Difference between revisions of "Main Page"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m
m
Line 50: Line 50:
 
|colspan="2" |'''Perhaps you've wondered how many hits the most popular EPG articles have.  As of late May, the numbers of hits are:'''
 
|colspan="2" |'''Perhaps you've wondered how many hits the most popular EPG articles have.  As of late May, the numbers of hits are:'''
 
|-
 
|-
|'''20.'''  [[751.50 Standard Detailing Notes|EPG 751.50]], 114184 ||'''10.''' [[:Category:616 Temporary Traffic Control|EPG 616]], 162668
+
|'''20.'''  [[751.50 Standard Detailing Notes|EPG 751.50]], 114363 ||'''10.''' [[:Category:616 Temporary Traffic Control|EPG 616]], 162733
 
|-
 
|-
|'''19.'''  [[903.6 Warning Signs|EPG 903.6]], 116148     ||'''9.'''  [[:Category:600 INCIDENTAL CONSTRUCTION|EPG 600]], 197051
+
|'''19.'''  [[903.6 Warning Signs|EPG 903.6]], 116199     ||'''9.'''  [[:Category:600 INCIDENTAL CONSTRUCTION|EPG 600]], 197136
 
|-
 
|-
|'''18.'''  [[:Category:134 Engineering Professional Services|EPG 134]], 119022   ||'''8.'''  [[616.23 Traffic Control for Field Operations|EPG 616.23]], 208364
+
|'''18.'''  [[:Category:134 Engineering Professional Services|EPG 134]], 119126   ||'''8.'''  [[616.23 Traffic Control for Field Operations|EPG 616.23]], 208469
 
|-
 
|-
|'''17.'''  [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]], 120324   ||'''7.''' [[:Category:101 Standard Forms|EPG 101]], 219501
+
|'''17.'''  [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]], 120352   ||'''7.''' [[:Category:101 Standard Forms|EPG 101]], 219885
 
|-
 
|-
|'''16.'''    [[136.4 Consultant Selection and Consultant Contract Management|EPG 136.4]], 125232   ||'''6.''' [[136.12 Figures, Glossary and Other Useful Links|EPG 136.12]], 233697
+
|'''16.'''    [[136.4 Consultant Selection and Consultant Contract Management|EPG 136.4]], 125262   ||'''6.''' [[136.12 Figures, Glossary and Other Useful Links|EPG 136.12]], 234070
 
|-
 
|-
|'''15.'''    [[751.5 Standard Details|EPG 751.5]], 129479     ||'''5.''' [[:Category:100 GENERAL|EPG 100]], 241847
+
|'''15.'''    [[751.5 Standard Details|EPG 751.5]], 129562     ||'''5.''' [[:Category:100 GENERAL|EPG 100]], 241987
 
|-
 
|-
|'''14.'''    [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]], 132482     || '''4.''' [[:Category:700 STRUCTURES AND HYDRAULICS|EPG 700]], 251721
+
|'''14.'''    [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]], 132554     || '''4.''' [[:Category:700 STRUCTURES AND HYDRAULICS|EPG 700]], 251814
 
|-
 
|-
|'''13.'''    [[136.9 Plans, Specs and Estimates (PSE)|EPG 136.9]], 132694 || '''3.''' [[:Category:900 TRAFFIC CONTROL|EPG 900]], 272407
+
|'''13.'''    [[136.9 Plans, Specs and Estimates (PSE)|EPG 136.9]], 132764 || '''3.''' [[:Category:900 TRAFFIC CONTROL|EPG 900]], 272517
 
|-
 
|-
|'''12.'''  [[:Category:903 Highway Signing|EPG 903]], 147008 ||'''2.''' [[:Category:751 LRFD Bridge Design Guidelines|EPG 751]], 315691
+
|'''12.'''  [[:Category:903 Highway Signing|EPG 903]], 147073 ||'''2.''' [[:Category:751 LRFD Bridge Design Guidelines|EPG 751]], 315812
 
|-
 
|-
|'''11.'''  [[:Category:200 GEOMETRICS|EPG 200]], 153819 ||'''1.''' EPG Main Page, 1971429
+
|'''11.'''  [[:Category:200 GEOMETRICS|EPG 200]], 153885 ||'''1.''' EPG Main Page, 1973298
 
|}
 
|}
  

Revision as of 14:19, 29 May 2015

EPG 2013b.jpg


HELPFUL EPG VIDEOS: •Logging into the EPG •Finding Info in the EPG
•Article History & How to Receive EMails When Articles are Revised
___________
Want help on how to update your EPG guidance?  It is available at EPG Approval Process.
___________
The Electronic MoDOT Spec Book for Mobile Devices is now available. You may also sign up for E-Update notices. To receive notices regarding Engineering Policy Revisions, select "Engineering Policy" then mark the appropriate subjects of interest.


WELCOME
RECENT POLICY CHANGES IN THE EPG
A temporary bridge over Sinking Cr. in Shannon County is now open to traffic. The Rte. 19 bridge over Sinking Cr. had been reduced to one lane with a weight restriction of 20 tons. "The temporary structure will allow heavy truck traffic to avoid lengthy detours," said Asst. Distr. Engineer Chris Rutledge. "Until funding for construction of a new bridge becomes available, the bypass will remain in place. That could take years."
At a recent open house meeting, Transp. Proj. Manager Kristi Bachman (center, closest to the display) answers citizens’ questions about a project to build a new bridge over I-44 at Rtes. N and T near Republic.
Crews work on the new ramp to eastbound I-44 and the new driving surface on the Congressman Clay Sr. Bridge (the Poplar Street Bridge) in St. Louis.

MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as Practical Design and design-build, were used to deliver those commitments and have made MoDOT a leader in the transportation industry.

These forward-thinking, innovative concepts are reflected in the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former Right of Way, Design, Bridge, Construction, Traffic and Maintenance manuals.

MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG. Over 20 million hits on the EPG endorse this format to be easy to navigate and pleasing to read. A small HELP ARTICLE is included to assist with helpful hints on how to use the EPG as well as other points of interest.

Crews pour the final deck of the westbound I-70 Manchester Bridge. Also, the eastbound Hwy 40 on-ramp is now open.
Perhaps you've wondered how many hits the most popular EPG articles have. As of late May, the numbers of hits are:
20. EPG 751.50, 114363 10. EPG 616, 162733
19. EPG 903.6, 116199 9. EPG 600, 197136
18. EPG 134, 119126 8. EPG 616.23, 208469
17. EPG 751.40, 120352 7. EPG 101, 219885
16. EPG 136.4, 125262 6. EPG 136.12, 234070
15. EPG 751.5, 129562 5. EPG 100, 241987
14. EPG 620.2, 132554 4. EPG 700, 251814
13. EPG 136.9, 132764 3. EPG 900, 272517
12. EPG 903, 147073 2. EPG 751, 315812
11. EPG 200, 153885 1. EPG Main Page, 1973298

EPG 236.16.12.1 Digital Upgrade Request

5/29/15: In the digital sign upgrade process, upon receiving a written upgrade request from the permit owner, the trait “COS DIGITAL REQUEST” should now be updated to “YES” and the written upgrade request attached in TMS.

Pre-Acceptance Lists and Summary of Materials Inspected

5/28/15: PAL guidance in EPG 106.12.1.2 District Responsibility was clarified to allow districts to review PAL facilities on a quarterly basis. In EPG 106.21.1.1 Summary Packet of Materials Inspected, guidance was clarified to make the Summary of Concrete Component Testing portion of the summary report optional.

EPG 108.1 Subletting of Contract

5/27/15: Guidance for the contract subletting was clarified and the approval process was streamlined. Guidance on how to handle second tier subcontracting was added. The requirement for subcontract requests to be digitally signed and submitted electronically will be phased in.

Updated QRGs

5/15/15: In EPG 101 Standard Forms, Change Order Codes and Change Orders – Value Engineering were updated.

Commercially Useful Function (CUF) Determination Form

5/15/15: In EPG 146 Disadvantaged Business Enterprise (DBE), the latest version of the CUF Determination Form has been provided.

New QRG

5/14/15: How to Use Cognos Reports is now available in EPG 101 Standard Forms.

Non-Profit and Governmental Indirect Cost Rate Requirements

5/14/15: Guidance has been added to EPG 134.1.3 Consultant Qualification to accommodate 2CFR 200’s requirements for both non-profit and governmental organizations.

Updating Box Culverts to LRFD Design

5/13/15: In EPG 750.2.11, added guidance that flow line elevations may be below natural stream bottom. In EPG 750.7.4.1 and EPG 751.8.1, updated Reference Guide SBC. In EPG 751.8.3.2 and EPG 751.8.3.3: clarified that the E1 bar mark is used in the toe walls both up- and downstream, clarified that J6 bars are used in flared wings in lieu of J1 bars, and added bending diagrams for R1 and R2 bars. In EPG 751.50, revised Notes A1.2 and A2.10.

EPG 643 Utility Procedures

5/12/15: Three of the EPG 643 articles were generally updated. EPG 643.1 Utilities - Status and Liability Acceptance also updated info on "no utility impact" projects and removed detail of liability acceptance. In EPG 643.2 Local Utility Adjustments - Public and Private, guidance for Change Orders was updated. EPG 643.3 Policy, Standards and Regulations was organized to better reflect the CSR. Online permitting info was added and some of the bridge attachment info. was updated.

Change Order Codes

5/12/15: This QRG was clarified in both EPG 101 Standard Forms and EPG 109 Measurement and Payment to to better describe the reasons code should be used in any situation.

MoDOT Work Zone Impact Analysis Spreadsheet with HCM 2010 Program

5/11/15: This spreadsheet has been updated in EPG 616.13 Work Zone Capacity, Queue and Travel Delay.

EPG 907.7 Highway Safety Manual

4/23/15: This new article reflects current policy regarding the Highway Safety Manual.

ADA Checklist

4/22/15: The latest version of the ADA Checklist is now available at EPG 642.1 Sidewalk Design Criteria.

EPG 146.3.1 DBE Subcontract – Performing Work Onsite

4/20/15: New guidance is available for materials supplier DBEs who are not performing any labor on the project. Instructions have been provided for completing and saving CUF verification forms strictly related to materials suppliers.

EPG 150 Quality Management

4/15/15: Archaic guidance was deleted to conform with changes made to the July 2014 Quality Management JSP.  Also, MoDOT now provides a Corrective Action Request form for contractors to use.

EPG 750.7.3 Environmental Requirements

4/9/16: Along with new verbiage for clarification, a table, Summary of COE Regional Condition Requirements, has been added.

EPG 821 Herbicides and Roadsides

4/9/15: In EPG 821.11 Calibration, new guidance for Backpack Sprayer Calibrations has been added. Also, MoDOT herbicides for 2015 are listed in EPG 821.25 Products.

Outdoor Advertising

4/8/15: In EPG 236.16.10.1 Adding Controlled Routes, routes reclassified as NHS should now be inventoried within 90 days of notification.

R315 Scrub Seals

4/8/15: In EPG 170 Maintenance Activity Planning Guidelines, guidance for scrub seals has been added to R315 Pavement Preventative Maintenance (LM).

EPG 751.1.2.19 Soundings (Borings)

4/1/15: Guidance was updated to current practice and info from other articles was consolidated here. The M-40a, M-40b and the Request for Soil Properties forms were replaced with one form: Request for Final Soundings of Structures Form. A new document for using this new form provides guidance for obtaining Northings and Eastings, guidance for identifying classifications of routes and bridges and includes example sounding layouts.

Consultant Contract Administration Supplemental Agreements

3/31/15: EPG 134.5.2 Supplemental Agreements was clarified to reflect that Supplemental Agreements are signed by the Division Director or delegated staff. Thus it is unnecessary to process these through the Professional Services Committee. 

EPG 751.5.1.4 Contract Addendums and Construction Changes

3/27/15: Guidance about dates and plans changes for addendums was clarified.

Payroll Logs

3/27/15: This revision eliminated the unnecessary numbering of payrolls received from contractors. MoDOT now identifies payrolls by date range.

Required Field Test Tables

3/26/15: The Inspection and Testing Plan (ITP) gives sampling requirements and Excel to Oracle sheets for reporting material. Thus the now-outdated Required Field Test tables were removed from EPG 1002.1 Procedure, EPG 1003.1 Procedure, EPG 1004.1 Procedure, EPG 1005.1 Procedure, EPG 1006.1 Procedure, EPG 1007.1 Procedure and EPG 1009.1 Procedure.

EPG 751.5.1.6 Example Bridge Plan Sheets

3/23/15: Three new bridge plan sheet files have been added to replace outdated example plans.