Difference between revisions of "Category:101 Standard Forms"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m
m (→‎Quick Reference Guides (QRGs) 20px: Per CM, added AASHTOWare Project QRGs)
Line 354: Line 354:
 
:*[https://www6.modot.mo.gov/ElectronicPermitting/ElectronicPermitting.html# Permit for Work on Right of Way]
 
:*[https://www6.modot.mo.gov/ElectronicPermitting/ElectronicPermitting.html# Permit for Work on Right of Way]
  
===Quick Reference Guides (QRGs) [[image:bulldozer.jpg|20px]]===
+
===Quick Reference Guides (QRGs)===
 +
====AASHTOWare Project Quick Reference Guides (QRGs)====
 +
 
 +
:* [http://epg.modot.mo.gov/forms/CM/AWP_CM_AASHTOWARE_Project_Terminology.docx AWP CM AASHTOWARE Project Terminology]
 +
 
 +
:* [http://epg.modot.mo.gov/forms/CM/AWP_CM_Filters.doc AWP CM Filters]
 +
 
 +
:* [http://epg.modot.mo.gov/forms/CM/AWP_CO_1ChangeOrderOverview.doc AWP CO 1 Change Order Overview]
 +
 
 +
:* [http://epg.modot.mo.gov/forms/CM/AWP_CO_2ChangeOrderAddingNewItemorOverrunUnderrunExisting.doc AWP CO 2 Change Order Adding New Item or Overrun/Underrun of Existing Items]
 +
 
 +
:* [http://epg.modot.mo.gov/forms/CM/AWP_CO_3ChangeOrderTimeExtension.doc AWP CO 3 Change Order Time Extension]
 +
 
 +
:* [http://epg.modot.mo.gov/forms/CM/AWP_CO_4ChangeOrderValueEngineering.doc AWP CO 4 Change Order Value Engineering]
 +
 
 +
:* [http://epg.modot.mo.gov/forms/CM/AWP_CO_5ChangeOrderNoCostContractModification.doc AWP CO 5 Change Order, No Cost Contract Modification]
 +
 
 +
:* [http://epg.modot.mo.gov/forms/CM/AWP_CO_6ChangeOrderMobilizationAndContractBond.doc AWP CO 6 Change Order, Mobilization and Contract Bond]
 +
 
 +
:* [http://epg.modot.mo.gov/forms/CM/AWP_CO_7ChangeOrderApproval.doc AWP CO 7 Change Order Approval]
 +
 
 +
:* [http://epg.modot.mo.gov/forms/CM/AWP_CO_Change_Order_Codes.doc AWP CO Change Order Codes]
 +
 
 +
:* [http://epg.modot.mo.gov/forms/CM/AWP_CO_Change_Order_Reports.doc AWP CO Change Order Reports]
 +
 
 +
:* [http://epg.modot.mo.gov/forms/CM/AWP_CO_ContractVendorAssets.doc AWP CO Contract Vendor Assets]
 +
 
 +
:* [http://epg.modot.mo.gov/forms/CM/AWP_CO_Contract_Adjustments.doc AWP CO Contract Adjustments]
 +
 
 +
:* [http://epg.modot.mo.gov/forms/CM/AWP_CO_Contract_Times.doc AWP CO Contract Times]
 +
 
 +
:* [http://epg.modot.mo.gov/forms/CM/AWP_CO_DailyDiary.doc AWP CO Daily Diary]
 +
 
 +
:* [http://epg.modot.mo.gov/forms/CM/AWP_CO_DailyDiaryAdjustments.doc AWP CO Daily Diary Adjustments]
 +
 
 +
:* [http://epg.modot.mo.gov/forms/CM/AWP_CO_DailyWorkReport.doc AWP CO Daily Work Report]
 +
 
 +
:* [http://epg.modot.mo.gov/forms/CM/AWP_CO_Disposition_Remarks_PAL_Material.doc AWP CO Disposition Remarks for PAL Material]
 +
 
 +
:* [http://epg.modot.mo.gov/forms/CM/AWP_CO_EmergencyContacts.doc AWP CO Emergency Contacts]
 +
 
 +
:* [http://epg.modot.mo.gov/forms/CM/AWP_CO_Estimate.doc AWP CO Estimate]
 +
 
 +
:* [http://epg.modot.mo.gov/forms/CM/AWP_CO_Item_Adjustments.doc AWP CO Item Adjustments]
 +
 
 +
:* [http://epg.modot.mo.gov/forms/CM/AWP_CO_Milestones.doc AWP CO Milestones]
 +
 
 +
:* [http://epg.modot.mo.gov/forms/CM/AWP_CO_Signal_Maintenance.doc AWP CO Signal Maintenance]
 +
 
 +
:* [http://epg.modot.mo.gov/forms/CM/AWP_CO_Change_Order_Reason_Codes_for_SL_Time_Extension_Change_Orders.doc AWP CO SL District Reason Codes for Time Extension Change Orders]
 +
 
 +
:* [http://epg.modot.mo.gov/forms/CM/AWP_CO_Subcontract.doc AWP CO Subcontract]
 +
 
 +
:* [http://epg.modot.mo.gov/forms/CM/AWP_MA_Adding_Contract_Lines_For_Acceptance_Actions.doc AWP MA Adding Contract Lines For Acceptance Actions]
 +
 
 +
:* [http://epg.modot.mo.gov/forms/CM/AWP_MA_DEC_Sample_Record.doc AWP MA DEC Sample Record]
 +
 
 +
:* [http://epg.modot.mo.gov/forms/CM/AWP_MA_EditingContractAcceptanceActionsAndActionRelationships.doc AWP MA Editing Contract Acceptance Actions and Action Relationships]
 +
 
 +
:* [http://epg.modot.mo.gov/forms/CM/AWP_MA_Generating_Contract_SampleChecklist.doc AWP MA Generating Contract Sample Checklist]
 +
 
 +
:* [http://epg.modot.mo.gov/forms/CM/AWP_MA_PAL_Plant_Inspection_Record.doc AWP MA PAL Plant Inspection Record]
 +
 
 +
:* [http://epg.modot.mo.gov/forms/CM/AWP_MA_ReGenerating_Contract_Lines_For_Original_Materials_And_Acceptance_Actions.doc AWP MA Regenerating Contract Lines for Original Materials and Acceptance Actions]
 +
 
 +
:* [http://epg.modot.mo.gov/forms/CM/AWP_MA_Sample_Record_General.docx AWP MA Sample Record, General]
 +
 
 +
:* [http://epg.modot.mo.gov/forms/CM/AWP_MA_Sample_Record_General.docx AWP MA Sampling and Testing Status Report]
 +
 
 +
:* [http://epg.modot.mo.gov/forms/CM/AWP_MA_UsingFindSample.docx AWP MA Using the Find Sample Function]
 +
 
 +
====SiteManager Quick Reference Guides (QRGs) [[image:bulldozer.jpg|20px]]====
  
 
:* [http://epg.modot.mo.gov/forms/CM/Change_Order_Codes.doc Change Order Codes]  
 
:* [http://epg.modot.mo.gov/forms/CM/Change_Order_Codes.doc Change Order Codes]  

Revision as of 11:05, 10 December 2018

EPG articles are not referenced as "sections" but as EPG XXX.X to avoid confusion with MoDOT specs (which are contractually binding).

Standard forms organized by functional unit are accessible from this page. The files accessible by the links below are identical to those accessed through Word, Excel or other software application by MoDOT employees. Many of these file links are also contained in Engineering Policy Guide articles that refer to the forms.


Bridge

101 Bridge.jpg

Construction and Materials

101CM.jpg

Forms for Contractor Use

Construction and Contractor Related

Materials Related

Posters, Federal Aid

Please refer to EPG 110.2 Federal-Aid Projects, Required Notices and Posters.

Posters, State Aid

Please refer to EPG 110.2 Federal-Aid Projects, Required Notices and Posters.

Utility or Right of Way Related

Quick Reference Guides (QRGs)

AASHTOWare Project Quick Reference Guides (QRGs)

SiteManager Quick Reference Guides (QRGs) Bulldozer.jpg

Design

Microstation D-Sheets
Signing
D-28, D-29 through D-34
Signals
D-37A through D-37d, D-38 through D-38e
Typical Sections
D-49 through D-70
Miscellaneous
D-71

Bridge

Checklist

Computer


Contracts

Design Forms

Engineering Professional Services

Environmental and Cultural

Hearings

Materials

Photo


Planning

Right of Way

Scoping

101 survey.jpg

Survey

External Civil Rights

Financial Services

Maintenance

Chip Seal Forms

Bridge Maintenance

Snow & Ice Control

Rest Areas

Commuter Lots

Disasters

Performance Indicators

Pavement Management

Motor Carrier Services


Planning

Right of Way

General Information

Right of Way Organization and Personnel

Administration

Description Writing and Titles

Property Management

Appraisal and Appraisal Review

Negotiation

Relocation Assistance Program

Asbestos Abatement-Removal of Building Improvement

Right Of Way Condemnation

Mediation

Quality Assurance Reviews

Designing Right of Way Plans

Change in Route Status Report

Requests from Cities for Annexations

Outdoor Advertising

Junkyards

Local Public Agency Land Acquisition

101 bottom.jpg