== 751.36.1 General ==
+
==751.36.1 General==
  
 
'''Accuracy Required'''
 
'''Accuracy Required'''
Line 6: Line 6:
 
All  capacities shall be taken to the nearest 1 (one) kip, loads shown on plans.
 
All  capacities shall be taken to the nearest 1 (one) kip, loads shown on plans.
  
 +
===751.36.1.1 Maximum Specified Pile Lengths===
  
'''Maximum Specified Pile Lengths'''
+
:{|
 
+
|Structural Steel Pile||width="25"| ||No Limit
{|
 
|Steel.....................||No Limit
 
 
|-
 
|-
|Cast-In-Place.........||No Limit
+
|Cast-In-Place (CIP) (Welded or Seamless Steel Shell (Pipe)) Pile||width="25"| ||No Limit  
 
|}
 
|}
 +
It is not advisable to design pile deeper than borings. If longer pile depth is required to meet design requirements, then request Geotechnical Section to provide deeper borings or increase the number of piles which will reduce load per pile as well as required pile length.
  
 
+
===751.36.1.2 Probe Pile===
'''Steel Pile'''
 
 
 
Steel piling shall be ASTM A709 (Grade 50) steel.
 
 
 
 
 
'''Test Pile'''
 
 
{|style="padding: 0.3em; margin-left:15px; border:1px solid #a9a9a9; text-align:center; font-size: 95%; background:#ffddcc" width="210px" align="right"  
 
{|style="padding: 0.3em; margin-left:15px; border:1px solid #a9a9a9; text-align:center; font-size: 95%; background:#ffddcc" width="210px" align="right"  
 
|-
 
|-
Line 31: Line 25:
 
|}
 
|}
  
Length shall be pile length + 10’.
+
Length shall be estimated pile length + 10’.
 
 
When test piles are specified to be driven-in-place they shall not be included in the number of piles indicated in the “PILE DATA” Table.
+
When probe piles are specified to be driven-in-place they shall not be included in the number of piles indicated in the “FOUNDATION DATA” Table.
 +
 
 +
===751.36.1.3 Static Load Test Pile===
 +
 
 +
When Static Load Test Pile is specified, the nominal axial compressive resistance value shall be determined by an actual static load test.
  
 +
For preboring for piles see [https://www.modot.org/missouri-standard-specifications-highway-construction Sec 702].
  
'''Load Test Pile'''
+
===751.36.1.4 Preliminary Geotechnical Report Information===
  
When Load Test Pile are specified, the nominal resistance value shall be determined by an actual load test.
+
The foundation can be more economically designed with increased geotechnical information about the specific project site.
  
For preboring for piles see Sec 702.
+
Soil information should be reviewed for rock or refusal elevations.  Auger hole information and rock or refusal data are sufficient for piles founded on rock material to indicate length of piling estimated.  Standard Penetration Test information is especially desirable at '''each''' bent if friction piles are utilized or the depth of rock exceeds approximately 60 feet.
  
 +
===751.36.1.5 Geotechnical Redundancy===
 +
 +
'''Pile Nonredundancy (20 percent resistance factor reduction)'''
  
'''Preliminary Geotechnical Report Information'''
+
Conventional bridge pile foundations:
  
The foundation can be more economically designed with increased geotechnical information about the specific project site.
+
For pile cap footings where a small pile group is defined as less than 5 piles, reduce pile geotechnical and structural resistance factors shown in LRFD Table 10.5.5.2.3-1.
  
Soil information should be reviewed for rock or refusal elevations.  Auger hole information and rock or refusal data are sufficient for piles founded on rock material to indicate length of piling estimated. Standard Penetration Test information is especially desirable at '''each''' bent if friction piles are utilized or the depth of rock exceeds approximately 60 feet.  
+
For pile cap bents, the small pile group definition of less than 5 piles is debatable in terms of nonredundancy and applying a resistance factor reduction. The notion of a bridge collapse or a pile cap bent failure directly related to the failure of a single pile or due to its pile arrangement in this instance, or ignoring the strength contribution of the superstructure via diaphragms in some cases would seem to challenge applying the small pile group concept to pile bent systems as developed in NCHRP 508 and alluded to in the LRFD commentary. In terms of reliability, application of this factor could be utilized to account for exposed piling subject to indeterminable scour, erosion, debris loading or vehicular impact loadings as an increased factor of safety.
  
 +
For integral and non-integral end bent cap piles, the reduction factor need not be considered for less than 5 piles due to the studied infrequency of abutment structural failures (NCHRP 458, p. 6) and statewide satisfactory historical performance.
  
'''Geotechnical Redundancy'''
+
For intermediate bent cap piles, the reduction factor need not be considered for less than 5 piles under normal design conditions. It may be considered for unaccountable loading conditions that may be outside the scope of accountable strength or extreme event limit state loading and is specific to a bridge site and application and is therefore utilized at the discretion of the Structural Project Manager or Structural Liaison Engineer. Further, if applied, it shall be utilized for determining pile length if applicable, lateral and horizontal geotechnical and structural resistances. Alternatively, a minimum of 5 piles may save consideration and cost.
  
A nonredundant pile group is a pile group of less than five piles. Resistance factors should be reduced by 20% for nonredundant pile groups.  Greater reductions (additional 20%) should be considered when single pile supports an entire bridge pier.
+
Any substructure with a pile foundation can be checked for structural redundancy if necessary by performing structural analyses considering the hypothetical transference of loads to presumed surviving members of a substructure like columns or piles (load shedding). This direct analysis procedure could be performed in place of using a reduction factor for other than pile cap footings.
  
<div id="Waterjetting"></div>
+
For nonconventional bridges like major bridges and major river and lake bridges, the application of pile redundancy may take a more strict direction. See the Structural Project Manager or Structural Liaison Engineer.
  
 +
===751.36.1.6 Waterjetting===
  
'''Waterjetting'''
 
 
{|style="padding: 0.3em; margin-left:10px; border:1px solid #ff0000; text-align:left; font-size: 95%; background:#f5f5f5" width="250px" align="right"  
 
{|style="padding: 0.3em; margin-left:10px; border:1px solid #ff0000; text-align:left; font-size: 95%; background:#f5f5f5" width="250px" align="right"  
 
|-
 
|-
Line 63: Line 66:
 
|}
 
|}
  
Waterjetting is a method available to contractors to aid in driving piles. If the drivability analysis indicates difficulty driving piles then it can be assumed that the contractor may use waterjetting to aid in driven the piles. The [[media:751.36.1 Waterjeting.docx|Commentary on Waterjetting]] discusses items to consider when there is a possibility of the use of waterjetting.
+
Waterjetting is a method available to contractors to aid in driving piles. If the drivability analysis indicates difficulty driving piles then it can be assumed that the contractor may use waterjetting to aid in driving the piles. The [[media:751.36.1 Waterjeting.docx|Commentary on Waterjetting]] discusses items to consider when there is a possibility of the use of waterjetting.
 +
 
 +
===751.36.1.7 Restrike===
 +
 
 +
In general, designers should NOT require restrikes unless the Geotechnical Section requires restrike because it delays construction and makes it harder for contractors to estimate pile driving time on site. The Geotechnical Section shall show on borings data a statement indicating either "No Restrike Recommended" or "Restrike Recommended", with requirements.
 +
 
 +
==751.36.2 Steel Pile==
 +
 
 +
===751.36.2.1 Material Properties===
 +
 
 +
====751.36.2.1.1 Structural Steel HP Pile====
 +
 
 +
Structural Steel HP piling shall be ASTM A709 Grade 50S (fy = 50 ksi) steel.
 +
 
 +
====751.36.2.1.2 Cast-In-Place (CIP) Pile====
 +
 
 +
Welded or Seamless steel shell (Pipe) for CIP piling shall be ASTM 252 Grade 3
 +
 
 +
:(f<sub>y</sub> = 45 ksi, E<sub>s</sub> = 29,000 ksi)
 +
 
 +
'''Concrete'''
 +
{|style="text-align:left"
 +
|Class B - 1 Concrete (Substructure)||width="50"| ||= 4.0 ksi
 +
|}
 +
Modulus of elasticity,
 +
:<math>E_c = 33000 K_1(w^{1.5}_c)\sqrt{f'_c}</math>
 +
 +
Where:
 +
 
 +
:''f'<sub>c</sub>'' in ksi
 +
:''w<sub>c</sub>'' = unit weight of nonreinforced concrete = 0.145 kcf
 +
:''K<sub>1</sub>'' = correction factor for source of aggregate
 +
::= 1.0 unless determined by physical testing
 +
 +
'''Reinforcing Steel '''
 +
{|style="text-align:left"
 +
|Minimum yield strength, ||width="50"| || = 60.0 ksi
 +
|-
 +
|Steel modulus of elasticity, ||width="50"| || = 29000 ksi
 +
|}
 +
 
 +
===751.36.2.2 Steel Pile Type===
 +
 
 +
Avoid multiple sizes and/or types of pilings on typical bridges (5 spans or less). Also using same size and type of pile on project helps with galvanizing.
  
== 751.36.2 Steel Pile ==
+
There are two types of piles generally used by MoDOT. They are structural steel HP pile and close-ended pipe pile (cast-in-place, CIP). Open ended pipe pile (cast-in-place, CIP) can also be used. Structural steel piling are generally referred to as HP piling and two different standard AISC shapes are typically utilized: HP12 x 53 and HP14 x 73. Concrete piling are generally referred to as cast-in-place or CIP piling because the concrete is poured and cast in steel shells which are driven first or pre-driven.
  
 +
====751.36.2.2.1 Structural Steel HP Pile====
 +
<center>
 
{|style="text-align:center"
 
{|style="text-align:center"
 
|+'''HP Size'''
 
|+'''HP Size'''
!width="100pt"|Section||widht="100pt"|Area
+
!width="100pt"|Section||width="25"| ||width="100pt"|Area
|-
 
|HP 10 x 42||12.4 sq. in.
 
 
|-
 
|-
|HP 12 x 53||15.5 sq. in.
+
|HP 12 x 53|| ||15.5 sq. in.
 
|-
 
|-
|HP 14 x 73||21.4 sq. in.
+
|HP 14 x 73|| ||21.4 sq. in.
 
|}
 
|}
 +
</center>
 +
The HP 12 x 53 section should generally be used unless a heavier section produces a more economical design or required by a Drivability Analysis.
  
The HP 10 x 42 section should generally be used unless a heavier section produces a more economical design or required by a Drivability Analysis. The same size pile must be used for all footings on the same bent. Pile size may vary from bent to bent.
+
====751.36.2.2.2 Cast-In-Place (CIP) Pile====
 
+
<center>'''Cast-In-Place (CIP) (Welded or Seamless Steel Shell (Pipe)) Pile Size'''  
'''Shell Cast-In-Place Pipe Pile (CIP) Size'''
 
 
 
 
{|border="1" style="text-align:center;" cellpadding="5" align="center"  cellspacing="0"
 
{|border="1" style="text-align:center;" cellpadding="5" align="center"  cellspacing="0"
!Outside Diameter!!Minimum Wall<br/>Thickness !!Common Available Wall<br/>Thicknesses  
+
!Outside Diameter!!Minimum Nominal Wall<br/>Thickness !!Common Available Nominal Wall<br/>Thicknesses  
 +
|-
 +
|14 inch||1/4”|| 1/4”, 3/8”, 1/2” and 5/8”<sup>2</sup>
 
|-
 
|-
|14 inch||1/4”|| 1/4”, 3/8”, 1/2” and 3/4”
+
|16 inch||1/4”|| 1/4”, 3/8”, 1/2” and 5/8”<sup>2</sup>
 
|-
 
|-
|16 inch||3/8”|| 3/8”, 1/2” and 3/4”
+
|20 inch<sup>1</sup>||1/4”|| 1/4”, 3/8”, 1/2” and 5/8”
 
|-
 
|-
|20 inch<sup>1</sup>||1/2”|| 1/2”, 3/4” and 1”
+
|24 inch<sup>1</sup>||3/8”|| 3/8”, 1/2”, 5/8” and 3/4”
 
|-
 
|-
|24 inch<sup>1</sup>||1/2”|| 1/2”, 3/4” and 1”
+
|colspan="3" align="left"|<sup>'''1'''</sup> Use when required to meet KL/r ratio or when smaller diameter CIP do not meet design.
 
|-
 
|-
|colspan="3" align="left"|<sup>1</sup> Use only with SPM approval.
+
|colspan="3" align="left"|<sup>'''2'''</sup> 5/8” wall thickness is less commonly available than the smaller wall thicknesses of pipe pile.
 
|}
 
|}
 
+
</center>
Use minimum wall thickness which is preferred. When this wall thickness is inadequate for structural strength or for driving, then a thicker wall shall be used. Specify the required wall thickness. For 5/8” pipe pile which is less commonly available, it may be specified on the plans and noted as a minimum.  The contractor shall determine the pile wall thickness required to avoid damage during driving or after adjacent piles have been driven but not less than the minimum specified.
+
Use minimum nominal wall thickness which is preferred. When this wall thickness is inadequate for structural strength or for driving (drivability), then a thicker wall shall be used. Specify the required wall thickness. The contractor shall determine the pile wall thickness required to avoid damage during driving or after adjacent piles have been driven, but not less than the minimum specified.  
  
 
Minimum tip elevation must be shown on plans. Criteria for minimum tip elevation shall also be shown.  The following information shall be included on the plans:
 
Minimum tip elevation must be shown on plans. Criteria for minimum tip elevation shall also be shown.  The following information shall be included on the plans:
Line 107: Line 155:
 
::*to minimize post-construction settlements
 
::*to minimize post-construction settlements
 
::*for minimum embedment into natural ground
 
::*for minimum embedment into natural ground
:'''*'''For scour, estimated maximum scour depth (elevation) must be shown on plans.
 
  
:Guidance Note: Show maximum of total scour depths estimated for multiple return periods in years  from Preliminary design which should be given on the Design Layout. Show the controlling return period (e.g. 100, 200, 500). If return periods are different for different bents, add a new line.
+
::'''*'''For scour, estimated maximum scour depth (elevation) must be shown on plans.
 +
 
 +
:Guidance Note: Show maximum of total scour depths estimated for multiple return periods in years  from Preliminary design which should be given on the Design Layout. Show the controlling return period (e.g. 100, 200, 500). If return periods are different for different bents, add a new line in foundation data table.
 +
 
 +
==751.36.3 Pile Point Reinforcement==
 +
 
 +
Pile point reinforcement is also known as a pile tip (e.g., pile shoe or pile toe attachments).
 +
 
 +
===751.36.3.1 Structural Steel HP Pile===
 +
 
 +
Pile point reinforcement shall be required for all HP piles required to be driven to bear on rock regardless of pile strength used for design loadings or geomaterial (soils with or without gravel or cobbles) to be penetrated. Pile point reinforcement shall be manufactured in one piece of cast steel. Manufactured pile point reinforcements are available in various shapes and styles as shown in FHWA-NHI-16-010, Figure 16-5.
 +
 
 +
===751.36.3.2 Cast-In-Place (CIP) Pile===
 +
 
 +
For CIP piles, use pile point reinforcement if boulders or cobbles or dense gravel are anticipated.
 +
 
 +
Geotechnical Section shall recommend when pile point reinforcement is needed and type of pile point reinforcement on the Foundation Investigation Geotechnical Report.
 +
 
 +
<u>For Closed Ended Cast-In-Place Concrete Pile (CECIP)</u>
  
 +
Two types are available.
  
 +
:'''1. “Cruciform”''' type should be used as recommended and for hard driving into soft rock, weathered rock, and shales. It will continue to develop end bearing resistance while driving since an exposed flat closure plate is included with this point type. The closure plate acts to distribute load to the pile cross sectional area.
 +
:'''2. “Conical”''' type should be used as recommended and when there is harder than typical driving conditions, for example hard driving through difficult soils like heavily cobblestoned, very gravelly, densely layered soils. Severely obstructed driving can cause CIP piles with conical points to deflect. Conical pile points are always the more expensive option.
  
<div id="Pile Point Reinforcement "></div>
+
<u>For Open Ended Cast-In-Place Concrete Pile (OECIP)</u>
  
'''Pile Point Reinforcement '''
+
One type is available.
  
Pile point reinforcement shall be required for all HP piles required to be driven to bear on rock regardless of pile strength used for design loadings or geomaterial (soils with or without gravel or cobbles) to be penetrated. For CIP piles, use pile point reinforcement if boulders or cobbles or dense gravel are anticipated.
+
:'''“Open Ended Cutting Shoe”''' type should be used as recommended and when protection of the pipe end during driving could be a concern. It is also useful if uneven bearing is anticipated since a reinforced tip can redistribute load and lessen point loading concerns.  
  
<div id="Anchorage of Piles for Seismic"></div>
+
:Open ended piles are not recommended for bearing on hard rock since this situation could create inefficient point loading that could be structurally damaging.
'''Anchorage of Piles for Seismic Categories B, C and D'''
 
  
:'''HP Pile'''
+
When Geotechnical Section indicates that pile point reinforcement is needed on the boring log, then the recommended pile point reinforcement type shall be shown on the plan details. Generally this information is also shown on the Design layout.
:Use standard seismic anchorage detail for all HP pile sizes. Modify detail (bolt size, no. of bolts, angle size) if seismic and geotechnical analyses requires increased uplift resistance. Follow AASHTO 17th Ed. LFD or AASHTO Guide Specifications for LRFD Seismic Bridge Design (SGS).
 
  
:[[image:751.36.2.jpg|center|450px]]
+
For pile point reinforcement detail, see
 
<center>
 
<center>
:Note: Galvanizing ∠4x4, ¾” diameter high strength bolts, washers and nuts will not be required.</center>
+
{| border="1" class="wikitable" style="margin: 1em auto 1em auto" style="text-align:center"
 +
|+
 +
| style="background:#BEBEBE" width="400" |'''[http://www.modot.org/business/consultant_resources/bridgestandards.htm Bridge Standard Drawings]'''
 +
|-
 +
|align="center"|[http://www.modot.org/business/standard_drawings2/pile_new_title_block.htm Pile]
 +
|}
 +
 
 +
</center>
 +
 
 +
==751.36.4 Anchorage of Piles for Seismic Categories B, C and D==
 +
 
 +
===751.36.4.1 Structural Steel HP Pile - Details===
 +
 
 +
Use standard seismic anchorage detail for all HP pile sizes. Modify detail (bolt size, no. of bolts, angle size) if seismic and geotechnical analyses requires increased uplift resistance. Follow AASHTO 17th Ed. LFD or AASHTO Guide Specifications for LRFD Seismic Bridge Design (SGS).
  
 +
:[[image:751.36.4.1.jpg|center|450px]]
 +
<center>
 +
:Note: Galvanizing ∟4x4, ¾” diameter bolts, (ASTM F3125 Grade A325 Type 1 Plain), washers and nuts will not be required.</center>
  
<center>'''CAST-IN-PLACE Pile - Details'''
+
===751.36.4.2 Cast-In-Place (CIP) Pile - Details===
 +
<center>
 
{| border="1" class="wikitable" style="margin: 1em auto 1em auto" style="text-align:center"
 
{| border="1" class="wikitable" style="margin: 1em auto 1em auto" style="text-align:center"
 
|+  
 
|+  
Line 137: Line 220:
 
|align="center"|[http://www.modot.org/business/standard_drawings2/pile_new_title_block.htm Pile]
 
|align="center"|[http://www.modot.org/business/standard_drawings2/pile_new_title_block.htm Pile]
 
|}
 
|}
 
 
</center>
 
</center>
  
== 751.36.3 Design Procedure ==
+
==751.36.5 Design Procedure==
  
 
*Structural Analysis
 
*Structural Analysis
Line 146: Line 228:
 
*Drivability Analysis
 
*Drivability Analysis
  
 
+
===751.36.5.1 Design Procedure Outline===
'''Design Procedure Outline'''
 
  
 
*Determine foundation load effects from the superstructure and substructure for Service, Strength and Extreme Event Limit States.   
 
*Determine foundation load effects from the superstructure and substructure for Service, Strength and Extreme Event Limit States.   
Line 153: Line 234:
 
*Determine if downdrag loadings should be considered.   
 
*Determine if downdrag loadings should be considered.   
 
*Select preliminary pile size and pile layout.
 
*Select preliminary pile size and pile layout.
*Perform Pile Soil Interaction (DRIVEN) Analysis.  Estimate Pile Length and pile capacity.
+
*Perform a Static Pile Soil Interaction Analysis.  Estimate Pile Length and pile capacity.
*Based on pile type and material, determine Resistance Factors for Structural Strength <math>\, (\phi_S )</math> .
+
*Based on pile type and material, determine Resistance Factors for Structural Strength (<math>\, \phi_c</math> and <math>\, \phi_f</math>).
 
*Determine:
 
*Determine:
 
**Maximum axial load effects at toe of a single pile
 
**Maximum axial load effects at toe of a single pile
Line 166: Line 247:
 
**Determine Structural Shear Resistance
 
**Determine Structural Shear Resistance
 
*Determine method for pile driving acceptance criteria
 
*Determine method for pile driving acceptance criteria
*Determine Resistance Factor for Geotechnical Strength <math>\, (\phi_G)</math> .
+
*Determine Resistance Factor for Geotechnical Resistance (<math>\, \phi_{stat}</math>) and Driving Resistance (<math>\, \phi_{dyn}</math>).
 
*If other than end bearing pile on rock or shale, determine Nominal Axial Geotechnical Resistance for pile.
 
*If other than end bearing pile on rock or shale, determine Nominal Axial Geotechnical Resistance for pile.
 
*Determine Factored Axial Geotechnical Resistance for single pile.
 
*Determine Factored Axial Geotechnical Resistance for single pile.
 
*Determine Nominal pullout resistance if pile uplift reactions exist.
 
*Determine Nominal pullout resistance if pile uplift reactions exist.
 
*Check for pile group effects.
 
*Check for pile group effects.
*Check Drivability of pile using the Wave equation
+
*Resistance of Pile Groups in Compression 
*Review Pile Soil Interaction (DRIVEN) Analysis and pile lengths
+
*Check Drivability of all pile (bearing and friction pile) using the Wave equation (GRLWEAP).
*Show proper Pile Data on Plan Sheets.
+
*Review Static Pile Soil Interaction Analysis and pile lengths for friction pile.
 +
*Show proper Pile Data on Plan Sheets (Foundation Data Table).
 +
 
 +
===751.36.5.2 Structural Resistance Factor (<math>\phi_c</math> and <math>\phi_f</math>) for Strength Limit State, LRFD 6.5.4.2===
 +
'''Resistance Factor for Structural Strength <math>(\, \phi_S )</math> '''
 +
 
 +
The structural resistance factor for axial resistance in compression is dependent upon the expected driving conditions. When the pile is subject to damage due to severe driving conditions where use of pile point reinforcement is necessary:
 +
 
 +
:Steel Shells (Pipe): <math> \phi_c </math>= 0.60
 +
:HP Piles: <math> \phi_c </math>= 0.50
 +
 
 +
When the pile is subject to good driving conditions where use of pile point reinforcement is not necessary:
  
 +
:Steel Shells (Pipe) Piles: <math> \phi_c </math>= 0.70
 +
:HP Piles: <math> \phi_c </math>= 0.60
  
'''Resistance Factor for Structural Strength <math>(\, \phi_S )</math> '''
+
For HP piles, pile point reinforcement is always required when HP piles are anticipated to be driven to rock and proofed. Driving HP piles to rock is considered severe driving conditions for determination of structural resistance factor. However, driving HP piles through overburden not likely to impede driving to deep rock or preboring to rock for setting piles are two situations that could be considered as less than severe. Further, driving any steel pile through soil without rubble, boulders, cobbles or very dense gravel could be considered good driving conditions for determination of structural resistance factor. Consult the Structural Project Manager or Structural Liaison Engineer.
  
Pile structural resistance factor for axial resistance in compression and subject to damage due to severe driving conditions where use of pile point reinforcement is necessary.
+
The structural resistance factor for combined axial and flexural resistance of undamaged piles:
 +
:Axial resistance factor for HP Piles: <math> \phi_c </math>= 0.70
 +
:Axial resistance for Steel Shells (Pipe): <math> \phi_c </math>= 0.80
 +
:Flexural resistance factor for HP Piles or Steel Shells: <math> \phi_f </math>= 1.00
  
For HP piles, pile point reinforcement is always required when HP piles are anticipated to be driven to rock and proofed. Driving HP piles to rock is considered severe driving conditions for determination of structural resistance factor.
+
For Extreme Event Limit States see LRFD 10.5.5.3.
:Metal Shells - 0.60
 
:H-Piles - 0.50
 
  
Pile structural resistance factor for axial resistance in compression under good driving conditions where use of pile point reinforcement is not necessary.
+
<div id="751.36.5.3 Geotechnical Resistance"></div>
 +
===751.36.5.3 Geotechnical Resistance Factor (<math> \phi_{stat}</math>) and Driving Resistance Factor (<math> \phi_{dyn}</math>), LRFD Table 10.5.5.2.3-1===
  
For HP piles, pile point reinforcement is always required when HP piles are anticipated to be driven to rock and proofed. However, driving HP piles through overburden not likely to impede driving to deep rock or preboring to rock for setting piles are two situations that could be considered as less than severe. Further, driving any steel pile through soil without rubble, boulders, cobbles or very dense gravel could be considered good driving conditions for determination of structural resistance factor. Consult the Structural Project Manager or Structural Liaison Engineer.
+
The factors for Geotechnical Resistance (<math> \phi_{stat}</math>) and Driving Resistance (<math> \phi_{dyn}</math>) will usually be different because of the different methods used to determine the nominal bearing resistance. Caution should be used if the difference in factors for Geotechnical Resistance and Driving Resistance are great as it can lead to issues with pile overruns. Also see [[#751.36.5.9 Estimate Pile Length and Check Pile Capacity|EPG 751.36.5.9]].
:Metal Shells - 0.70
 
:H-Piles - 0.60
 
  
Pile structural resistance factor for combined axial and flexural resistance of undamaged piles:
+
'''Geotechnical Resistance Factor, <math> \phi_{stat}</math>:'''
:Axial resistance factor for H-Piles - 0.70
 
:Axial resistance for Metal Shells - 0.80
 
:Flexural resistance factor for H-Piles or Metal Shells - 1.00
 
  
 +
The Geotechnical Resistance factor is based on the static method used by the designer in determining the nominal bearing resistance.  Unlike the Driving Resistance factor the Geotechnical Resistance factor can vary with the soil layers.  If Geotechnical Resistance factors are not provided by the Geotechnical Engineer, values may be selected from LRFD Table 10.5.5.2.3-1.  For Extreme Event Limit States see LRFD 10.5.5.3.
  
'''Resistance Factor for Geotechnical Strength <math>\, (\phi_G )</math>'''
+
'''Driving Resistance Factor, <math> \phi_{dyn}</math>:'''
  
The Geotechnical Resistance factor is dependent on method of pile driving acceptance criteria during Construction.
+
The Driving Resistance factor shall be selected from LRFD Table 10.5.5.2.3-1 based on the method to be used in the field during construction to verify nominal axial compressive resistance.  
  
:{|
+
<center>
|width="300pt"|Method ||<math>\, \phi_G</math>
+
{|border="1" style="text-align:center;" cellpadding="5" align="center"  cellspacing="0"
 +
!Method!!Resistance Factor,<br/><math> \phi_{dyn}</math>
 +
|-
 +
|FHWA-modified Gates Dynamic Pile Formula<br/>(End of Drive condition only)||0.40
 
|-
 
|-
|FHWA-modified Gates Dynamic  Formula||0.40
+
|Wave Equation Analysis||0.50
 
|-
 
|-
 
|Dynamic Testing on 1 to 10% piles||0.65
 
|Dynamic Testing on 1 to 10% piles||0.65
 
|-
 
|-
|Other methods||Refer to AASHTO
+
|Other methods||Refer to LRFD Table 10.5.5.2.3-1
 
|}
 
|}
 +
</center>
  
Use dynamic pile testing on all jobs where any-sized HP piling is driven to shallow rock which is defined as rock up to 30 ft. - 35 ft. below ground. This requirement shall apply to any type of rock meaning weak to strong rock including stronger shales where HP piling is anticipated to meet refusal. Use EPG 751.50 Standard Detailing Notes [[751.50 Standard Detailing Notes#(E2.22) (Use the following note|E2.22]] and [[751.50 Standard Detailing Notes#(G7.4) (Use the following note|G7.3]] on plans as required.
+
Use [http://epg.modot.org/index.php/751.50_Standard_Detailing_Notes#G7._Steel_HP_Pile EPG 751.50 Standard Detailing Note G7.3] on plans as required. This requirement shall apply to any type of rock meaning weak to strong rock including stronger shales where HP piling is anticipated to meet refusal.  
 
 
FHWA-modified Gates Dynamic Formula is not considered accurate for pile loading exceeding 600 kips Nominal Axial Compressive Resistance. When pile loading exceeds 600 kips, use wave equation analysis and geotechnical resistance factor of 0.50.
 
 
 
See Structural Project Manager or Liaison for use of Pile Dynamic Testing. Dynamic Testing is recommended for projects with friction piles and when HP piling is driven to shallow rock.  
 
  
 +
FHWA-modified Gates Dynamic Pile Formula is not considered accurate for pile loading (Minimum Nominal Axial Compressive Resistance) exceeding 600 kips. When pile loading exceeds 600 kips, use wave equation analysis, dynamic testing or other method.
 +
 +
Dynamic Testing is recommended for projects with friction piles.
  
'''Downdrag & Losses to Geotechnical Strength (kips)'''
+
===751.36.5.4 Downdrag and Losses to Geotechnical Resistance due to Scour and Liquefaction (kips), LRFD 10.7.3.6, 10.7.3.7, and AASHTO Guide Specifications for LRFD Seismic Bridge Design (SGS) 6.8===
  
 
Downdrag, liquefaction and scour all reduce the available skin friction capacity of piles.  Downdrag <math>\, (DD)</math> is unique because it not only causes a loss of capacity, but also applies a downward force to the piles.  This is usually attributed to embankment settlement.  However, downdrag can also be caused by a non-liquefied layer overlying a liquefied layer.  Review geotechnical report for downdrag and liquefaction information.
 
Downdrag, liquefaction and scour all reduce the available skin friction capacity of piles.  Downdrag <math>\, (DD)</math> is unique because it not only causes a loss of capacity, but also applies a downward force to the piles.  This is usually attributed to embankment settlement.  However, downdrag can also be caused by a non-liquefied layer overlying a liquefied layer.  Review geotechnical report for downdrag and liquefaction information.
  
 +
===751.36.5.5 Preliminary Structural Nominal Axial Design Capacity (PNDC) of an individual pile (kips)===
  
'''Preliminary Structural Nominal Axial Design Capacity (PNDC) of an individual pile (kips)'''
+
The PNDC equations provided herein assume the piles are continually braced. This assumption is applicable for the portion of piling below ground or confined by solid wall encasement. If designing a pile bent structure, scour exists or liquefaction exists then the pile shall be checked considering the appropriate unbraced length.
  
The PNDC were calculated with the assumption that the piles are continually braced.  This includes the portion of piling that is below ground or confined by solid wall encasement.  For portions of piling that are not continually braced, the PNDC must be calculated taking the unbraced length into account.
+
'''Structural Steel HP Piles'''
  
 +
:<math>\, PNDC = 0.66^\lambda F_y A_S</math>
  
'''Steel Piles'''
+
:Since we are assuming the piles are continuously braced, then <math>\,\lambda</math>= 0.
  
<math>\, PNDC = 0.66^\lambda F_y A_S</math>
+
:{|
 
 
Since we are assuming the piles are continuously braced, then <math>\,\lambda = 0</math>.
 
If designing a pile bent structure, scour exists or liquefaction exists then pile shall be checked considering the appropriate unbraced length.
 
 
 
{|
 
 
|<math>\, F_y</math>||is the yield strength of the pile
 
|<math>\, F_y</math>||is the yield strength of the pile
 
|-
 
|-
|<math>\, A_S</math>||is the pile area of steel
+
|<math>\, A_S</math>||is the area of the steel pile
 
|}
 
|}
  
 +
'''Welded or Seamless Steel Shell (Pipe) Cast-In-Place Piles (CIP Piles)'''
  
'''Shell Cast In Place Piles (CIP Piles)'''
+
:<math>\, PNDC = 0.85 f'_c Ac+F_y A_{st}</math>
  
<math>\, PNDC = 0.85 f'_c Ac+F_y A_{st}</math>
+
:{|
 
 
{|
 
 
|<math>\, F_y</math>||is the yield strength of the pipe pile
 
|<math>\, F_y</math>||is the yield strength of the pipe pile
 
|-
 
|-
Line 255: Line 346:
 
|}
 
|}
  
Maximum Load during pile driving = <math>\, 0.90 (f_y A_{st})</math>
+
:Maximum Load during pile driving = <math>\, 0.90 (f_y A_{st})</math>
 +
 
 +
Welded or Seamless Steel Shell shall be ASTM 252 Grade 3 (45 ksi). ASTM 252 states “the wall thickness at any point shall not be more than 12.5% under the specified nominal wall thickness.” AASHTO recommends deducting 1/16” of the wall thickness due to corrosion (LRFD 5.13.4.5.2). Corrosion need not be considered at construction stage and for drivability analysis and driven analysis. For drivability analysis and driven analysis deduct 12.5% of specified nominal wall thickness (ASTM A252). For structural design deduct 12.5 % (ASTM A252) and 1/16” for corrosion (LRFD 5.13.4.5.2) from specified nominal wall thickness.
 +
 
 +
===751.36.5.6 Preliminary Factored Axial Design Capacity (PFDC) of an Individual Pile (kips)===
  
Steel Shell is ASTM 252 Grade 2 (35 ksi) or Grade 3 (45 ksi).  ASTM 252 allows “the wall thickness at any point shall not be more than 12.5% under the specified nominal wall thickness.”  AASHTO recommends deducting 1/16” of the wall thickness due to corrosion.  Area of steel shell used in design equations should deduct 12.5% and 1/16” where applicable.
+
:PFDC = Structural Factored Axial Compressive Resistance – Factored Downdrag Load
  
 +
===751.36.5.7 Design Values for Steel Pile===
 +
====751.36.5.7.1 Design Values for Individual HP Pile====
  
 +
<center>'''Design Values for HP Pile'''
 +
F<sub>y</sub> = 50 ksi. End Bearing Piles (HP piles) anticipated to be driven to rock.
 
{|border="1" style="text-align:center;" cellpadding="5" align="center"  cellspacing="0"
 
{|border="1" style="text-align:center;" cellpadding="5" align="center"  cellspacing="0"
|+'''Steel HP Piles'''
+
!Pile Size!!A<sub>s</sub><br/>Area,<br/>sq. in.!!Structural<br/>Nominal<br/>Axial<br/>Compressive<br/>Resistance<br/>PNDC<sup>1,2</sup>,<br/>kips!!Φ<sub>c</sub><br/>Structural<br/>Resistance<br/>Factor<sup>4</sup>,<br/>LRFD 6.5.4.2!!Structural<br/>Factored<br/>Axial<br/>Compressive<br/>Resistance<sup>2,3,4</sup>,<br/>kips!!0.9*ϕ<sub>da</sub>*F<sub>y</sub><br/>Maximum<br/>Nominal<br/>Driving<br/>Stress,<br/>LRFD 10.7.8,<br/>ksi
|rowspan="2"|Section||rowspan="2"|Area||Structural Nominal<br/>Compression Resistance||Structural Factored <math>\, ( \phi = 0.5)</math><br/>Compression resistance
 
|-
 
|<math>\, F_y = 50 ksi</math><br/>(kips)||<math>\, F_y = 50 ksi</math><br/>(kips)
 
 
|-
 
|-
|width="75pt"|HP 10x42||width="75pt"|12.4||width="100pt"|620||width="100pt"|310
+
|HP 12x53|| 15.5|| 775|| 0.5|| 388|| 45.00
 
|-
 
|-
|HP 12x53||15.5||775||380
+
|HP 14x73|| 21.4|| 1070|| 0.5|| 535|| 45.00
 
|-
 
|-
|HP 14x73||21.4||1070||535
+
|colspan="6" align="left"|'''<sup>1</sup>''' Structural Nominal Axial Compressive Resistance for fully embedded piles only. Structural Nominal Axial Compressive Resistance for unsupported piles shall be determined in accordance with LRFD 10.7.3.13.1. (i.e., intermediate pile cap bent).<br/><br/>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;Minimum Nominal Axial Compressive Resistance  =  Required nominal driving resistance, R<sub>ndr</sub><br/>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; = (Maximum factored axial loads / ϕ<sub>dyn</sub>) ≤ Structural nominal axial compressive resistance, PNDC &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;LRFD 10.5.5.2.3<br/><br/>
 +
'''<sup>2</sup>''' Axial Compressive Resistance values shown above shall be reduced when  downdrag is considered
 +
<br/><br/>'''<sup>3</sup>''' Maximum factored axial load per pile  ≤  Structural factored axial compressive resistance.
 +
<br/><br/>'''<sup>4</sup>''' Values are applicable for Strength Limit States.  Modify value for other Limit States.
 +
<br/><br/><br/>'''Notes:
 +
<br/><br/>ϕ<sub>dyn</sub> = Resistance factor of the dynamic method to be used to estimate nominal pile resistance during pile installation.&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; LRFD Table 10.5.5.2.3-1
 +
<br/><br/>When Minimum Nominal Axial Compressive Resistance exceeds 600 kips do not use FHWA-modified Gates Dynamic Formula for field verification. Use Dynamic testing, Wave equation analysis or other method.
 +
<br/><br/>Drivability analysis shall be performed for all HP piles using Delmag D19-42 and  Delmag D30-23 (Heavy Hammer).  Do not show minimum hammer energy on plans.
 +
<br/><br/>Check drivability for all HP Pile in accordance with [[#751.36.5.11 Check Pile Drivability|EPG 751.36.5.11]]
 +
<br/><br/>For additional design requirements, see [[#751.36.5.1 Design Procedure Outline|EPG 751.36.5.1]].
 
|}
 
|}
 +
</center>
  
 +
====751.36.5.7.2 Design Values for Individual Cast-In-Place (CIP) Pile====
  
{|border="1" style="text-align:center;" cellpadding="3" align="center" cellspacing="0"
+
<center>'''Design Values for Closed-Ended CIP Pile  '''
|+'''CIP Piles'''
+
Grade 3 F<sub>y</sub> = 45 ksi; F'<sub>c</sub> = 4 ksi; Structural Resistance Factor, (Φ<sub>c</sub>)<sup>'''1'''</sup> = 0.6
|rowspan="2"|Diameter
+
{|border="1" style="text-align:center;" cellpadding="5" align="center" cellspacing="0"
|rowspan="2"|Wall Thickness
+
!colspan="8"|Unfilled Pipe For Axial Analysis<sup>2</sup>!!colspan="5"|Concrete Filled Pipe For Flexural Analysis<sup>3</sup>
|<math>\, A_s - 12.5%</math>
+
|-
|width="100"|Maximum Driving Resistance Allowed<br><math>F_y = 35 ksi</math>
+
!Pile Outside Diameter O.D., in. !!Pile Inside Diameter I.D., in. !!Minimum Wall Thickness,<br/>in. !!Reduced Wall thick. for Fabrication (ASTM 252),<br/>in. !!A<sub>s</sub>,<sup>4</sup><br/>Area of Steel Pipe,<br/>sq. in.!!Structural Nominal Axial Compressive Resistance, P<sub>n</sub><sup>5,6,7,8</sup>,<br/>kips !!Structural Factored Axial Compressive Resistance<sup>1,8,9</sup>,<br/>kips !!0.9*ϕ<sub>da</sub>*F<sub>y</sub>*A<sub>s</sub><br/>Maximum<br/>Nominal<br/>Driving<br/>Resistance<sup>6,7</sup>,<br/>LRFD 10.7.8,<br/>kips !!Reduced Wall Thick. for Corrosion (1/16"), LRFD 5.13.4.5.2,<br/>in. !!A<sub>st</sub>,<sup>10</sup> Net Area of Steel Pipe,<br/>sq. in.!!A<sub>c</sub> Concrete Area,<br/>sq. in. !!Structural Nominal Axial Compressive Resistance PNDC<sup>5,8,11</sup>,<br/>kips!!Structural Factored Axial Compressive Resistance<sup>1,8,11</sup>,<br/>kips
|width="150"| <math>\, A_s</math> - (12.5% & 1/16")  
+
|-
|width="100"|Structural Nominal Axial Compressive Resistance<br/><math>\, F_y = 35 ksi</math> & <math>\, f'_c = 4 ksi</math>  
+
|rowspan="4"|14|| 13.5|| 0.25|| 0.22|| 9.43|| 424|| 255|| 382|| 0.156|| 6.70|| 143|| 788||473
|width="100"|Structural Factored <math>(\, \phi = 0.6)</math> Axial Compressive Resistance<br/><math>\, F_y = 35 ksi</math> & <math>\, f'_c = 4 ksi</math>  
+
|-
 +
|13.25||0.375|| 0.33|| 14.00|| 630|| 378|| 567|| 0.266|| 11.28|| 138|| 976|| 586
 +
|-
 +
|13|| 0.5|| 0.44|| 18.47|| 831|| 499|| 748|| 0.375|| 15.76|| 133|| 1160|| 696
 +
|-
 +
|12.75||0.625<sup>'''12'''</sup>|| 0.55|| 22.84|| 1028|| 617|| 925|| 0.484|| 20.14|| 128|| 1340|| 804
 +
|-
 +
|rowspan="4"|16||15.5||0.25|| 0.22|| 10.80|| 486|| 292|| 437|| 0.156|| 7.69|| 189|| 987|| 592
 +
|-
 +
|15.2|| 0.375|| 0.33|| 16.06|| 723|| 434|| 650|| 0.266|| 12.95|| 183|| 1204|| 722
 +
|-
 +
|15|| 0.5|| 0.44|| 21.22|| 955|| 573|| 859|| 0.375|| 18.11 ||177|| 1416|| 850
 +
|-
 +
|14.75||0.625<sup>'''12'''</sup>|| 0.55|| 26.28|| 1183|| 710|| 1064|| 0.484|| 23.18|| 171|| 1624|| 975
 +
|-
 +
|rowspan="4"|20||19.5|| 0.25|| 0.22|| 13.55|| 610|| 366|| 549|| 0.156|| 9.65|| 299|| 1450|| 870
 +
|-
 +
|19.25||0.375|| 0.33|| 20.18|| 908|| 545|| 817|| 0.266|| 16.29|| 291|| 1722|| 1033
 +
|-
 +
|19 ||0.5|| 0.44|| 26.72|| 1202|| 721|| 1082 ||0.375|| 22.83|| 284|| 1991|| 1195
 +
|-
 +
|18.75||0.625|| 0.55|| 33.15|| 1492|| 895|| 1343|| 0.484|| 29.27|| 276|| 2256|| 1354
 +
|-
 +
|rowspan="4"|24||23.25||0.375|| 0.33|| 24.31|| 1094|| 656|| 984|| 0.266|| 19.62|| 425|| 2327|| 1396
 +
|-
 +
|23|| 0.5|| 0.44|| 32.21|| 1450|| 870|| 1305|| 0.375|| 27.54|| 415|| 2652|| 1591
 
|-
 
|-
|in.<sup>2</sup>
+
|22.75||0.625|| 0.55|| 40.03|| 1801|| 1081|| 1621|| 0.484|| 35.36|| 406|| 2973|| 1784
|kips
 
|in<sup>2</sup>
 
|kips
 
|kips
 
 
|-
 
|-
|14||0.25||9.47||300||6.79||720||430
+
|22.5 ||0.75||0.66|| 47.74|| 2148|| 1289|| 1933|| 0.594|| 43.08|| 398|| 3290|| 1974
 
|-
 
|-
|16||0.375||16.15||500||13.12||1075||645
+
|colspan="13" align="left"|'''<sup>1</sup>''' Values are applicable for Strength Limit States.  Modify value for other Limit States.
|}
+
<br/>'''<sup>2</sup>''' Use to determine preliminary number of pile and pile size.
 
+
<br/><br/>'''<sup>3</sup>''' Pipes placed in prebored holes on rock can use filled pipe capacity for axial plus flexural resistance. Therefore, number of piles should be based on this capacity assuming rock is infinitely more stiff.
 
+
<br/><br/>'''<sup>4</sup>''' Corrosion NOT considered at construction stage and for drivability analysis and driven analysis. For drivability analysis and driven analysis use reduced pipe nominal wall thickness, 12.5%, for fabrication (ASTM A252).
'''Preliminary Factored Nominal Resistance (PFDC) of an Individual Pile (kips)'''
+
<br/><br/>'''<sup>5</sup>''' Structural Nominal Axial compressive resistance for fully embedded piles only.  Value in table is a raw number and is the value used to determine the factored resistance. Structural Nominal Axial Compressive Resistance for unsupported piles shall be determined in accordance with LRFD 10.7.3.13.1. (i.e. Intermediate pile cap bent).
 
+
<br/><br/>'''<sup>6</sup>''' Structural nominal axial compressive resistance  ≤  Maximum nominal driving resistance
<math>\, PFDC</math> = Factored Structural Nominal Resistance – Factored Nominal Downdrag Load
+
<br/><br/>'''<sup>7</sup>''' Minimum Nominal Axial Compressive Resistance  =  Required nominal driving resistance, R<sub>ndr</sub><br/>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; =  Maximum factored axial loads  / ϕ<sub>dyn</sub> ≤  Structural nominal axial compressive resistance, P<sub>n</sub> and &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;LRFD 10.5.5.2.3<br/>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;≤ Maximum nominal driving resistance.
 
+
<br/><br/>'''<sup>8</sup>''' Axial Compressive Resistance values shown above shall be reduced when  downdrag is considered
 +
<br/><br/>'''<sup>9</sup>''' Maximum factored axial load per pile  ≤  Structural factored axial compressive resistance
 +
<br/><br/>'''<sup>10</sup>''' Net area of steel pipe, A<sub>st</sub>, assumes a 12.5% fabrication reduction (ASTM A252) and 1/16" (LRFD 5.13.4.5.2) reduction in pipe nominal wall thickness for corrosion.
 +
<br/><br/>'''<sup>11</sup>''' Use for lateral load analysis. Resistance value includes filled pipe based on net area of steel pipe, A<sub>st</sub> (12.5% fab. reduction and 1/16” corr. reduction in nominal pipe wall thickness).
 +
<br/><br/>'''<sup>12</sup>''' 5/8” wall thickness is less commonly available than the smaller wall thicknesses of pipe pile.
 +
<br/><br/><br/>'''Notes:
 +
<br/><br/>Drivability analysis shall be performed for all CIP piles (unfilled pipe) using Delmag D19-42 and Delmag D30-23 (Heavy Hammer). Do not show minimum hammer energy on plans.
 +
<br/><br/>Check drivability for all CIP Pile in accordance with [[#751.36.5.11 Check Pile Drivability|EPG 751.36.5.11]].
 +
<br/><br/>Require dynamic pile testing for field verification for all CIP piles on the plans.
 +
<br/><br/>ϕ<sub>dyn</sub> = 0.65 = Dynamic Testing resistance factor to be used to estimate nominal pile resistance during pile installation. This value may be increased if static load testing is specified per LRFD Table 10.5.5.2.3-1. <br/><br/>For additional design requirements, see [[#751.36.5.1 Design Procedure Outline|EPG 751.36.5.1]].
 +
|}
 +
</center>
  
 +
===751.36.5.8 Additional Provisions for Pile Cap Footings===
 
'''Pile Group Layout:'''
 
'''Pile Group Layout:'''
  
Line 307: Line 447:
 
Layout a pile group that will satisfy the preliminary number of piles required.  Calculate the maximum and minimum factored load applied to the outside corner piles assuming the pile cap/footing is perfectly rigid.  The general equation is as follows:
 
Layout a pile group that will satisfy the preliminary number of piles required.  Calculate the maximum and minimum factored load applied to the outside corner piles assuming the pile cap/footing is perfectly rigid.  The general equation is as follows:
  
Max. Load = &nbsp; <math>\, \frac {P}{Total\ No.\ of\ Piles} + \frac {M_x}{I_x} x + \frac {M_y}{I_y} y</math>
+
Max. Load = &nbsp; <math>\, \frac {P}{Total\ No.\ of\ Piles} + \frac {M_x Y_i}{\Sigma Y_i^2} + \frac {M_y X_i}{\Sigma X_i^2}</math>
  
Min. Load = &nbsp; <math>\, \frac {P}{Total\ No.\ of\ Piles} - \frac {M_x}{I_x} x - \frac {M_y}{I_y} y</math>
+
Min. Load = &nbsp; <math>\, \frac {P}{Total\ No.\ of\ Piles} - \frac {M_x Y_i}{\Sigma Y_i^2} - \frac {M_y X_i}{\Sigma X_i^2}</math>
  
 
The maximum factored load per pile must be less than or equal to PFDC for the pile type and size chosen.  If not, the pile size must be increased or additional piles must be added to the pile group.  Reanalyze until the pile type, size and layout are satisfactory.
 
The maximum factored load per pile must be less than or equal to PFDC for the pile type and size chosen.  If not, the pile size must be increased or additional piles must be added to the pile group.  Reanalyze until the pile type, size and layout are satisfactory.
Line 315: Line 455:
 
The minimum factored load per pile should preferably be greater than zero.  If this cannot be practically satisfied, the factored pullout resistance of the pile shall be calculated.
 
The minimum factored load per pile should preferably be greater than zero.  If this cannot be practically satisfied, the factored pullout resistance of the pile shall be calculated.
  
 +
'''Resistance of Pile Groups in Compression'''&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;'''LRFD 10.7.3.9'''
 +
 +
If the cap is not in firm contact with the ground and if the soil at the surface is soft, the individual nominal resistance of each pile (751.36.5.5) shall be multiplied by an efficiency factor, <math>\eta</math>, based on pile spacing.
 +
 +
===751.36.5.9 Estimate Pile Length and Check Pile Capacity===
 +
 +
====751.36.5.9.1 Estimated Pile Length====
 +
 +
'''Friction Piles:'''
 +
 +
Estimate the pile length required to achieve the minimum nominal axial compressive resistance, R<sub>ndr</sub>, for establishment of contract pile quantities. Perform a static analysis to determine the nominal resistance profile of the soil.  For each soil layer the appropriate resistance factor, ϕ<sub>stat</sub>, shall be applied to account for the reliability of the static analysis method chosen in order to create a factored resistance profile.  The penetration depth would then occur at the location where the factored resistance profile intercepts the factored load. Similarly, for a uniform soil layer the adjusted nominal resistance, R<sub>nstat</sub>, can be determined from the equation below.
 +
:{| style="margin: 1em auto 1em auto"
 +
|-
 +
|ϕ<sub>dyn</sub> x R<sub>ndr</sub> = ϕ<sub>stat</sub> x R<sub>nstat</sub> ≥ Factored Load||width="450"| ||LRFD C10.7.3.3-1
 +
|}
 +
 +
Where:
 +
:ϕ<sub>dyn</sub> = see [[#751.36.5.3 Geotechnical Resistance|EPG.751.36.5.3]]
 +
:R<sub>ndr</sub> = Minimum nominal axial compressive resistance = Required nominal driving resistance
 +
:ϕ<sub>stat</sub> = Static analysis resistance factor per LRFD Table 10.5.5.2.3-1 or as provided by the Geotechnical Engineer.  Factors for side friction and end bearing may be different.
 +
:R<sub>nstat</sub> = Adjusted Nominal resistance due to static analysis reliability
 +
 +
Use soil profiles from borings and mimic soil characteristics as closely as possible in computations or software to calculate the geotechnical resistance and for estimating the length of pile.
 +
 +
It is not advisable to design pile deeper than available borings or to reach capacity within the bottom 3 to 5 feet of borings. If a longer pile depth is needed to meet design requirements then request Geotechnical Section to provide deeper borings or increase the number of piles which will reduce load per pile as well as the required pile length.
 +
 +
For friction pile the top five feet of soil friction resistance may be neglected with SPM or SLE approval for possible disturbance from MSE wall excavation prior to driving pile.
  
'''Estimate Pile Length and Check Pile Capacity'''
+
'''End Bearing Piles:'''
  
'''Estimated Pile Length'''
+
The estimated pile length is the distance along the pile from the cut-off elevation to the estimated tip elevation considering any penetration into rock. The estimated tip elevation shall not be shown on plans for end bearing piles.
  
:Friction Piles:
+
The geotechnical material above the estimated end bearing tip elevation shall be reviewed to review the presence of glacial till or similar layers exist. If these layers are present, then a static analysis shall be performed to verify if the required pile resistance is reached at a higher elevation due to pile friction capacity.
::The estimated pile length will be determined from Pile Soil Interaction (DRIVEN) Analysis. The factor of safety used for this analysis shall be discussed with the appropriate Structural Project Manager or Structural Liaison.
 
  
:End Bearing Piles:
+
====751.36.5.9.2 Check Pile Geotechnical Capacity (Axial Loads Only)====
::The estimated pile length is the distance along the pile from the cut-off elevation to the estimated tip elevation considering any penetration into rock. The estimated tip elevation shall not be shown on plans for end bearing piles.
 
  
::The geotechnical material above the estimated end bearing tip elevation shall be reviewed to review the presence of glacial till or similar layers exist. If these layers are present, then a Pile Soil Interaction (DRIVEN) Analysis shall be performed to verify if pile resistance capacity is reached at a higher elevation due to pile friction capacity.
+
Use the same methodology outlined in [[#751.36.5.9 Estimate Pile Length and Check Pile Capacity|EPG 751.36.5.9 Estimate Pile Length and Check Pile Capacity]].
  
 +
====751.36.5.9.3 Check Pile Structural Capacity (Combined Axial and Bending)====
  
'''Check Pile Geotechnical Capacity (Axial Loads Only)'''
+
Structural design checks which include lateral loading and bending shall be accomplished using the appropriate structural resistance factors.
  
 +
===751.36.5.10 Pile Nominal Axial Compressive Resistance (kips)===
  
'''Check Pile Structural Capacity (Combined Axial and Bending)'''
+
The minimum nominal axial compressive resistance, R<sub>ndr</sub>, must be calculated and shown on the final plans. The factored axial compressive resistance will be used to verify the pile group layout and loading. The minimum nominal axial compressive resistance will be used in construction field verification methods to obtain the required nominal driving resistance.
  
Structural design checks which include lateral loading and bending shall be accomplished using the appropriate resistance factors.
+
:Minimum Nominal Axial Compressive Resistance = Required Nominal Driving Resistance, 
 +
::::::::::::::: = Maximum factored axial loads/ϕ<sub>dyn</sub>
  
 +
:ϕ<sub>dyn</sub> = Resistance factor of the dynamic method to be used to estimate nominal pile resistance during pile installation. LRFD 10.5.5.2.3.1
  
'''Pile Nominal Axial Compressive Resistance (kips)'''
+
The value of Rndr shown on the plans shall be the greater of the value required at the Strength limit state and Extreme Event limit state.  This value shall not be greater than the structural nominal axial compressive resistance of the pile nor shall it exceed the maximum nominal driving resistance of the steel shell for CIP piles.  See [[#751.36.5.5 Preliminary Structural Nominal Axial Design Capacity (PNDC) of an individual pile (kips)|EPG 751.36.5.5]].&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;           LRFD 10.7.7
  
The required nominal axial pile compressive resistance must be calculated and shown on the final plans. The factored nominal compressive resistance will be used to verify the pile group layout and loading. The required nominal axial pile compressive resistance will be used in construction field verification methods of nominal axial compressive pile resistance.
+
===751.36.5.11 Check Pile Drivability===
  
Factored Nominal Resistance <math>\, (FNR)</math> = Maximum Factored Load per Pile
+
Drivability of the pile through the soil profile can be investigated using “GRLWEAP” program or other available software. Designers may import soil resistances from a static analysis programor input soil values directly into GRLWEAP program to perform drivability.
 +
 +
If soil values are to be directly input into GRLWEAP program, enter in values of sand and clay layers with specific values of cohesion or internal friction angle or just by uncorrected blow count values obtained from borings.
  
Nominal Axial Compressive Resistance <math>\, (Rndr)</math>
+
Drivability analysis shall be performed for all piles (bearing pile and friction pile) using the Delmag D19-42 hammer and the Delmag D30-23 – Heavy Hammer.
  
<math>Rndr = \frac{Factored\ Nominal\ Resistance}{\phi_G}</math>
+
Use soil profiles from borings and mimic soil characteristics as closely as possible for computations or in software to perform drivability analysis of any kind of pile.
  
 +
'''Structural steel HP Pile:'''
  
'''Check Pile Drivability'''
+
Drivability analysis shall be performed for two cases:
 +
:1. Box shape
 +
:2. Perimeter
  
Practical refusal is defined at 20 blows/inch.
+
Drivability shall be performed considering existing condition without considering any excavation/ disturbance (i.e., possible disturbance to top 5 feet of soil from MSE wall excavation prior to driving pile), liquefaction or future scour loss.
  
Driving should be terminated immediately once 30 blows/inch is encountered.
+
'''Hammer types:'''
 +
<center>'''Pile Driving Hammer Information For GRLWEAP'''
 +
{|border="1" style="text-align:center;" cellpadding="5" align="center"  cellspacing="0"
 +
!colspan="3"|Hammer used in the field per survey response (2017)
 +
|-
 +
!GRLWEAP ID!!Hammer name!!No. of Responses
 +
|-
 +
|41||Delmag D19-42<sup>1</sup>|| 13
 +
|-
 +
|40||Delmag D19-32 || 6
 +
|-
 +
|38||Delmag D12-42  || 4
 +
|-
 +
|139||ICE 32S ||4
 +
|-
 +
|15||Delmag D30-32|| 2
 +
|-
 +
| ||Delmag D25-32 ||2
 +
|-
 +
|127||ICE 30S|| 1
 +
|-
 +
|150||MKT DE-30B|| 1
 +
|-
 +
|colspan="3"|<sup>'''1</sup>''' Delmag series of pile hammers is the most popular, with the D19-42 being the most widely used.
 +
|}
 +
</center>
 +
'''Hammer usage in the field will be surveyed every five years. The above results will be revised according to the new survey and the most widely used hammer will be selected for drivability analysis.'''
  
If analysis indicated the piles do not have sufficient structural or geotechnical strength or drivability issues exist then consider
+
The contractor is responsible for determining the hammer energy required to successfully drive the pile to the minimum tip elevation and to reach the minimum nominal axial compressive resistance specified on the plans. The contractor shall perform a drivability analysis to select an appropriate hammer size to ensure the pile can be driven without overstressing the pile and to prevent refusal of the pile prior to reaching the minimum tip elevation.  The contractor shall plan pile driving activities and submit hammer energy requirements to the engineer for approval before driving. 
*increasing the number of piles
 
*using higher strength piles
 
  
 +
Practical refusal is defined at 20 blows/inch or 240 blows per foot. 
  
'''Information to be included on the Plans'''
+
Driving should be terminated immediately once 30 blows/inch is encountered.
 +
 
 +
:{| style="margin: 1em auto 1em auto"
 +
|-
 +
|Nominal Driving Stress||width="640"| ||LRFD 10.7.8
 +
|}
 +
:Nominal driving stress ≤ 0.9*ϕ<sub>da</sub>*F<sub>y</sub>
 +
::For structural steel HP pile, Maximum nominal driving stress = 45 ksi
 +
::For CIP pile, Maximum nominal driving resistance, see [[#751.36.5.7.2 Design Values for Individual Cast-In-Place (CIP) Pile|EPG 751.36.5.7.2]] (unfilled pipe for axial analysis).
 +
 +
If analysis indicates the piles do not have sufficient structural or geotechnical strength or drivability issues exist then consider increasing the number of piles.
  
 +
===751.36.5.12 Information to be Included on the Plans===
 +
 
See [http://epg.modot.org/index.php?title=751.50_Standard_Detailing_Notes#A1._Design_Specifications.2C_Loadings_.26_Unit_Stresses EPG 751.50 A1 Design Specifications, Loadings & Unit Stresses] for appropriate design stresses to be included in the general notes.
 
See [http://epg.modot.org/index.php?title=751.50_Standard_Detailing_Notes#A1._Design_Specifications.2C_Loadings_.26_Unit_Stresses EPG 751.50 A1 Design Specifications, Loadings & Unit Stresses] for appropriate design stresses to be included in the general notes.
  
See [http://epg.modot.org/index.php?title=751.50_Standard_Detailing_Notes#E2._Foundation_Data_Table EPG 751.50 E2 Foundation Data Table] for appropriate data to be included in the foundation data table and any additional notes required below the table.
+
See [http://epg.modot.org/index.php?title=751.50_Standard_Detailing_Notes#E2._Foundation_Data_Table EPG 751.50 E2 Foundation Data Table] for appropriate data to be included in the foundation data table for HP pile and CIP pile and any additional notes required below the table. See [https://www.modot.org/pile-pile  Bridge Standard Drawings “Pile”] for CIP data table.
  
  
  
 
[[Category:751 LRFD Bridge Design Guidelines]]
 
[[Category:751 LRFD Bridge Design Guidelines]]

Revision as of 09:45, 17 May 2019

Main Page July 17, 2013.jpg

Contents

751.36.1 General

Accuracy Required

All capacities shall be taken to the nearest 1 (one) kip, loads shown on plans.

751.36.1.1 Maximum Specified Pile Lengths

Structural Steel Pile No Limit
Cast-In-Place (CIP) (Welded or Seamless Steel Shell (Pipe)) Pile No Limit

It is not advisable to design pile deeper than borings. If longer pile depth is required to meet design requirements, then request Geotechnical Section to provide deeper borings or increase the number of piles which will reduce load per pile as well as required pile length.

751.36.1.2 Probe Pile

Asset Management
Report 2009
See also: Innovation Library

Length shall be estimated pile length + 10’.

When probe piles are specified to be driven-in-place they shall not be included in the number of piles indicated in the “FOUNDATION DATA” Table.

751.36.1.3 Static Load Test Pile

When Static Load Test Pile is specified, the nominal axial compressive resistance value shall be determined by an actual static load test.

For preboring for piles see Sec 702.

751.36.1.4 Preliminary Geotechnical Report Information

The foundation can be more economically designed with increased geotechnical information about the specific project site.

Soil information should be reviewed for rock or refusal elevations. Auger hole information and rock or refusal data are sufficient for piles founded on rock material to indicate length of piling estimated. Standard Penetration Test information is especially desirable at each bent if friction piles are utilized or the depth of rock exceeds approximately 60 feet.

751.36.1.5 Geotechnical Redundancy

Pile Nonredundancy (20 percent resistance factor reduction)

Conventional bridge pile foundations:

For pile cap footings where a small pile group is defined as less than 5 piles, reduce pile geotechnical and structural resistance factors shown in LRFD Table 10.5.5.2.3-1.

For pile cap bents, the small pile group definition of less than 5 piles is debatable in terms of nonredundancy and applying a resistance factor reduction. The notion of a bridge collapse or a pile cap bent failure directly related to the failure of a single pile or due to its pile arrangement in this instance, or ignoring the strength contribution of the superstructure via diaphragms in some cases would seem to challenge applying the small pile group concept to pile bent systems as developed in NCHRP 508 and alluded to in the LRFD commentary. In terms of reliability, application of this factor could be utilized to account for exposed piling subject to indeterminable scour, erosion, debris loading or vehicular impact loadings as an increased factor of safety.

For integral and non-integral end bent cap piles, the reduction factor need not be considered for less than 5 piles due to the studied infrequency of abutment structural failures (NCHRP 458, p. 6) and statewide satisfactory historical performance.

For intermediate bent cap piles, the reduction factor need not be considered for less than 5 piles under normal design conditions. It may be considered for unaccountable loading conditions that may be outside the scope of accountable strength or extreme event limit state loading and is specific to a bridge site and application and is therefore utilized at the discretion of the Structural Project Manager or Structural Liaison Engineer. Further, if applied, it shall be utilized for determining pile length if applicable, lateral and horizontal geotechnical and structural resistances. Alternatively, a minimum of 5 piles may save consideration and cost.

Any substructure with a pile foundation can be checked for structural redundancy if necessary by performing structural analyses considering the hypothetical transference of loads to presumed surviving members of a substructure like columns or piles (load shedding). This direct analysis procedure could be performed in place of using a reduction factor for other than pile cap footings.

For nonconventional bridges like major bridges and major river and lake bridges, the application of pile redundancy may take a more strict direction. See the Structural Project Manager or Structural Liaison Engineer.

751.36.1.6 Waterjetting

Commentary on Waterjetting

Waterjetting is a method available to contractors to aid in driving piles. If the drivability analysis indicates difficulty driving piles then it can be assumed that the contractor may use waterjetting to aid in driving the piles. The Commentary on Waterjetting discusses items to consider when there is a possibility of the use of waterjetting.

751.36.1.7 Restrike

In general, designers should NOT require restrikes unless the Geotechnical Section requires restrike because it delays construction and makes it harder for contractors to estimate pile driving time on site. The Geotechnical Section shall show on borings data a statement indicating either "No Restrike Recommended" or "Restrike Recommended", with requirements.

751.36.2 Steel Pile

751.36.2.1 Material Properties

751.36.2.1.1 Structural Steel HP Pile

Structural Steel HP piling shall be ASTM A709 Grade 50S (fy = 50 ksi) steel.

751.36.2.1.2 Cast-In-Place (CIP) Pile

Welded or Seamless steel shell (Pipe) for CIP piling shall be ASTM 252 Grade 3

(fy = 45 ksi, Es = 29,000 ksi)

Concrete

Class B - 1 Concrete (Substructure) = 4.0 ksi

Modulus of elasticity,

Where:

f'c in ksi
wc = unit weight of nonreinforced concrete = 0.145 kcf
K1 = correction factor for source of aggregate
= 1.0 unless determined by physical testing

Reinforcing Steel

Minimum yield strength, = 60.0 ksi
Steel modulus of elasticity, = 29000 ksi

751.36.2.2 Steel Pile Type

Avoid multiple sizes and/or types of pilings on typical bridges (5 spans or less). Also using same size and type of pile on project helps with galvanizing.

There are two types of piles generally used by MoDOT. They are structural steel HP pile and close-ended pipe pile (cast-in-place, CIP). Open ended pipe pile (cast-in-place, CIP) can also be used. Structural steel piling are generally referred to as HP piling and two different standard AISC shapes are typically utilized: HP12 x 53 and HP14 x 73. Concrete piling are generally referred to as cast-in-place or CIP piling because the concrete is poured and cast in steel shells which are driven first or pre-driven.

751.36.2.2.1 Structural Steel HP Pile

HP Size
Section Area
HP 12 x 53 15.5 sq. in.
HP 14 x 73 21.4 sq. in.

The HP 12 x 53 section should generally be used unless a heavier section produces a more economical design or required by a Drivability Analysis.

751.36.2.2.2 Cast-In-Place (CIP) Pile

Cast-In-Place (CIP) (Welded or Seamless Steel Shell (Pipe)) Pile Size
Outside Diameter Minimum Nominal Wall
Thickness
Common Available Nominal Wall
Thicknesses
14 inch 1/4” 1/4”, 3/8”, 1/2” and 5/8”2
16 inch 1/4” 1/4”, 3/8”, 1/2” and 5/8”2
20 inch1 1/4” 1/4”, 3/8”, 1/2” and 5/8”
24 inch1 3/8” 3/8”, 1/2”, 5/8” and 3/4”
1 Use when required to meet KL/r ratio or when smaller diameter CIP do not meet design.
2 5/8” wall thickness is less commonly available than the smaller wall thicknesses of pipe pile.

Use minimum nominal wall thickness which is preferred. When this wall thickness is inadequate for structural strength or for driving (drivability), then a thicker wall shall be used. Specify the required wall thickness. The contractor shall determine the pile wall thickness required to avoid damage during driving or after adjacent piles have been driven, but not less than the minimum specified.

Minimum tip elevation must be shown on plans. Criteria for minimum tip elevation shall also be shown. The following information shall be included on the plans:

“Minimum Tip Elevation is required _______________.” Reason must be completed by designer such as:
  • for lateral stability
  • for required tension or uplift pile capacity
  • to penetrate anticipated soft geotechnical layers
  • for scour*
  • to minimize post-construction settlements
  • for minimum embedment into natural ground
*For scour, estimated maximum scour depth (elevation) must be shown on plans.
Guidance Note: Show maximum of total scour depths estimated for multiple return periods in years from Preliminary design which should be given on the Design Layout. Show the controlling return period (e.g. 100, 200, 500). If return periods are different for different bents, add a new line in foundation data table.

751.36.3 Pile Point Reinforcement

Pile point reinforcement is also known as a pile tip (e.g., pile shoe or pile toe attachments).

751.36.3.1 Structural Steel HP Pile

Pile point reinforcement shall be required for all HP piles required to be driven to bear on rock regardless of pile strength used for design loadings or geomaterial (soils with or without gravel or cobbles) to be penetrated. Pile point reinforcement shall be manufactured in one piece of cast steel. Manufactured pile point reinforcements are available in various shapes and styles as shown in FHWA-NHI-16-010, Figure 16-5.

751.36.3.2 Cast-In-Place (CIP) Pile

For CIP piles, use pile point reinforcement if boulders or cobbles or dense gravel are anticipated.

Geotechnical Section shall recommend when pile point reinforcement is needed and type of pile point reinforcement on the Foundation Investigation Geotechnical Report.

For Closed Ended Cast-In-Place Concrete Pile (CECIP)

Two types are available.

1. “Cruciform” type should be used as recommended and for hard driving into soft rock, weathered rock, and shales. It will continue to develop end bearing resistance while driving since an exposed flat closure plate is included with this point type. The closure plate acts to distribute load to the pile cross sectional area.
2. “Conical” type should be used as recommended and when there is harder than typical driving conditions, for example hard driving through difficult soils like heavily cobblestoned, very gravelly, densely layered soils. Severely obstructed driving can cause CIP piles with conical points to deflect. Conical pile points are always the more expensive option.

For Open Ended Cast-In-Place Concrete Pile (OECIP)

One type is available.

“Open Ended Cutting Shoe” type should be used as recommended and when protection of the pipe end during driving could be a concern. It is also useful if uneven bearing is anticipated since a reinforced tip can redistribute load and lessen point loading concerns.
Open ended piles are not recommended for bearing on hard rock since this situation could create inefficient point loading that could be structurally damaging.

When Geotechnical Section indicates that pile point reinforcement is needed on the boring log, then the recommended pile point reinforcement type shall be shown on the plan details. Generally this information is also shown on the Design layout.

For pile point reinforcement detail, see

Bridge Standard Drawings
Pile

751.36.4 Anchorage of Piles for Seismic Categories B, C and D

751.36.4.1 Structural Steel HP Pile - Details

Use standard seismic anchorage detail for all HP pile sizes. Modify detail (bolt size, no. of bolts, angle size) if seismic and geotechnical analyses requires increased uplift resistance. Follow AASHTO 17th Ed. LFD or AASHTO Guide Specifications for LRFD Seismic Bridge Design (SGS).

751.36.4.1.jpg
Note: Galvanizing ∟4x4, ¾” diameter bolts, (ASTM F3125 Grade A325 Type 1 Plain), washers and nuts will not be required.

751.36.4.2 Cast-In-Place (CIP) Pile - Details

Bridge Standard Drawings
Pile

751.36.5 Design Procedure

  • Structural Analysis
  • Geotechnical Analysis
  • Drivability Analysis

751.36.5.1 Design Procedure Outline

  • Determine foundation load effects from the superstructure and substructure for Service, Strength and Extreme Event Limit States.
  • If applicable, determine scour depths, liquefaction information and pile design unbraced length information.
  • Determine if downdrag loadings should be considered.
  • Select preliminary pile size and pile layout.
  • Perform a Static Pile Soil Interaction Analysis. Estimate Pile Length and pile capacity.
  • Based on pile type and material, determine Resistance Factors for Structural Strength ( and ).
  • Determine:
    • Maximum axial load effects at toe of a single pile
    • Maximum combined axial & flexural load effects of a single pile
    • Maximum shear load effect for a single pile
    • Uplift pile reactions
  • Determine Nominal and Factored Structural Resistance for single pile
    • Determine Structural Axial Compression Resistance
    • Determine Structural Flexural Resistance
    • Determine Structural Combined Axial & Flexural Resistance
    • Determine Structural Shear Resistance
  • Determine method for pile driving acceptance criteria
  • Determine Resistance Factor for Geotechnical Resistance () and Driving Resistance ().
  • If other than end bearing pile on rock or shale, determine Nominal Axial Geotechnical Resistance for pile.
  • Determine Factored Axial Geotechnical Resistance for single pile.
  • Determine Nominal pullout resistance if pile uplift reactions exist.
  • Check for pile group effects.
  • Resistance of Pile Groups in Compression
  • Check Drivability of all pile (bearing and friction pile) using the Wave equation (GRLWEAP).
  • Review Static Pile Soil Interaction Analysis and pile lengths for friction pile.
  • Show proper Pile Data on Plan Sheets (Foundation Data Table).

751.36.5.2 Structural Resistance Factor ( and ) for Strength Limit State, LRFD 6.5.4.2

Resistance Factor for Structural Strength

The structural resistance factor for axial resistance in compression is dependent upon the expected driving conditions. When the pile is subject to damage due to severe driving conditions where use of pile point reinforcement is necessary:

Steel Shells (Pipe): = 0.60
HP Piles: = 0.50

When the pile is subject to good driving conditions where use of pile point reinforcement is not necessary:

Steel Shells (Pipe) Piles: = 0.70
HP Piles: = 0.60

For HP piles, pile point reinforcement is always required when HP piles are anticipated to be driven to rock and proofed. Driving HP piles to rock is considered severe driving conditions for determination of structural resistance factor. However, driving HP piles through overburden not likely to impede driving to deep rock or preboring to rock for setting piles are two situations that could be considered as less than severe. Further, driving any steel pile through soil without rubble, boulders, cobbles or very dense gravel could be considered good driving conditions for determination of structural resistance factor. Consult the Structural Project Manager or Structural Liaison Engineer.

The structural resistance factor for combined axial and flexural resistance of undamaged piles:

Axial resistance factor for HP Piles: = 0.70
Axial resistance for Steel Shells (Pipe): = 0.80
Flexural resistance factor for HP Piles or Steel Shells: = 1.00

For Extreme Event Limit States see LRFD 10.5.5.3.

751.36.5.3 Geotechnical Resistance Factor () and Driving Resistance Factor (), LRFD Table 10.5.5.2.3-1

The factors for Geotechnical Resistance () and Driving Resistance () will usually be different because of the different methods used to determine the nominal bearing resistance. Caution should be used if the difference in factors for Geotechnical Resistance and Driving Resistance are great as it can lead to issues with pile overruns. Also see EPG 751.36.5.9.

Geotechnical Resistance Factor, :

The Geotechnical Resistance factor is based on the static method used by the designer in determining the nominal bearing resistance. Unlike the Driving Resistance factor the Geotechnical Resistance factor can vary with the soil layers. If Geotechnical Resistance factors are not provided by the Geotechnical Engineer, values may be selected from LRFD Table 10.5.5.2.3-1. For Extreme Event Limit States see LRFD 10.5.5.3.

Driving Resistance Factor, :

The Driving Resistance factor shall be selected from LRFD Table 10.5.5.2.3-1 based on the method to be used in the field during construction to verify nominal axial compressive resistance.

Method Resistance Factor,
FHWA-modified Gates Dynamic Pile Formula
(End of Drive condition only)
0.40
Wave Equation Analysis 0.50
Dynamic Testing on 1 to 10% piles 0.65
Other methods Refer to LRFD Table 10.5.5.2.3-1

Use EPG 751.50 Standard Detailing Note G7.3 on plans as required. This requirement shall apply to any type of rock meaning weak to strong rock including stronger shales where HP piling is anticipated to meet refusal.

FHWA-modified Gates Dynamic Pile Formula is not considered accurate for pile loading (Minimum Nominal Axial Compressive Resistance) exceeding 600 kips. When pile loading exceeds 600 kips, use wave equation analysis, dynamic testing or other method.

Dynamic Testing is recommended for projects with friction piles.

751.36.5.4 Downdrag and Losses to Geotechnical Resistance due to Scour and Liquefaction (kips), LRFD 10.7.3.6, 10.7.3.7, and AASHTO Guide Specifications for LRFD Seismic Bridge Design (SGS) 6.8

Downdrag, liquefaction and scour all reduce the available skin friction capacity of piles. Downdrag is unique because it not only causes a loss of capacity, but also applies a downward force to the piles. This is usually attributed to embankment settlement. However, downdrag can also be caused by a non-liquefied layer overlying a liquefied layer. Review geotechnical report for downdrag and liquefaction information.

751.36.5.5 Preliminary Structural Nominal Axial Design Capacity (PNDC) of an individual pile (kips)

The PNDC equations provided herein assume the piles are continually braced. This assumption is applicable for the portion of piling below ground or confined by solid wall encasement. If designing a pile bent structure, scour exists or liquefaction exists then the pile shall be checked considering the appropriate unbraced length.

Structural Steel HP Piles

Since we are assuming the piles are continuously braced, then = 0.
is the yield strength of the pile
is the area of the steel pile

Welded or Seamless Steel Shell (Pipe) Cast-In-Place Piles (CIP Piles)

is the yield strength of the pipe pile
is the area of the steel pipe (deducting 12.5 % ASTM tolerance and 1/16 inch corrosion where appropriate.)
is the concrete compressive strength at 28 days
is the area of the concrete inside the pipe pile
Maximum Load during pile driving =

Welded or Seamless Steel Shell shall be ASTM 252 Grade 3 (45 ksi). ASTM 252 states “the wall thickness at any point shall not be more than 12.5% under the specified nominal wall thickness.” AASHTO recommends deducting 1/16” of the wall thickness due to corrosion (LRFD 5.13.4.5.2). Corrosion need not be considered at construction stage and for drivability analysis and driven analysis. For drivability analysis and driven analysis deduct 12.5% of specified nominal wall thickness (ASTM A252). For structural design deduct 12.5 % (ASTM A252) and 1/16” for corrosion (LRFD 5.13.4.5.2) from specified nominal wall thickness.

751.36.5.6 Preliminary Factored Axial Design Capacity (PFDC) of an Individual Pile (kips)

PFDC = Structural Factored Axial Compressive Resistance – Factored Downdrag Load

751.36.5.7 Design Values for Steel Pile

751.36.5.7.1 Design Values for Individual HP Pile

Design Values for HP Pile

Fy = 50 ksi. End Bearing Piles (HP piles) anticipated to be driven to rock.

Pile Size As
Area,
sq. in.
Structural
Nominal
Axial
Compressive
Resistance
PNDC1,2,
kips
Φc
Structural
Resistance
Factor4,
LRFD 6.5.4.2
Structural
Factored
Axial
Compressive
Resistance2,3,4,
kips
0.9*ϕda*Fy
Maximum
Nominal
Driving
Stress,
LRFD 10.7.8,
ksi
HP 12x53 15.5 775 0.5 388 45.00
HP 14x73 21.4 1070 0.5 535 45.00
1 Structural Nominal Axial Compressive Resistance for fully embedded piles only. Structural Nominal Axial Compressive Resistance for unsupported piles shall be determined in accordance with LRFD 10.7.3.13.1. (i.e., intermediate pile cap bent).

     Minimum Nominal Axial Compressive Resistance = Required nominal driving resistance, Rndr
                  = (Maximum factored axial loads / ϕdyn) ≤ Structural nominal axial compressive resistance, PNDC          LRFD 10.5.5.2.3

2 Axial Compressive Resistance values shown above shall be reduced when downdrag is considered

3 Maximum factored axial load per pile ≤ Structural factored axial compressive resistance.

4 Values are applicable for Strength Limit States. Modify value for other Limit States.


Notes:

ϕdyn = Resistance factor of the dynamic method to be used to estimate nominal pile resistance during pile installation.      LRFD Table 10.5.5.2.3-1

When Minimum Nominal Axial Compressive Resistance exceeds 600 kips do not use FHWA-modified Gates Dynamic Formula for field verification. Use Dynamic testing, Wave equation analysis or other method.

Drivability analysis shall be performed for all HP piles using Delmag D19-42 and Delmag D30-23 (Heavy Hammer). Do not show minimum hammer energy on plans.

Check drivability for all HP Pile in accordance with EPG 751.36.5.11

For additional design requirements, see EPG 751.36.5.1.

751.36.5.7.2 Design Values for Individual Cast-In-Place (CIP) Pile

Design Values for Closed-Ended CIP Pile

Grade 3 Fy = 45 ksi; F'c = 4 ksi; Structural Resistance Factor, (Φc)1 = 0.6

Unfilled Pipe For Axial Analysis2 Concrete Filled Pipe For Flexural Analysis3
Pile Outside Diameter O.D., in. Pile Inside Diameter I.D., in. Minimum Wall Thickness,
in.
Reduced Wall thick. for Fabrication (ASTM 252),
in.
As,4
Area of Steel Pipe,
sq. in.
Structural Nominal Axial Compressive Resistance, Pn5,6,7,8,
kips
Structural Factored Axial Compressive Resistance1,8,9,
kips
0.9*ϕda*Fy*As
Maximum
Nominal
Driving
Resistance6,7,
LRFD 10.7.8,
kips
Reduced Wall Thick. for Corrosion (1/16"), LRFD 5.13.4.5.2,
in.
Ast,10 Net Area of Steel Pipe,
sq. in.
Ac Concrete Area,
sq. in.
Structural Nominal Axial Compressive Resistance PNDC5,8,11,
kips
Structural Factored Axial Compressive Resistance1,8,11,
kips
14 13.5 0.25 0.22 9.43 424 255 382 0.156 6.70 143 788 473
13.25 0.375 0.33 14.00 630 378 567 0.266 11.28 138 976 586
13 0.5 0.44 18.47 831 499 748 0.375 15.76 133 1160 696
12.75 0.62512 0.55 22.84 1028 617 925 0.484 20.14 128 1340 804
16 15.5 0.25 0.22 10.80 486 292 437 0.156 7.69 189 987 592
15.2 0.375 0.33 16.06 723 434 650 0.266 12.95 183 1204 722
15 0.5 0.44 21.22 955 573 859 0.375 18.11 177 1416 850
14.75 0.62512 0.55 26.28 1183 710 1064 0.484 23.18 171 1624 975
20 19.5 0.25 0.22 13.55 610 366 549 0.156 9.65 299 1450 870
19.25 0.375 0.33 20.18 908 545 817 0.266 16.29 291 1722 1033
19 0.5 0.44 26.72 1202 721 1082 0.375 22.83 284 1991 1195
18.75 0.625 0.55 33.15 1492 895 1343 0.484 29.27 276 2256 1354
24 23.25 0.375 0.33 24.31 1094 656 984 0.266 19.62 425 2327 1396
23 0.5 0.44 32.21 1450 870 1305 0.375 27.54 415 2652 1591
22.75 0.625 0.55 40.03 1801 1081 1621 0.484 35.36 406 2973 1784
22.5 0.75 0.66 47.74 2148 1289 1933 0.594 43.08 398 3290 1974
1 Values are applicable for Strength Limit States. Modify value for other Limit States.


2 Use to determine preliminary number of pile and pile size.

3 Pipes placed in prebored holes on rock can use filled pipe capacity for axial plus flexural resistance. Therefore, number of piles should be based on this capacity assuming rock is infinitely more stiff.

4 Corrosion NOT considered at construction stage and for drivability analysis and driven analysis. For drivability analysis and driven analysis use reduced pipe nominal wall thickness, 12.5%, for fabrication (ASTM A252).

5 Structural Nominal Axial compressive resistance for fully embedded piles only. Value in table is a raw number and is the value used to determine the factored resistance. Structural Nominal Axial Compressive Resistance for unsupported piles shall be determined in accordance with LRFD 10.7.3.13.1. (i.e. Intermediate pile cap bent).

6 Structural nominal axial compressive resistance ≤ Maximum nominal driving resistance

7 Minimum Nominal Axial Compressive Resistance = Required nominal driving resistance, Rndr
      = Maximum factored axial loads / ϕdyn ≤ Structural nominal axial compressive resistance, Pn and                         LRFD 10.5.5.2.3
                                                                   ≤ Maximum nominal driving resistance.

8 Axial Compressive Resistance values shown above shall be reduced when downdrag is considered

9 Maximum factored axial load per pile ≤ Structural factored axial compressive resistance

10 Net area of steel pipe, Ast, assumes a 12.5% fabrication reduction (ASTM A252) and 1/16" (LRFD 5.13.4.5.2) reduction in pipe nominal wall thickness for corrosion.

11 Use for lateral load analysis. Resistance value includes filled pipe based on net area of steel pipe, Ast (12.5% fab. reduction and 1/16” corr. reduction in nominal pipe wall thickness).

12 5/8” wall thickness is less commonly available than the smaller wall thicknesses of pipe pile.


Notes:

Drivability analysis shall be performed for all CIP piles (unfilled pipe) using Delmag D19-42 and Delmag D30-23 (Heavy Hammer). Do not show minimum hammer energy on plans.

Check drivability for all CIP Pile in accordance with EPG 751.36.5.11.

Require dynamic pile testing for field verification for all CIP piles on the plans.

ϕdyn = 0.65 = Dynamic Testing resistance factor to be used to estimate nominal pile resistance during pile installation. This value may be increased if static load testing is specified per LRFD Table 10.5.5.2.3-1.

For additional design requirements, see EPG 751.36.5.1.

751.36.5.8 Additional Provisions for Pile Cap Footings

Pile Group Layout:

Preliminary Number of Piles Required =

Layout a pile group that will satisfy the preliminary number of piles required. Calculate the maximum and minimum factored load applied to the outside corner piles assuming the pile cap/footing is perfectly rigid. The general equation is as follows:

Max. Load =  

Min. Load =  

The maximum factored load per pile must be less than or equal to PFDC for the pile type and size chosen. If not, the pile size must be increased or additional piles must be added to the pile group. Reanalyze until the pile type, size and layout are satisfactory.

The minimum factored load per pile should preferably be greater than zero. If this cannot be practically satisfied, the factored pullout resistance of the pile shall be calculated.

Resistance of Pile Groups in Compression                                                                                                                          LRFD 10.7.3.9

If the cap is not in firm contact with the ground and if the soil at the surface is soft, the individual nominal resistance of each pile (751.36.5.5) shall be multiplied by an efficiency factor, , based on pile spacing.

751.36.5.9 Estimate Pile Length and Check Pile Capacity

751.36.5.9.1 Estimated Pile Length

Friction Piles:

Estimate the pile length required to achieve the minimum nominal axial compressive resistance, Rndr, for establishment of contract pile quantities. Perform a static analysis to determine the nominal resistance profile of the soil. For each soil layer the appropriate resistance factor, ϕstat, shall be applied to account for the reliability of the static analysis method chosen in order to create a factored resistance profile. The penetration depth would then occur at the location where the factored resistance profile intercepts the factored load. Similarly, for a uniform soil layer the adjusted nominal resistance, Rnstat, can be determined from the equation below.

ϕdyn x Rndr = ϕstat x Rnstat ≥ Factored Load LRFD C10.7.3.3-1

Where:

ϕdyn = see EPG.751.36.5.3
Rndr = Minimum nominal axial compressive resistance = Required nominal driving resistance
ϕstat = Static analysis resistance factor per LRFD Table 10.5.5.2.3-1 or as provided by the Geotechnical Engineer. Factors for side friction and end bearing may be different.
Rnstat = Adjusted Nominal resistance due to static analysis reliability

Use soil profiles from borings and mimic soil characteristics as closely as possible in computations or software to calculate the geotechnical resistance and for estimating the length of pile.

It is not advisable to design pile deeper than available borings or to reach capacity within the bottom 3 to 5 feet of borings. If a longer pile depth is needed to meet design requirements then request Geotechnical Section to provide deeper borings or increase the number of piles which will reduce load per pile as well as the required pile length.

For friction pile the top five feet of soil friction resistance may be neglected with SPM or SLE approval for possible disturbance from MSE wall excavation prior to driving pile.

End Bearing Piles:

The estimated pile length is the distance along the pile from the cut-off elevation to the estimated tip elevation considering any penetration into rock. The estimated tip elevation shall not be shown on plans for end bearing piles.

The geotechnical material above the estimated end bearing tip elevation shall be reviewed to review the presence of glacial till or similar layers exist. If these layers are present, then a static analysis shall be performed to verify if the required pile resistance is reached at a higher elevation due to pile friction capacity.

751.36.5.9.2 Check Pile Geotechnical Capacity (Axial Loads Only)

Use the same methodology outlined in EPG 751.36.5.9 Estimate Pile Length and Check Pile Capacity.

751.36.5.9.3 Check Pile Structural Capacity (Combined Axial and Bending)

Structural design checks which include lateral loading and bending shall be accomplished using the appropriate structural resistance factors.

751.36.5.10 Pile Nominal Axial Compressive Resistance (kips)

The minimum nominal axial compressive resistance, Rndr, must be calculated and shown on the final plans. The factored axial compressive resistance will be used to verify the pile group layout and loading. The minimum nominal axial compressive resistance will be used in construction field verification methods to obtain the required nominal driving resistance.

Minimum Nominal Axial Compressive Resistance = Required Nominal Driving Resistance,
= Maximum factored axial loads/ϕdyn
ϕdyn = Resistance factor of the dynamic method to be used to estimate nominal pile resistance during pile installation. LRFD 10.5.5.2.3.1

The value of Rndr shown on the plans shall be the greater of the value required at the Strength limit state and Extreme Event limit state. This value shall not be greater than the structural nominal axial compressive resistance of the pile nor shall it exceed the maximum nominal driving resistance of the steel shell for CIP piles. See EPG 751.36.5.5.                                                                                    LRFD 10.7.7

751.36.5.11 Check Pile Drivability

Drivability of the pile through the soil profile can be investigated using “GRLWEAP” program or other available software. Designers may import soil resistances from a static analysis programor input soil values directly into GRLWEAP program to perform drivability.

If soil values are to be directly input into GRLWEAP program, enter in values of sand and clay layers with specific values of cohesion or internal friction angle or just by uncorrected blow count values obtained from borings.

Drivability analysis shall be performed for all piles (bearing pile and friction pile) using the Delmag D19-42 hammer and the Delmag D30-23 – Heavy Hammer.

Use soil profiles from borings and mimic soil characteristics as closely as possible for computations or in software to perform drivability analysis of any kind of pile.

Structural steel HP Pile:

Drivability analysis shall be performed for two cases:

1. Box shape
2. Perimeter

Drivability shall be performed considering existing condition without considering any excavation/ disturbance (i.e., possible disturbance to top 5 feet of soil from MSE wall excavation prior to driving pile), liquefaction or future scour loss.

Hammer types:

Pile Driving Hammer Information For GRLWEAP
Hammer used in the field per survey response (2017)
GRLWEAP ID Hammer name No. of Responses
41 Delmag D19-421 13
40 Delmag D19-32 6
38 Delmag D12-42 4
139 ICE 32S 4
15 Delmag D30-32 2
Delmag D25-32 2
127 ICE 30S 1
150 MKT DE-30B 1
1 Delmag series of pile hammers is the most popular, with the D19-42 being the most widely used.

Hammer usage in the field will be surveyed every five years. The above results will be revised according to the new survey and the most widely used hammer will be selected for drivability analysis.

The contractor is responsible for determining the hammer energy required to successfully drive the pile to the minimum tip elevation and to reach the minimum nominal axial compressive resistance specified on the plans. The contractor shall perform a drivability analysis to select an appropriate hammer size to ensure the pile can be driven without overstressing the pile and to prevent refusal of the pile prior to reaching the minimum tip elevation. The contractor shall plan pile driving activities and submit hammer energy requirements to the engineer for approval before driving.

Practical refusal is defined at 20 blows/inch or 240 blows per foot.

Driving should be terminated immediately once 30 blows/inch is encountered.

Nominal Driving Stress LRFD 10.7.8
Nominal driving stress ≤ 0.9*ϕda*Fy
For structural steel HP pile, Maximum nominal driving stress = 45 ksi
For CIP pile, Maximum nominal driving resistance, see EPG 751.36.5.7.2 (unfilled pipe for axial analysis).

If analysis indicates the piles do not have sufficient structural or geotechnical strength or drivability issues exist then consider increasing the number of piles.

751.36.5.12 Information to be Included on the Plans

See EPG 751.50 A1 Design Specifications, Loadings & Unit Stresses for appropriate design stresses to be included in the general notes.

See EPG 751.50 E2 Foundation Data Table for appropriate data to be included in the foundation data table for HP pile and CIP pile and any additional notes required below the table. See Bridge Standard Drawings “Pile” for CIP data table.