Difference between revisions of "Category:620 Pavement Marking"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (Per TS, eliminated Mem’l Day striping goal, use of double dropped wet reflective elements, & grooving on constr’n project if a durable pavem’t marking product is not being used.)
m (→‎Pavement Marking Guidelines: Per Traffic, replaced "All Classifications" chart heading with "Intersection Markings" as a clarification)
Line 25: Line 25:
 
{| border="1" class="wikitable" style="margin: 1em auto 1em auto; text-align:center;"
 
{| border="1" class="wikitable" style="margin: 1em auto 1em auto; text-align:center;"
 
|-
 
|-
! colspan="2" colspan="2"| !! style="background:#BEBEBE"|Divided Highways !! style="background:#BEBEBE"|Undivided Highways!! style="background:#BEBEBE"|All Classifications
+
! colspan="2" colspan="2"| !! style="background:#BEBEBE"|Divided Highways !! style="background:#BEBEBE"|Undivided Highways!! style="background:#BEBEBE"|Intersection Markings
 
|-
 
|-
 
|colspan="2" align="center" style="background:#F5F5F7"|'''Contractor Installations''' || align="center" style="width:15%"| High Build Paint with Type L Beads ||  Waterborne Paint with Type P Beads || Type 2 tape
 
|colspan="2" align="center" style="background:#F5F5F7"|'''Contractor Installations''' || align="center" style="width:15%"| High Build Paint with Type L Beads ||  Waterborne Paint with Type P Beads || Type 2 tape

Revision as of 14:54, 5 March 2015

620 Delineation System 3.jpg












Pavement Marking Guidelines

Divided Highways Undivided Highways Intersection Markings
Contractor Installations High Build Paint with Type L Beads Waterborne Paint with Type P Beads Type 2 tape
MoDOT Installations Major Roads – shall be striped annually unless retroreflectivity exceeds requirements for new pavement markings1 Waterborne Paint with Type L beads (60° and rising) Waterborne Paint with Type PM beads (60° and rising) Type 2 tape, preformed thermoplastic or waterborne paint with Type PM beads
Regionally Significant Roads – shall be striped annually unless retroreflectivity exceeds requirements for new pavement markings1 Not applicable Waterborne Paint with Type PM beads (50° and rising)
or
Cold weather paint with Type PM beads (35° to 50°)
Minor Roads≥400 AADT – maximum of 50% striped annually
Minor Roads<400 AADT – maximum of 33.3% striped annually
Surface Treatments
1 See Pavement Marking Acceptance Table