Difference between revisions of "Main Page"
m |
m |
||
Line 29: | Line 29: | ||
|valign="top" style="border: 1px solid #A9A9A9; color: #000; background-color: #F8F8FF"| | |valign="top" style="border: 1px solid #A9A9A9; color: #000; background-color: #F8F8FF"| | ||
{| style="margin: 1em auto 1em auto" | {| style="margin: 1em auto 1em auto" | ||
+ | |- | ||
+ | |colspan="2" | [[image:Main Page Sep 2, 2014.jpg|center|390px|thumb|<center>''' [http://kciconstruction.com/ KCI Construction] continues Stage 3 work to construct the interior abutments and girders on the land bridge of the [http://www.modot.org/stlouis/major_projects/ParkovertheHighway.htm Park Over the Highway] project near the Gateway Arch in St. Louis. The land bridge is to be completed by December and all construction on the project is to be completed by October 2015. ''' </center>]] | ||
|- | |- | ||
|colspan="2" | [[image:Main Page Aug 29, 2014.jpg|center|390px|thumb|<center>''' The public showed up at the Upper Elementary School in Rogersville to view the construction timeline and improvements for [http://www.modot.org/southwest/major_projects/ProjectFreeway.htm Project Freeway] that will [http://www.modot.org/southwest/major_projects/Rogersville-85mb.mp4 convert Rte. 60 to a freeway around Rogersville]. ''' </center>]] | |colspan="2" | [[image:Main Page Aug 29, 2014.jpg|center|390px|thumb|<center>''' The public showed up at the Upper Elementary School in Rogersville to view the construction timeline and improvements for [http://www.modot.org/southwest/major_projects/ProjectFreeway.htm Project Freeway] that will [http://www.modot.org/southwest/major_projects/Rogersville-85mb.mp4 convert Rte. 60 to a freeway around Rogersville]. ''' </center>]] | ||
|- | |- | ||
− | |colspan="2" | | + | |colspan="2" | [[image:Main Page Aug 28, 2014.jpg|center|390px|thumb|<center>''' A contractor crew builds an [http://www.ada.gov/ ADA]-compliant sidewalk at Sunshine St. (Rte. D) under Rte. 65 in Springfield. ''' </center>]] |
− | |||
− | |||
|} | |} | ||
Line 45: | Line 45: | ||
{| style="margin: 1em auto 1em auto" | {| style="margin: 1em auto 1em auto" | ||
|- | |- | ||
− | |colspan="2" | [[image:Main Page Aug | + | |colspan="2" | [[image:Main Page Aug 27, 2014.jpg|center|390px|thumb|<center>''' On U.S. 69 near the Iowa border, Seasonal Maintc. Worker Kevin Gilreath works on bridge deck repairs along with others in his crew. ''' </center>]] |
|} | |} | ||
{| style="margin: 1em auto 1em auto" style="background-color: #F8F8FF" | {| style="margin: 1em auto 1em auto" style="background-color: #F8F8FF" | ||
|- | |- | ||
− | |colspan="2"|'''Perhaps you've wondered how many hits the most popular EPG articles have. As of | + | |colspan="2"|'''Perhaps you've wondered how many hits the most popular EPG articles have. As of early September, the numbers of hits are:''' |
|- | |- | ||
− | |'''20.''' [[:Category:400 FLEXIBLE PAVEMENT|EPG 400]], | + | |'''20.''' [[:Category:400 FLEXIBLE PAVEMENT|EPG 400]], 100622 ||'''10.''' [[:Category:616 Temporary Traffic Control|EPG 616]], 147344 |
|- | |- | ||
− | |'''19.''' [[751.5 Standard Details|EPG 751.5]], | + | |'''19.''' [[751.5 Standard Details|EPG 751.5]], 102884 ||'''9.''' [[:Category:101 Standard Forms|EPG 101]], 176893 |
|- | |- | ||
− | |'''18.''' [[903.6 Warning Signs|EPG 903.6]], | + | |'''18.''' [[903.6 Warning Signs|EPG 903.6]], 103243 ||'''8.''' [[:Category:600 INCIDENTAL CONSTRUCTION|EPG 600]], 180728 |
|- | |- | ||
− | |'''17.''' [[:Category:134 Engineering Professional Services|EPG 134]], | + | |'''17.''' [[:Category:134 Engineering Professional Services|EPG 134]], 105516 ||'''7.''' [[616.23 Traffic Control for Field Operations|EPG 616.23]], 182380 |
|- | |- | ||
− | |'''16.''' [[136.4 Consultant Selection and Consultant Contract Management|EPG 136.4]], | + | |'''16.''' [[136.4 Consultant Selection and Consultant Contract Management|EPG 136.4]], 108827 ||'''6.''' [[136.12 Figures, Glossary and Other Useful Links|EPG 136.12]], 185589 |
|- | |- | ||
− | |'''15.''' [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]], | + | |'''15.''' [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]], 111082 ||'''5.''' [[:Category:100 GENERAL|EPG 100]], 222921 |
|- | |- | ||
− | |'''14.''' [[ | + | |'''14.''' [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]], 114788 ||'''3.''' [[:Category:900 TRAFFIC CONTROL|EPG 900]], 248480 |
|- | |- | ||
− | |'''13.''' [[ | + | |'''13.''' [[136.9 Plans, Specs and Estimates (PSE)|EPG 136.9]], 114822 ||'''4.''' [[:Category:700 STRUCTURES AND HYDRAULICS|EPG 700]], 230428 |
|- | |- | ||
− | |'''12.''' [[:Category:903 Highway Signing|EPG 903]], | + | |'''12.''' [[:Category:903 Highway Signing|EPG 903]], 128504 ||'''2.''' [[:Category:751 LRFD Bridge Design Guidelines|EPG 751]], 279519 |
|- | |- | ||
− | |'''11.''' [[:Category:200 GEOMETRICS|EPG 200]], | + | |'''11.''' [[:Category:200 GEOMETRICS|EPG 200]], 143841 ||'''1.''' EPG Main Page, 1685757 |
|} | |} | ||
Revision as of 09:29, 2 September 2014
HELPFUL EPG VIDEOS: | •Logging into the EPG | |
•Finding Info in the EPG | ||
•Article History & How to Receive EMails When Articles are Revised | ||
___________ | ||
Want help on how to update your EPG guidance? It is available at EPG Approval Process. | ||
___________ | ||
The Electronic MoDOT Spec Book for Mobile Devices is now available |
RECENT POLICY CHANGES IN THE EPG | |||||||||||||||||||||||||||||||
MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as Practical Design and design-build, were used to deliver those commitments and have made MoDOT a leader in the transportation industry. These forward-thinking, innovative concepts are reflected in the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former Right of Way, Design, Bridge, Construction, Traffic and Maintenance manuals. MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG. Over 20 million hits on the EPG endorse this format to be easy to navigate and pleasing to read. A small HELP ARTICLE is included to assist with helpful hints on how to use the EPG as well as other points of interest.
|
8/29/14: Guidance about the considerations for guardrails in 1R, 2R, 3R and 4R work was clarified. 8/29/14: Guidance was added to clarify why CSL pipes must be filled with water and plugger or capped, as required by Sec 701.4.17.2.1. EPG 643.2.1.13 Federal Cost Participation for Reimbursable Utility Relocations 8/29/14: This new subarticle further clarifies and gives additional info for this topic. As a result of this new info, the wording used in Master Reimbursable Utility Agreements (MRUA) has been slightly revised to reference Engineering Policy Guide 643.2.1.44 (instead of 643.2.1.43). "Phased" Section 106 Process 8/28/14: EPG 135.2 The Section 106 Process for MoDOT Projects was revised to reflect a new agreement with FHWA and others allowing MoDOT to use a “phased” approach to achieve Section 106 compliance. Outdoor Advertising 8/26/14: Clarifying guidance about grandfathering an extension was added to EPG 236.16.11 Cutout and Extension Process. Engineering Judgment 8/26/14: A paragraph was added to EPG 900.1.9 Engineering Study and Engineering Judgment's "Guidance" and a sentence removed from EPG 900.1.13 Definitions' "A. Standard" to reflect that FHWA now permits MoDOT to use engineering judgment to modify "shall" conditions. Standard Detailing Notes 8/25/14: Note I1.67 was updated for greater clarity. The Professional Land Surveyor's Signature and Seal on Legal Descriptions 8/21/14: Guidance for the PLS signature and seal was clarified in EPG 238.2.17 Professional Land Surveyor Review as well as EPG 236.4.6.2 Methods of Legally Describing the Fee or Portion Thereof. 8/20/14: This program is now presented in EPG 751.8 LRFD Concrete Box Culverts. EPG 751.1.2.6.3.3 Roadway Fill 8/18/14: Guidance for the minimum fill over box culverts under roadway has been added. EPG 903.10.1 Sizes of General Service Signs 8/13/14: General Service Signs have been discontinued. They shall be left in place until they reach the end of their service life. Land Disturbance Training 2014 and Land Disturbance Tablet Training 2014 8/13/14: In EPG 806.8 Storm Water Pollution Prevention Plan (SWPPP), the Land Disturbance Training 2014, a summarized refresher presentation, was updated. Also, a video, Land Disturbance Tablet Training 2014, is now available for ipad and tablet users. EPG 750.7.11.1 Minimum Fill Heights 8/12/14: Guidance has been added for minimum fill heights over box culverts. Also, guidance for minimum fill heights over pipes was updated. Standard Detailing Notes 8/8/14: Note A1.1 was updated for LRFD Seismic Design. 8/8/14: Guidance and flood data tables were updated to be consistent with practical design. 8/7/14: MoDOT and MDNR have agreed to a sixth precaution involving dispersal of diamond grinding residue. EPG 236.5.14 Release of Temporary Easements and Retention Clauses 8/6/14: A fourth method is now available to release temporary easements or retention clauses. Sidewalks 8/5/14: A new paragraph at the bottom of Maintenance Responsibility clarifies existing policy. Guidance in EPG 642.1.1 Sidewalk Location and Width was revised to reflect the 4 ft. minimum width allowed after approval through the Design Exception process. Updated QRGs 8/4/14: Two QRGs, Emergency Contacts and Line Item Adjustments, have been updated in EPG 101 Standard Forms. EPG 902.15 Designing a Traffic Signal 8/1/14: The Signal Design Worksheets spreadsheet is now available. Standard Detailing Note 7/29/14: The new note, A5.6, will be used for all concrete superstructures where precast panels are used. EPG 903.4.12 Overhead Sign and Truss Inspection/Inventory 7/29/14: This revison reflects the decision to move sign truss inspection responsibility to Bridge. There is no approved inspection frequency at this time. 7/25/14: The extent of cut compaction has been extended to include unclassified material areas that fit the description of Class A material. Design Exception Process 7/21/14: In EPG 131.1.5.1 Safety Related Features, AASHTO's Highway Safety Manual analysis has been clarified. 7/21/14: In EPG 751.50, Note B3.33 was added stating the maximum actual weight of corrugated steel stay in place forms used for girder loading. The weight of stay in place corrugated forms was not included on plans before, but since the depth of these forms is to be designed by manufacturer, the assumed weight of these forms for girder loading is given as a limit. EPG 236.3.7.3 Contents of Clearance Certification 7/16/14: The copy of the estimate captioned "Acquisition Complete" is no longer to be attached to the certification when the project is certified clear. |