Difference between revisions of "Main Page"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (EPG 751)
m (Per EPS, revised Main Page's appearance)
Line 1: Line 1:
[[Image:EPG 2013b.jpg|1030px|center]]
+
{|
 
+
|colspan="3" width=1030px| [[Image:EPG 2013b.jpg|1020px|center]]  
 
 
{|style="padding: 0.3em; margin-left:0px; border:3px solid #a9a9a9; text-align:center; font-size: 100%; background:#E3C87E" width="1030px" align="center"
 
 
|-
 
|-
|colspan="4" align="center"|'''<Big><font color = "white"><i>Useful information on how to search for info in the EPG: [[media:Searching the Engineering Policy Guide.docx|Searching the Engineering Policy Guide]]'''</i></font color="white">
+
|colspan="3"| [[image:Main Page Mission.jpg|1020px|center]]
 
|-
 
|-
|colspan="4" align="center"| '''<Big><font color = "white"><i>Want help on how to update your EPG guidance? &nbsp;It is available at [[:Help Article#EPG Approval Process|EPG Approval Process]].'''</i></font color="white">
+
|colspan="3"| [[image:Main Page Welcome.jpg|1020px|center]]
 
|-
 
|-
|colspan="4" align="center"| <sup>'''___________'''</sup>
+
|style="background:#F8F8FF" colspan="1" rowspan="1" width=830px|MoDOT’s three pillars of “Safety, Service and Stability” steer our leadership and employees.  Our commitment to safety includes keeping both customers and ourselves safe.  Our service includes providing outstanding customer service, delivering transportation solutions of great value and using resources wisely.  Keeping roads and bridges in good condition, operating a reliable and convenient transportation system, and advancing Missouri’s economic development reflect our commitment to stability.<br/>Innovative concepts, such as [[:Category:143 Practical Design|Practical Design]] and [[:Category:139 Design - Build|design-build]], are used to deliver our commitments.  These and other forward-thinking concepts shape the content of the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related [http://sharepoint/systemdelivery/br/pages/default.aspx Bridge], [http://sharepoint/systemdelivery/cm/Pages/default.aspx Construction], [http://sharepoint/sites/de/Pages/default.aspx Design], [http://sharepoint/systemdelivery/tr/Pages/default.aspx Highway Safety & Traffic], [http://sharepoint/systemdelivery/mt/default.aspx Maintenance], [http://sp/sites/tp/Pages/default.aspx Planning] and [http://sharepoint/sites/de/RealEstate/SitePages/Home.aspx Right of Way] guidance.|| valign="center" style="border: 7px solid #A9A9A9" align="right" width=150px| '''<Big><center>[[media:MASH Implementation.pdf|MoDOT's MASH<br/>Implementation<br/>Information]]</center> </Big>'''
 
|-
 
|-
|colspan="4" align="center"| '''<Big><font color = "white"><i>[http://www.modot.org/business/standards_and_specs/highwayspecs.htm The Electronic MoDOT Spec Book for Mobile Devices] is now available. You may also [https://www6.modot.mo.gov/eMoDOTWeb/jsp/signon/signon.jsp sign up for E-Update notices]. To receive notices regarding Engineering Policy Revisions, select "Engineering Policy" then mark the appropriate subjects of interest. '''</i></font color="white">
+
|colspan="3" background:white|
|}
 
 
 
 
 
{|style="padding: 0.3em; border:2px solid #696969; color: #000; text-align:center; font-size: 100%; background:#f5f5f5" width="1030px" align="center"
 
|-
 
|'''<Big>Our mission is to provide a world-class transportation system that is safe, innovative, reliable<br/>and dedicated to a prosperous Missouri.'''
 
|}
 
 
 
 
 
{|style="padding: 0.3em; border:1px solid #696969; color: #000; text-align:center; font-size: 100%; background:#A9A9A9" width="1000px" align="center"
 
|-
 
!<big><center>'''<font color = "white"><i>WELCOME'''</i></font color="white"></center></big>
 
|}
 
{|style="padding: 0.3em; border:1px solid #696969; color: #000; text-align:left; font-size: 100%; background:#F8F8FF" width="1000px" align="center"
 
 
|-
 
|-
|MoDOT’s three pillars of “Safety, Service and Stability” steer our leadership and employees.  Our commitment to safety includes keeping both customers and ourselves safe.  Our service includes providing outstanding customer service, delivering transportation solutions of great value and using resources wisely.  Keeping roads and bridges in good condition, operating a reliable and convenient transportation system, and advancing Missouri’s economic development reflect our commitment to stability.<br/>
+
|style="border:3px solid #a9a9a9; text-align:center; font-size: 100%; background:#74BAAC" width="830px" align="center" rowspan="1"|'''<Big><font color = "white"><i>Useful information on how to search for info in the EPG: [[media:Searching the Engineering Policy Guide.docx|Searching the Engineering Policy Guide]]<br/>'''<font color = "white"><i>Want help on how to update your EPG guidance? &nbsp;It is available at [[:Help Article#EPG Approval Process|EPG Approval Process]].'''</i></font color="white">'''</i></font color="white"><br/>'''<font color = "white"><i>[http://www.modot.org/business/standards_and_specs/highwayspecs.htm The Electronic MoDOT Spec Book for Mobile Devices] is now available. You may also [https://www6.modot.mo.gov/eMoDOTWeb/jsp/signon/signon.jsp sign up for E-Update notices]. To receive notices regarding Engineering Policy Revisions, select "Engineering Policy" then mark the appropriate subjects of interest. '''</i></font color="white"><Big/>||rowspan="1" valign="center" width="180px" cellspacing="3" cellpadding="3" style="border: 9px solid #DCEDEA; background:#f5f5f5" align="center" rowspan="1"|'''<big><font color="white"><i>[[Recent Policy Changes in the EPG|RECENT POLICY CHANGES<br/>IN THE EPG]]</i></font color="white"></big>'''
Innovative concepts, such as [[:Category:143 Practical Design|Practical Design]] and [[:Category:139 Design - Build|design-build]], are used to deliver our commitments. These and other forward-thinking concepts shape the content of the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related [http://sharepoint/systemdelivery/br/pages/default.aspx Bridge], [http://sharepoint/systemdelivery/cm/Pages/default.aspx Construction], [http://sharepoint/sites/de/Pages/default.aspx Design], [http://sharepoint/systemdelivery/tr/Pages/default.aspx Highway Safety & Traffic], [http://sharepoint/systemdelivery/mt/default.aspx Maintenance], [http://sp/sites/tp/Pages/default.aspx Planning] and [http://sharepoint/sites/de/RealEstate/SitePages/Home.aspx Right of Way] guidance.
 
 
|}
 
|}
 
<div style="padding-bottom: .3em; margin: 0 .5em .5em"></div>
 
{| cellspacing="3"
 
| valign="top" width="100%" cellspacing="3" cellpadding="3" style="border: 1px solid #FF8C00; background:#FFA500" align="center"|'''<big><font color="white"><i>RECENT POLICY CHANGES IN THE EPG</i></font color="white"></big>'''
 
|-
 
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 
'''Reinforcement Details'''
 
 
12/2/19:  Reinforcement details were updated in [[751.9 LFD Seismic#751.9.3.1.7 T- Joint Connections|EPG 751.9.3.1.7 T-Joint Connections]], [[751.31 Open Concrete Intermediate Bents#751.31.1.2 Rigid Frame- No Tie or Web Beam|EPG 751.31.1 and EPG 751.31.3]] and [[751.32 Concrete Pile Cap Intermediate Bents#751.32.4 Reinforcement|EPG 751.32.4 Reinforcement]] to be in accordance with new epoxy coated guidelines and with new development and splice length requirements. Alternate end bent reinforcement details for shallow structures were added in [[751.35 Concrete Pile Cap Integral End Bents#751.35.3.3 Prestressed Girder End Bent|EPG 751.35.3.3 through EPG 751.35.4.4]].       
 
 
'''[[751.50 Standard Detailing Notes|EPG 751.50 Standard Detailing Notes]]'''
 
 
11/21/19: Guidance about underlined portions of notes was added.
 
 
'''[[:Category:146 Disadvantaged Business Enterprise (DBE)#When a DBE manufacturer|EPG 146.3.2.3 Commercially Useful Function (CUF)]]'''
 
 
11/19/19: The location for storing CUF documents was updated from the archaic V: drive to eProjects.
 
 
'''[[751.11 Bearings#Taper|EPG 751.11.2.1 Elastomeric Bearings Taper]]'''
 
 
11/14/19: The illustrations have been revised to clarify the maximum allowed taper.
 
 
'''New QRG'''
 
 
11/14/19: The new [http://epg.modot.mo.gov/forms/CM/AWP_MA_Sample_Record_Acceptance_By_Certification.docx AWP MA Sample Record Acceptance By Certification] QRG is now available.
 
 
'''[[:Category:105 Control of Work#The DWR shall be created|EPG 105.9.3 Daily Work Reports]]'''
 
 
11/6/19: Guidance has been added for when Daily Work Reports in AASHTOWARE may be suspended.
 
 
'''[[236.5 Property Management#236.5.28.3 Compensation for Changes in Access|EPG 236.5.28.3 Compensation for Changes in Access]] and [[236.6 Appraisal and Appraisal Review#After the appraiser has been made aware|EPG 236.6.5.9 Non-Competitive Proposals for Contract Realty Appraisals]]'''
 
 
10/28/19: Guidance has been clarified to better reflect current practices.
 
 
'''AASHTOWare'''
 
 
10/25/19: Guidance in [[:Category:105 Control of Work#105.9 Authority and Duties of Resident Engineer (Sec 105.9)|EPG 105.9 Authority and Duties of Resident Engineer]] and [[:Category:105 Control of Work#105.9.3 Daily Work Reports|EPG 105.9.3 Daily Work Reports]] now allows for the expanded opportunities of the AWP.
 
 
'''Drilled Shafts'''
 
 
10/23/19:  Guidance in [[751.37 Drilled Shafts#751.37.1.6 Drilled Shaft General Detail Considerations|EPG 751.37.1.6 Drilled Shaft General Detail Considerations]] was expanded and clarified.
 
 
'''[[121.7 Program Estimates#The programming estimate must address|EPG 121.7 Program Estimates]]'''
 
 
10/21/19: District estimate documentation requirements must address the total project cost and include estimated costs for, at a minimum, PE, CE, Construction, RW, Utilities, and Bridge.  Program estimate documentation and supporting documentation must be stored in e-Projects. 
 
 
'''Estimating Guidance Updates'''
 
 
10/21/19: Estimating guidance in [[104.7 Scoping Estimates|EPG 104.7 Scoping Estimates]] and [[121.7 Program Estimates|EPG 121.7 Program Estimates]] was updated with optional spreadsheets to assist the districts with their scoping and estimating processes.  The [[media:121.7 Project Scoping Form.xlsx|Project Scoping Form]] and [[media:104.7 Resurfacing.xlsx|Resurfacing Per Mile Scoping Form]] are now available.
 
 
'''[[media:616.8.10d MT.pdf|TA-10d, Lane Closure on Two-Lane Highways with Edgelines Using Portable Signal Flagging Device]] and [[media:616.8.10e MT.pdf|Lane Closure on Two-Lane Highways without Edgelines Using Portable Signal Flagging Device]]'''
 
 
10/21/19: These TAs have been updated in [[616.8 Typical Applications (MUTCD 6H)#Listing of Typical Applications for Maintenance|EPG 616.8.1 Listing of Typical Applications for Maintenance]] to show that two Portable Signal Flagging Devices are always required.
 
 
'''[[:Category:618 Mobilization#Additional Mobilization for Seeding|Additional Mobilization for Seeding]]'''
 
 
10/17/19: Guidance for all jobs that contain the Additional Mobilization for Seeding pay item is now available.
 
 
'''[[:Category:505 Bridge Deck Concrete Wearing Surface#505.1.4 Polyester Polymer Concrete (PPC)|EPG 505.1.4 Polyester Polymer Concrete (PPC)]]'''
 
 
10/2/19: New guidance is now available for Polyester Polymer Concrete Overlay.
 
 
'''[[:Category:109 Measurement and Payment#109.12.5 Change Order Time Extension for Extreme Events|EPG 109.12.5 Change Order Time Extension for Extreme Events]]'''
 
 
9/26/19: This new guidance describes the latitude the State Construction and Materials Engineer has to grant time extensions for extreme events.
 
 
'''[[136.3 Federal Aid Basics#136.3.8.4 Bridge Engineering Assistance Program (BEAP)|EPG 136.3.8.4 Bridge Engineering Assistance Program (BEAP)]]'''
 
 
9/18/19: Guidance has been updated to conform with the new BEAP contract.
 
 
'''Abbreviations used by Design'''
 
 
9/5/19: [[media:237 Design Abbreviations.docx|Design Abbreviations]] are now presented in [[:Category:237 Contract Plans#Design Abbreviations|EPG 237 Contract Plans]].
 
 
'''Bridge Contract Plans'''
 
 
9/4/19: The guidance in EPG 237.13.3 Bridge Contract Plans was moved to [[751.5 Structural Detailing Guidelines#751.5.1.4 Contract Plan File Name Convention|EPG 751.5.1.4 Contract Plan File Name Convention]]. The guidance in EPG 751.1.4 was re-titled and moved to [[751.5 Structural Detailing Guidelines#751.5.1.7 Contract Addendums and Construction Changes|EPG 751.5.1.7 Contract Addendums and Construction Changes]].
 
 
'''Estimate Policies'''
 
 
8/30/19: Estimate guidance was clarified to reflect current practice.  Updated titles include [[103.1 Bid Opening and Award Process#103.1.8 Final Engineer's Estimate|EPG 103.1.8 Final Engineer's Estimate]], [[104.7 Scoping Estimates|EPG 104.7 Scoping Estimates]] and [[237.6 Project Estimates|EPG 237.6 Project Estimates]]. [[121.7 Program Estimates|EPG 121.7 Program Estimates]] is a new article compiled of clarified guidance from other articles.
 
 
'''[[127.9 Floodplain Management|EPG 127.9 Floodplain Management]] and [[748.8 Development in Floodplains|EPG 748.8 Development in Floodplains]]'''
 
 
8/29/19: Guidance for determining the need for a Floodplain Development Permit was widely clarified. EPG 127.9 was re-titled "Floodplain Management" and EPG 748.8 re-titled "Development in Floodplains".
 
 
'''[[147.3 Job Order Contracting (JOC)#Final Change Order.|EPG 147.3.9 Change Order Approvals]]'''
 
 
8/29/19: A sentence to be used that explains the reason for the final change order has been added to the guidance.
 
 
'''[[:Category:134 Engineering Professional Services#134.5.3 Consultant Contract Close-Out|EPG 134.5.3 Consultant Contract Close-Out]]'''
 
 
8/28/19: External Civil Rights has been added to the list of divisions that consultants must notify that the last invoice is the final invoice.
 
 
'''[[616.6 Temporary Traffic Control Zone Devices (MUTCD 6F)#616.6.58 PILOT CAR FOLLOW ME (GO20-4) and PILOT CAR IN USE WAIT & FOLLOW (GO20-4a) (MUTCD 6F.58)|EPG 616.6.58 PILOT CAR FOLLOW ME (GO20-4) and PILOT CAR IN USE WAIT & FOLLOW (GO20-4a)]]'''
 
 
8/27/19: Guidance has been provided for the two sizes of the GO20-4a sign.
 
 
'''[[media:616.8.38a DECM.pdf|TA-38a, Two Interior Lane Closure on a Freeway]]'''
 
 
8/26/19: TA-38a is now available in the [[616.8 Typical Applications (MUTCD 6H)#Listing of Typical Applications for Design and Construction and Materials|Listing of Typical Applications for Design and Construction and Materials]].
 
 
'''[[616.6 Temporary Traffic Control Zone Devices (MUTCD 6F)#The “Advance Warning Rail System” (AWRS)|EPG 616.6.2.2 Flags and Advance Warning Rail System on Signs]]'''
 
 
8/26/19: The ROAD CLOSED AHEAD (WO20-3) sign was identified as also requiring the installation of AWRS and flags in long-term situations for both road work and full closures.
 

Revision as of 14:35, 3 December 2019

EPG 2013b.jpg
Main Page Mission.jpg
Main Page Welcome.jpg
MoDOT’s three pillars of “Safety, Service and Stability” steer our leadership and employees. Our commitment to safety includes keeping both customers and ourselves safe. Our service includes providing outstanding customer service, delivering transportation solutions of great value and using resources wisely. Keeping roads and bridges in good condition, operating a reliable and convenient transportation system, and advancing Missouri’s economic development reflect our commitment to stability.
Innovative concepts, such as Practical Design and design-build, are used to deliver our commitments. These and other forward-thinking concepts shape the content of the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related Bridge, Construction, Design, Highway Safety & Traffic, Maintenance, Planning and Right of Way guidance.
MoDOT's MASH
Implementation
Information
Useful information on how to search for info in the EPG: Searching the Engineering Policy Guide
Want help on how to update your EPG guidance?  It is available at EPG Approval Process.
The Electronic MoDOT Spec Book for Mobile Devices is now available. You may also sign up for E-Update notices. To receive notices regarding Engineering Policy Revisions, select "Engineering Policy" then mark the appropriate subjects of interest.
RECENT POLICY CHANGES
IN THE EPG