diff hist 0 N File:751.31.3.5.1.jpg current
- 08:38, 2 December 2019 diff hist +3 m 751.31 Open Concrete Intermediate Bents →751.31.3 Reinforcement
- 08:35, 2 December 2019 diff hist -4 m 751.31 Open Concrete Intermediate Bents →751.31.3.4 Tie Beam
- 16:27, 27 November 2019 diff hist +4 751.31 Open Concrete Intermediate Bents →751.31.3 Reinforcement
- 16:24, 27 November 2019 diff hist 0 N File:751.31.3.4.2.jpg current
- 16:24, 27 November 2019 diff hist 0 N File:751.31.3.4.1.jpg current
- 16:22, 27 November 2019 diff hist -2 751.31 Open Concrete Intermediate Bents →751.31.3.4 Tie Beam
- 16:21, 27 November 2019 diff hist -8 751.31 Open Concrete Intermediate Bents →751.31.3.4 Tie Beam
- 16:18, 27 November 2019 diff hist -1,625 m 751.31 Open Concrete Intermediate Bents →751.31.3 Reinforcement
- 16:05, 27 November 2019 diff hist 0 N File:751.31.3.3.2.jpg current
- 16:04, 27 November 2019 diff hist 0 N File:751.31.3.3.1.jpg current
- 16:03, 27 November 2019 diff hist -273 m 751.31 Open Concrete Intermediate Bents →751.31.3 Reinforcement
- 15:43, 27 November 2019 diff hist 0 N File:751.31.3.2.3 part elev.jpg current
- 15:43, 27 November 2019 diff hist +184 m 751.31 Open Concrete Intermediate Bents →751.31.3.2 Column
- 15:29, 27 November 2019 diff hist +45 m 751.31 Open Concrete Intermediate Bents →751.31.3.2 Column
- 15:24, 27 November 2019 diff hist +35 m 751.9 LFD Seismic →751.9.3.1.7 T- Joint Connections
- 15:17, 27 November 2019 diff hist 0 N File:751.31.1.3.2.2.jpg current
- 15:14, 27 November 2019 diff hist 0 N File:751.31.1.3.2.1.jpg current
- 15:02, 27 November 2019 diff hist 0 N File:751.31.1.3.1.3.jpg current
- 15:00, 27 November 2019 diff hist 0 N File:751.31.1.3.1.2.jpg current
- 14:59, 27 November 2019 diff hist 0 N File:751.31.1.3.1.1.jpg current
- 14:58, 27 November 2019 diff hist 0 N File:751.31.1.7.3.jpg current
- 14:57, 27 November 2019 diff hist +2 m 751.31 Open Concrete Intermediate Bents →751.31.1.7 Collision Walls
- 14:54, 27 November 2019 diff hist 0 N File:751.31.1.7.2.jpg current
- 14:53, 27 November 2019 diff hist 0 N File:751.31.1.7.1.jpg current
- 14:52, 27 November 2019 diff hist 0 N File:751.31.1.6.jpg current
- 14:51, 27 November 2019 diff hist 0 N File:751.31.1.5.jpg current
- 14:50, 27 November 2019 diff hist 0 N File:751.31.1.4.jpg current
- 14:49, 27 November 2019 diff hist 0 N File:751.31.1.3 2019.jpg current
- 14:47, 27 November 2019 diff hist +4 751.31 Open Concrete Intermediate Bents →751.31.1.3 Web Beam – Web Supporting Beam
- 14:45, 27 November 2019 diff hist 0 N File:751.31.1.3a.jpg current
- 14:42, 27 November 2019 diff hist +1 m 751.31 Open Concrete Intermediate Bents →751.31.1.3 Web Beam – Web Supporting Beam
- 14:40, 27 November 2019 diff hist 0 N File:751.31.1.3.jpg current
- 14:39, 27 November 2019 diff hist 0 N File:751.31.1.2.jpg current
- 14:38, 27 November 2019 diff hist +14 m 751.31 Open Concrete Intermediate Bents →751.31.3.2 Column
- 14:32, 27 November 2019 diff hist -2,607 m 751.31 Open Concrete Intermediate Bents Per BR, updated reinforcement details to be in accordance with new epoxy coated guidelines and with new development and splice length requirements.
- 11:33, 27 November 2019 diff hist 0 N File:751.12.2.9 section 2019.jpg current
- 11:33, 27 November 2019 diff hist 0 N File:751.12.2.9 part 2019.jpg current
- 11:32, 27 November 2019 diff hist +9 m 751.12 Barriers, Railings, Curbs and Fences →751.12.2.9 Details of Mounting Light Poles on Safety Barrier Curbs
- 11:22, 27 November 2019 diff hist +2 m 751.9 LFD Seismic →751.9.3.1.7 T- Joint Connections
- 11:19, 27 November 2019 diff hist 0 N File:751.9.3.1.7.6 2019.jpg current
- 11:19, 27 November 2019 diff hist 0 N File:751.9.3.1.7.5 2019.jpg current
- 11:17, 27 November 2019 diff hist 0 N File:751.9.3.1.7.4 2019.jpg current
- 11:16, 27 November 2019 diff hist +1,004 751.9 LFD Seismic →751.9.3.1.7 T- Joint Connections: Per BR, updated reinforcement details to be in accordance with new epoxy coated guidelines and with new development and splice length requirements.
- 10:22, 27 November 2019 diff hist +712 m 751.50 Standard Detailing Notes Per BR, updated reinforcement details to be in accordance with new epoxy coated guidelines and with new development and splice length requirements.
- 09:52, 27 November 2019 diff hist 0 N File:751.5.1.6 Typical 2019.pdf
- 09:51, 27 November 2019 diff hist +10 m 751.5 Structural Detailing Guidelines Per BR, updated reinforcement details to be in accordance with new epoxy coated guidelines and with new development and splice length requirements. Updated Example Plans
- 12:24, 26 November 2019 diff hist 0 N File:Main Page Welcome.jpg current
- 12:24, 26 November 2019 diff hist 0 N File:Main Page Mission.jpg current
- 08:40, 25 November 2019 diff hist 0 N File:236.16.2 2019 map.jpg current
- 08:40, 25 November 2019 diff hist +5 m 236.16 Outdoor Advertising →236.16.2 Organization & Personnel
- 08:39, 25 November 2019 diff hist 0 m 236.16 Outdoor Advertising →236.16.2 Organization & Personnel
- 12:18, 22 November 2019 diff hist +4 m Category:101 Standard Forms Per Env'l, updated Form 806.8.2 due to technical function problems
- 12:17, 22 November 2019 diff hist 0 N File:Form 806.8.2 nov 2019.pdf current
- 12:17, 22 November 2019 diff hist +4 m 806.8 Storm Water Pollution Prevention Plan (SWPPP) Per Env'l, updated Form 806.8.2 due to technical function problems
- 09:40, 22 November 2019 diff hist -22,332 m Historic Preservation Per Env'l, deleted entire archaic article current
- 09:37, 22 November 2019 diff hist -504 m Category:Good Stewards of Missouri's Natural and Cultural Rescources removed link to archaic Historic Preservation article current
- 09:34, 22 November 2019 diff hist -26 m Category:127 MoDOT and the Environment removed link to archaic Historic Preservation article
- 14:50, 21 November 2019 diff hist +19 m 751.50 Standard Detailing Notes
- 14:33, 21 November 2019 diff hist -63 m Main Page EPG 751.50
- 14:29, 21 November 2019 diff hist -12 m 751.50 Standard Detailing Notes Per BR, clarified previous revision about underlined portions of notes
- 13:37, 21 November 2019 diff hist +58 m 751.50 Standard Detailing Notes Per BR, added guidance about underlined portions of notes, and slightly revised Notes H6.6 and K1.11
- 11:23, 19 November 2019 diff hist -49 Main Page EPG 146
- 11:05, 19 November 2019 diff hist -4 m Category:146 Disadvantaged Business Enterprise (DBE) →146.3.2.3 Commercially Useful Function (CUF): Per CM, the location for storing the CUF documents was updated from the archaic V drive to eProjects.
- 16:12, 14 November 2019 diff hist -282 m Main Page EPG 751.11.2.1
- 16:05, 14 November 2019 diff hist 0 m 751.11 Bearings →751.11.2.1 Elastomeric Bearings
- 16:04, 14 November 2019 diff hist 0 N File:751.11.2.1 taper.jpg current
- 16:03, 14 November 2019 diff hist -59 751.11 Bearings →751.11.2.1 Elastomeric Bearings: Per BR, revised illustrations to clarify the maximum allowed taper
- 14:09, 14 November 2019 diff hist -48 m Main Page New AWP MA Sample Record Acceptance By Certification QRG
- 11:55, 14 November 2019 diff hist +142 m Category:101 Standard Forms →AASHTOWare Project Quick Reference Guides (QRGs): Per CM, new QRG, AWP MA Sampling and Testing Status Report, link
- 16:27, 12 November 2019 diff hist 0 File:751.5 back ns.gif Smithk uploaded a new version of File:751.5 back ns.gif current
- 16:23, 12 November 2019 diff hist 0 File:751.5 back fs.gif Smithk uploaded a new version of File:751.5 back fs.gif current
- 16:20, 12 November 2019 diff hist 0 File:751.5 arrow-side continuous fillet welding.gif Smithk uploaded a new version of File:751.5 arrow-side continuous fillet welding.gif current
- 16:14, 12 November 2019 diff hist 0 File:751.5 90 degree stirrup hook.gif Smithk uploaded a new version of File:751.5 90 degree stirrup hook.gif current
- 16:09, 12 November 2019 diff hist 0 File:751.5 30 45 60 degree bend detail.gif Smithk uploaded a new version of File:751.5 30 45 60 degree bend detail.gif current
- 16:00, 12 November 2019 diff hist 0 File:751.5 135 degree stirrup hook.gif Smithk uploaded a new version of File:751.5 135 degree stirrup hook.gif current
- 15:46, 12 November 2019 diff hist 0 File:751.5 120 135 150 degree bend detail.gif Smithk uploaded a new version of File:751.5 120 135 150 degree bend detail.gif current
- 15:39, 12 November 2019 diff hist 0 File:751.40 Temporary Traffic Control Device Section Thru Roadway.gif Smithk uploaded a new version of File:751.40 Temporary Traffic Control Device Section Thru Roadway.gif current
- 15:28, 12 November 2019 diff hist 0 File:751.40 Substructure Repair.gif Smithk uploaded a new version of File:751.40 Substructure Repair.gif current
- 15:20, 12 November 2019 diff hist 0 File:751.40 Slab Drain Details (Details for Raising Scuppers) Plan of Grate Support and Scupper Extens.gif Smithk uploaded a new version of File:751.40 Slab Drain Details (Details for Raising Scuppers) Plan of Grate Support and Scupper Extens.gif current
- 13:59, 12 November 2019 diff hist 0 m LPA:136.3 Federal Aid Basics →136.3.8.10.3 Project Programming: updated link
- 13:20, 8 November 2019 diff hist +5 m Category:101 Standard Forms Per Env'l, updated Form 806.8.2, Project-Specific SWPPP Information
- 13:19, 8 November 2019 diff hist 0 N File:Form 806.8.2 2019.pdf current
- 13:18, 8 November 2019 diff hist +5 m 806.8 Storm Water Pollution Prevention Plan (SWPPP) Per Env'l, updated Form 806.8.2, Project-Specific SWPPP Information
- 12:26, 8 November 2019 diff hist +37 m Category:101 Standard Forms →Construction and Contractor Related
- 13:29, 6 November 2019 diff hist +9 m Main Page EPG 105.9
- 13:27, 6 November 2019 diff hist +494 m Category:105 Control of Work →105.9.3 Daily Work Reports: Per CM, added guidance for when DWRs in AASHTOWARE may be suspended.
- 11:58, 6 November 2019 diff hist +75 m 751.6 General Quantities →751.6.1 Index of Quantities
- 11:29, 6 November 2019 diff hist +220 m 751.6 General Quantities Per BR, added references to the "Emulsified Asphalt, Seal Coat" pay item and unit weight
- 15:39, 5 November 2019 diff hist +54 m Category:236 Right of Way Per RW, insisted on adding a link of the "Value Determination Schedule" (which is a chart of fees) to the listing of major types of access.
- 12:26, 5 November 2019 diff hist 0 m 237.9 Submission of Plans and Supporting Documents
- 10:01, 5 November 2019 diff hist 0 File:237.9.3 due dates.pdf Smithk uploaded a new version of File:237.9.3 due dates.pdf current
- 11:42, 4 November 2019 diff hist +13 m Help Article →Division Contacts
- 10:22, 1 November 2019 diff hist -13 m 103.1 Bid Opening and Award Process →103.1.6.1.3 Assembling Job Special Provisions
- 10:14, 1 November 2019 diff hist +14 m 103.1 Bid Opening and Award Process
- 10:07, 1 November 2019 diff hist -8 m 237.9 Submission of Plans and Supporting Documents →237.9.3 PS&E Submittal Guidelines
- 09:29, 1 November 2019 diff hist 0 m Help Article →Division Contacts
- 09:27, 1 November 2019 diff hist +47 m Help Article
- 09:24, 1 November 2019 diff hist +63 m Help Article
- 14:42, 31 October 2019 diff hist +57 m 751.11 Bearings →751.11.2.1 Elastomeric Bearings: Per BR, clarified the maximum allowed taper
- 07:45, 31 October 2019 diff hist +16 m Category:153 Agreements and Contracts
- 07:44, 31 October 2019 diff hist +8 m 236.14 Change in Route Status Report
- 07:43, 31 October 2019 diff hist +16 m 236.4 Description Writing and Titles
- 07:42, 31 October 2019 diff hist +4 m 236.4 Description Writing and Titles
- 07:41, 31 October 2019 diff hist -20 m 236.4 Description Writing and Titles updated link
- 07:39, 31 October 2019 diff hist -8 m 236.14 Change in Route Status Report updated link
- 07:38, 31 October 2019 diff hist +84 m Category:153 Agreements and Contracts Updated link
- 13:35, 29 October 2019 diff hist +1 m LPA:136.3 Federal Aid Basics →136.3.8.10.2 Project Eligibility and Selection
- 13:27, 29 October 2019 diff hist -104 m Category:153 Agreements and Contracts
- 13:22, 29 October 2019 diff hist +26 m Category:153 Agreements and Contracts →153.1 The Agreement Process
- 13:20, 29 October 2019 diff hist +26 m Category:153 Agreements and Contracts →153.1.1 Things to Know Before Beginning the Process
- 12:45, 29 October 2019 diff hist 0 m Category:153 Agreements and Contracts →153.1.1 Things to Know Before Beginning the Process
- 08:50, 29 October 2019 diff hist +2 m 606.2 Guard Cable
- 08:47, 29 October 2019 diff hist +1 m 606.2 Guard Cable
- 15:11, 28 October 2019 diff hist +182 Main Page EPG 236
- 14:48, 28 October 2019 diff hist +139 m 236.6 Appraisal and Appraisal Review →236.6.5.9 Non-Competitive Proposals for Contract Realty Appraisals: Per RW, minor clarifications pertaining to current practices
- 14:29, 28 October 2019 diff hist +143 m 236.5 Property Management →236.5.28.3 Compensation for Changes in Access: Per RW, minor clarifications pertaining to current practices
- 11:29, 25 October 2019 diff hist +175 m Main Page EPG 105.9
- 11:11, 25 October 2019 diff hist +38 m Category:146 Disadvantaged Business Enterprise (DBE) →146.3.3 DBE Trucking Companies: Per CM, updated daily diary and daily work reports links
- 11:08, 25 October 2019 diff hist +35 m Category:113 Construction Inspection Guidance for Contractor's Claims Per CM, updated daily diary link
- 11:02, 25 October 2019 diff hist -266 m Category:109 Measurement and Payment Per CM, revisions allow for the expanded opportunities of the AWP.
- 11:01, 25 October 2019 diff hist -462 m Category:108 Prosecution and Progress Per CM, revisions allow for the expanded opportunities of the AWP.
- 10:59, 25 October 2019 diff hist -468 m Category:105 Control of Work →105.9 Authority and Duties of Resident Engineer (Sec 105.9): Per CM, revisions allow for the expanded opportunities of the AWP.
- 10:25, 25 October 2019 diff hist -36 m 910.4 ITS Architecture Per TS, updated links
- 09:56, 25 October 2019 diff hist +128 m Category:105 Control of Work Per CM, updated daily diary and daily work reports links
- 15:11, 24 October 2019 diff hist -2 m 751.22 Prestressed Concrete I Girders Per BR, updated archaic AASHTO Prestressed Girder code references
- 14:26, 24 October 2019 diff hist -176 m 236.16 Outdoor Advertising Per Outdoor Advertising, updated links
- 09:29, 24 October 2019 diff hist +14 m 751.37 Drilled Shafts →751.37.1.6 General Detail Considerations: Per BR, re-titled
- 09:27, 24 October 2019 diff hist +28 m Main Page
- 09:26, 24 October 2019 diff hist +28 m 751.5 Structural Detailing Guidelines
- 09:24, 24 October 2019 diff hist +15 m 751.38 Spread Footings
- 09:22, 24 October 2019 diff hist +15 m 751.5 Structural Detailing Guidelines
- 08:30, 24 October 2019 diff hist +6 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, updated links
- 13:58, 23 October 2019 diff hist +51 m 751.37 Drilled Shafts →751.37.1.6 General Detail Considerations
- 12:28, 23 October 2019 diff hist -409 m Main Page EPG 751.37.1.6
- 12:10, 23 October 2019 diff hist +131 m 751.5 Structural Detailing Guidelines →751.5.3.3 Intermediate Bents: Per BR, updated links
- 12:05, 23 October 2019 diff hist +36 m 751.37 Drilled Shafts →751.37.1.6 General Detail Considerations
- 12:00, 23 October 2019 diff hist 0 N File:751.37.1.6.jpg current
- 11:33, 23 October 2019 diff hist +44 m 751.37 Drilled Shafts →751.37.1.6 General Detail Considerations
- 11:27, 23 October 2019 diff hist +972 m 751.37 Drilled Shafts →751.37.1.6 General Detail Considerations: Per BR, drilled shaft standard drawing information clarified and transferred to EPG 751.37.1.6; voided standard drawing DSS_01_drilled_shaft.
- 10:11, 23 October 2019 diff hist -3 m LPA:136.12 Figures, Glossary and Other Useful Links Figs. 136.4.7 and 136.4.11
- 10:11, 23 October 2019 diff hist 0 N File:136.4.11 2019.docx current
- 10:10, 23 October 2019 diff hist 0 N File:136.4.7 2019.docx current
- 10:10, 23 October 2019 diff hist -14 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, minor updates to Figs. 136.4.7 and 136.4.11
- 15:03, 22 October 2019 diff hist 0 N File:616.2.1 Road Closed Beyond april 2011a.pdf current
- 15:02, 22 October 2019 diff hist +1 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F)
- 14:59, 22 October 2019 diff hist 0 File:616.2.1 Road Closed Beyond april 2011.pdf Smithk uploaded a new version of File:616.2.1 Road Closed Beyond april 2011.pdf current
- 12:12, 22 October 2019 diff hist 0 N File:616.13.2 Directions July 2016a.docx current
- 12:12, 22 October 2019 diff hist +1 m 616.13 Work Zone Capacity, Queue and Travel Delay
- 12:07, 22 October 2019 diff hist 0 File:616.13.2 Directions July 2016.docx Smithk uploaded a new version of File:616.13.2 Directions July 2016.docx current
- 10:43, 22 October 2019 diff hist -8 m Category:Safe and Sound Per Bidding and Estimates, updated the PS&E Due Date Chart
- 10:40, 22 October 2019 diff hist -16 m 103.1 Bid Opening and Award Process Per Bidding and Estimates, updated the PS&E Due Date Chart
- 10:39, 22 October 2019 diff hist +57 m 237.6 Project Estimates →237.6.3 PS&E: Per Bidding and Estimates, updated the PS&E Due Date Chart
- 10:38, 22 October 2019 diff hist -8 m 237.9 Submission of Plans and Supporting Documents →237.9.3 PS&E Submittal Guidelines: Per Bidding and Estimates, updated the PS&E Due Date Chart
- 13:07, 21 October 2019 diff hist +38 m Main Page
- 13:07, 21 October 2019 diff hist +54 m 121.7 Program Estimates
- 13:01, 21 October 2019 diff hist +165 m Main Page EPG 121.7
- 13:00, 21 October 2019 diff hist +415 121.7 Program Estimates Per Bidding & Estimate, district estimate documentation must address the total project cost and include estimated costs for PE, CE, Constr'n, RW, Utilities, Bridge. Program estimate documentation & supporting documents to be stored in e-Projects
- 12:37, 21 October 2019 diff hist -151 m Main Page EPG 104.7 and EPG 121.7
- 12:31, 21 October 2019 diff hist +534 121.7 Program Estimates Per Bidding and Estimates, estimating guidance updated to add optional spreadsheet to assist the districts with their scoping and estimating processes. The Resurfacing Per Mile Scoping Form was made available.
- 11:29, 21 October 2019 diff hist 0 N File:104.7 Resurfacing.xlsx current
- 11:28, 21 October 2019 diff hist 0 N File:121.7 Project Scoping Form.xlsx current
- 11:25, 21 October 2019 diff hist +1,502 104.7 Scoping Estimates Per Bidding and Estimates, estimating guidance updated to add optional spreadsheets to assist the districts with scoping and estimating processes. The Resurfacing Per Mile Scoping Form and the Project Scoping Form were made available.
- 09:07, 21 October 2019 diff hist +517 m Main Page EPG 616.8
- 08:59, 21 October 2019 diff hist 0 File:616.8.10e MT.pdf Smithk uploaded a new version of File:616.8.10e MT.pdf current
- 08:58, 21 October 2019 diff hist 0 File:616.8.10d MT.pdf Smithk uploaded a new version of File:616.8.10d MT.pdf current
- 13:19, 18 October 2019 diff hist -4 m 171.12 Maintenance Policy History
- 12:49, 18 October 2019 diff hist +53 m 171.12 Maintenance Policy History
- 12:44, 18 October 2019 diff hist -383 m 171.12 Maintenance Policy History Per MT, removed the archaic RDS(B2) (Deer Death Report)
- 12:44, 18 October 2019 diff hist -260 m 171.6 Roadsides Per MT, removed the archaic RDS(B2) (Deer Death Report)
- 12:42, 18 October 2019 diff hist -84 m Category:171 Maintenance Policy and Operations Per MT, removed the archaic RDS(B2) (Deer Death Report)
- 12:21, 18 October 2019 diff hist 0 N File:949.2 speed limits.pdf current
- 12:20, 18 October 2019 diff hist +2 m 949.2 Speed Limit Guidelines Per TS, updated Traffic pamphlet on speed limits
- 13:16, 17 October 2019 diff hist 0 m Category:618 Mobilization →Additional Mobilization for Seeding current
- 13:15, 17 October 2019 diff hist -12 m Category:618 Mobilization →Additional Mobilization for Seeding
- 13:14, 17 October 2019 diff hist +386 m 806.1 Erosion Control Measures Per Bidding, guidance for all jobs that contain the Additional Mobilization for Seeding pay item is now available
- 13:03, 17 October 2019 diff hist +223 m Main Page EPG 618
- 13:00, 17 October 2019 diff hist +494 m Category:618 Mobilization Per Bidding, guidance for all jobs that contain the Additional Mobilization for Seeding pay item is now available
- 10:23, 16 October 2019 diff hist -4 m 903.18 Signing for School Areas →903.19.9 School Zone Sign (S1-1) and Plaques (S4-3P) and END SCHOOL ZONE Sign (S5-2) (MUTCD Section 7B.09): Per TS, minor correction
- 14:23, 15 October 2019 diff hist +33 m 141.2 Missouri Transportation Finance Corporation (MTFC) Loans
- 14:17, 15 October 2019 diff hist +18 m Category:948 Incident Response Plan and Emergency Response Management
- 13:17, 15 October 2019 diff hist +9 m Category:945 Overdimension / Overweight Permits current
- 13:15, 15 October 2019 diff hist -21 m Category:945 Overdimension / Overweight Permits
- 13:12, 15 October 2019 diff hist -23 m Category:945 Overdimension / Overweight Permits
- 13:11, 15 October 2019 diff hist -28 m Category:945 Overdimension / Overweight Permits
- 13:10, 15 October 2019 diff hist -9 m Category:945 Overdimension / Overweight Permits
- 10:43, 3 October 2019 diff hist +136 m 236.7 Negotiation Per RW, added Title VI Survey to listing of forms
- 08:55, 2 October 2019 diff hist +6 m Main Page EPG 505
- 08:44, 2 October 2019 diff hist +380 m Category:505 Bridge Deck Concrete Wearing Surface Per CM, added video for PPC
- 07:09, 2 October 2019 diff hist -30 m 236.2 Right of Way Organization and Personnel →236.2.2 Organization of the Right of Way Section
- 07:08, 2 October 2019 diff hist +32 m 236.2 Right of Way Organization and Personnel →236.2.2 Organization of the Right of Way Section
- 07:07, 2 October 2019 diff hist 0 N File:236.2.2 orgchart.pdf current
- 07:06, 2 October 2019 diff hist 0 m 236.2 Right of Way Organization and Personnel →236.2.2 Organization of the Right of Way Section
- 07:05, 2 October 2019 diff hist -11 m 236.2 Right of Way Organization and Personnel Per RW, updated links
- 07:54, 1 October 2019 diff hist +76 m LPA:136.12 Figures, Glossary and Other Useful Links Form 136.8.8
- 07:53, 1 October 2019 diff hist +152 m LPA:136.8 Local Public Agency Land Acquisition updated link for Form 136.8.8
- 12:19, 30 September 2019 diff hist +572 m Category:505 Bridge Deck Concrete Wearing Surface →505.1.3 Silica Fume Concrete (for Sec 505.30): Per CM, new guidance for Polyester Polymer Concrete Overlay
- 09:08, 30 September 2019 diff hist 0 m Help Article →EPG Ballot Cycles
- 14:39, 27 September 2019 diff hist +42 m Category:129 Public Involvement updated Design links
- 13:02, 27 September 2019 diff hist 0 N File:136.8.8a.docx current
- 13:02, 27 September 2019 diff hist +135 m LPA:136.8 Local Public Agency Land Acquisition Per RW, Form 136.8.8 was updated to detail parcel acquisition and responsibility as well as expenditure detail. New Form 136.8.8a is a simple chart to compute these required details for Form 136.8.8.
- 12:48, 27 September 2019 diff hist +134 m LPA:136.12 Figures, Glossary and Other Useful Links Per RW, updated Form 136.8.8; new Form 136.8.8a
- 12:46, 27 September 2019 diff hist 0 N File:136.8.8 2019.docx current
- 12:45, 27 September 2019 diff hist +5 m LPA:136.12 Figures, Glossary and Other Useful Links
- 09:49, 26 September 2019 diff hist +90 m Main Page EPG 109.12.5
- 09:19, 26 September 2019 diff hist +1,544 m Category:109 Measurement and Payment →109.12.5 Change Order Time Extension for Extreme Events: Per CM, new guidance allows the State CM Engineer the latitude to grant time extensions for extreme events. This guidance reflects what CM has long been doing in these circumstances.
- 14:29, 25 September 2019 diff hist 0 File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 4) Post Stiffener.gif Smithk uploaded a new version of File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 4) Post Stiffener.gif current
- 14:27, 25 September 2019 diff hist 0 File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 4) Post Plate Washer.gif Smithk uploaded a new version of File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 4) Post Plate Washer.gif current
- 14:25, 25 September 2019 diff hist 0 File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 4) Plan of Bent Plate.gif Smithk uploaded a new version of File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 4) Plan of Bent Plate.gif current
- 14:22, 25 September 2019 diff hist 0 File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 4) Part Section.gif Smithk uploaded a new version of File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 4) Part Section.gif current
- 14:20, 25 September 2019 diff hist 0 File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 4) Part Section Thru Plate.gif Smithk uploaded a new version of File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 4) Part Section Thru Plate.gif current
- 14:18, 25 September 2019 diff hist 0 File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 4) Optional Tie Connection.gif Smithk uploaded a new version of File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 4) Optional Tie Connection.gif current
- 14:15, 25 September 2019 diff hist 0 File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 4) Details of Post.gif Smithk uploaded a new version of File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 4) Details of Post.gif current