Difference between revisions of "Main Page"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (EPG 153)
 
(630 intermediate revisions by 4 users not shown)
Line 1: Line 1:
[[Image:EPG 2013b.jpg|1030px|center]]
+
__NOTOC__
 +
<div style="margin-top:0px; margin-bottom:0px; background-color:black; border-radius:5px; box-shadow:5px 5px 5px #888888; border:1px solid black">
 +
<center>
 +
<div class="jcarousel-wrapper" style="margin-top:7px; margin-bottom:0px">
 +
<div class="jcarousel jcarousel-randomize">
 +
    <div class="jcarousel-list">
 +
        <div class="jcarousel-item">
 +
{{banner|direction=left|width=20%||section=Engineering Policy Guide|section-link=Main Page|image=EPG-001.png}}
 +
        </div>
 +
        <div class="jcarousel-item">
 +
{{banner|direction=left|width=40%||section=Engineering Policy Guide|section-link=Main Page|image=EPG-002.png}}
 +
        </div>
 +
        <div class="jcarousel-item">
 +
{{banner|direction=left|width=40%||section=Engineering Policy Guide|section-link=Main Page|image=EPG-007.png}}
 +
        </div>
 +
        <div class="jcarousel-item">
 +
{{banner|direction=left|width=40%||section=Engineering Policy Guide|section-link=Main Page|image=EPG-004.png}}
 +
        </div>
 +
        <div class="jcarousel-item">
 +
{{banner|direction=left|width=40%||section=Engineering Policy Guide|section-link=Main Page|image=EPG-005.png}}
 +
        </div>
 +
        <div class="jcarousel-item">
 +
{{banner|direction=left|width=40%||section=Engineering Policy Guide|section-link=Main Page|image=EPG-006.png}}
 +
        </div>
 +
        <div class="jcarousel-item">
 +
{{banner|direction=left|width=40%||section=Engineering Policy Guide|section-link=Main Page|image=EPG-003.png}}
 +
        </div>
 +
    </div>
 +
</div>
 +
</div>
 +
</center>
 +
</div>
  
 
+
{| style="text-align:center; margin-top:12px; margin-left: auto; margin-right: auto; font-style:italic; font-size:20px; font-family:Verdana, Geneva, sans-serif !important;"
{|style="padding: 0.3em; margin-left:0px; border:3px solid #a9a9a9; text-align:center; font-size: 100%; background:#E3C87E" width="1030px" align="center"  
 
 
|-
 
|-
|rowspan="2" align="right" |'''<font color = "white"><font size = 4.7><i>HELPFUL EPG VIDEOS: </i></font color="white"></font size = 5>|| ||align="left"|''' <BIG><font color = "white"><i>'''[[media:Logging into the EPG.wmv|•Logging into the EPG]]</i></font color="white"> ||align="left"|''' <BIG><font color = "white"><i>'''[[media:Help Finding EPG Info.wmv|•Finding Info in the EPG]]</i></font color="white">'''
+
! style="padding-left:90px; padding-right:90px; |
|-
+
----
| ||align="left" colspan="2"|''' <Big><font color = "white"><i>[[media:Article History and Receiving.wmv|•Article History & How to Receive EMails When Articles are Revised]]</i></font color="white">
+
Our mission is to provide a world-class transportation system that is</br>safe, innovative, reliable and dedicated to a prosperous Missouri.
|-
+
----
|colspan="4" align="center"| <sup>'''___________'''</sup>
 
|-
 
|colspan="4" align="center"| '''<Big><font color = "white"><i>Want help on how to update your EPG guidance? &nbsp;It is available at [[:Help Article#EPG Approval Process|EPG Approval Process]].'''</i></font color="white">
 
|-
 
|colspan="4" align="center"| <sup>'''___________'''</sup>
 
|-
 
|colspan="4" align="center"| '''<Big><font color = "white"><i>[http://www.modot.org/business/standards_and_specs/highwayreadme.htm The Electronic MoDOT Spec Book for Mobile Devices] is now available. You may also [http://www.modot.org/eMoDOTWeb/jsp/signon/signon.jsp sign up for E-Update notices]. To receive notices regarding Engineering Policy Revisions, select "Engineering Policy" then mark the appropriate subjects of interest. '''</i></font color="white">
 
 
|}
 
|}
  
 
+
{| style="width:100%; text-align:center; margin-top:0px;"
 
 
<div style="padding-bottom: .3em; margin: 0 .5em .5em"></div>
 
{| cellspacing="3"
 
|- valign="top" width="100%"
 
|style="border: 1px solid #696969; color: #000; background-color: #A9A9A9"|<big><center>'''<font color = "white"><i>WELCOME'''</i></font color="white"></center></big>
 
| valign="top" width="60%" cellspacing="3" cellpadding="3" style="border: 1px solid #FF8C00; background:#FFA500" align="center"|'''<big><font color="white"><i>RECENT POLICY CHANGES IN THE EPG</i></font color="white"></big>'''
 
|-
 
|valign="top" style="border: 1px solid #A9A9A9; color: #000; background-color: #F8F8FF"|
 
{| style="margin: 1em auto 1em auto"
 
 
|-
 
|-
|colspan="2" |    [[image:Main Page Feb 23, 2016.jpg|center|400px|thumb|<center>'''  The [https://www.youtube.com/watch?v=P72qvMTRFO8 demolition of half of the I-64 Daniel Boone Bridge] built in the 1930s. Construction for the $111 million Boone Bridge project began in January 2013 and the new eastbound bridge opened to traffic in June. The 1980s bridge was then rehabilitated and opened to westbound traffic in November.     </center>  '''  ]]  
+
| [[image:Google search.png|200px|bottom|link=https://epg.modot.org/modot/EPG_GoogleSearch.html]]
 +
| [[image:recent_changes.png|200px|bottom|link=Recent Policy Changes in the EPG]]
 +
| [[image:TA_image.png|200px|bottom|link=616.8_Typical_Applications_(MUTCD_6H)#616.8.2.1_Typical_Applications]]
 +
| [[image:MASH_info.png|200px|bottom|link=https://epg.modot.org/files/c/ce/MASH_Implementation.pdf]]
 
|-
 
|-
|colspan="2" |    [[image:Main Page Feb 11, 2016.jpg|center|400px|thumb|<center>'''    Jody Geisendorfer (with Maintenance and Traffic) and Maint. Worker Bob Ledbetter produce sign log inspections at night. [[903.22 Construction Inspection Guidelines for Sec 903#Sign Inspection|Sign inspections]] determine whether signs are missing, adequately reflective, obscured by vegetation, vandalized, or are visibly out of plumb to a degree the general public would notice.    </center>  '''  ]]
 
 
|}
 
|}
  
MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as [[:Category:143 Practical Design|Practical Design]] and [[:Category:139 Design - Build|design-build]], were used to deliver those commitments and have made MoDOT a leader in the transportation industry.   
+
<div style="margin-top:12px; font-size:95%; padding:5px; border:1px solid black;background-color:white; color:black; border-radius:5px; box-shadow:5px 5px 5px #888888">
 
+
<b>MoDOT’s three pillars of “Safety, Service and Stability” steer our leadership and employees.  Our commitment to safety includes keeping both customers and ourselves safe.  Our service includes providing outstanding customer service, delivering transportation solutions of great value and using resources wisely.  Keeping roads and bridges in good condition, operating a reliable and convenient transportation system, and advancing Missouri’s economic development reflect our commitment to stability.<br/>Innovative concepts, such as [[:Category:143 Practical Design|Practical Design]] and [[:Category:139 Design - Build|design-build]], are used to deliver our commitments.  These and other forward-thinking concepts shape the content of the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related [https://modotgov.sharepoint.com/sites/br Bridge], [https://modotgov.sharepoint.com/sites/cm Construction], [https://modotgov.sharepoint.com/sites/DE/ Design], [https://modotgov.sharepoint.com/sites/ts Highway Safety & Traffic], [https://modotgov.sharepoint.com/sites/mt Maintenance], [https://modotgov.sharepoint.com/sites/tp Planning] and [https://modotgov.sharepoint.com/sites/DE/SitePages/Right-of-Way.aspx Right of Way] guidance.</b>
These forward-thinking, innovative concepts are reflected in the ''ENGINEERING POLICY GUIDE'' (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former [http://sharepoint/sites/de/RealEstate/SitePages/Home.aspx Right of Way], [http://sharepoint/sites/de/Pages/default.aspx Design], [http://sharepoint/systemdelivery/br/pages/default.aspx Bridge], [http://sharepoint/systemdelivery/cm/Pages/default.aspx Construction], [http://sharepoint/systemdelivery/tr/Pages/default.aspx Traffic] and [http://sharepoint/systemdelivery/mt/default.aspx Maintenance] manuals.
+
</div>
  
MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG.  Over 30 million hits on the EPG endorse this format to be easy to navigate and pleasing to read.  A small [[:Help:Contents|'''HELP ARTICLE''']] is included to assist with helpful hints on how to use the EPG as well as other points of interest.
+
{| style="width:100%; text-align:center; margin-top:12px;"
 
 
 
 
 
 
{| style="margin: 1em auto 1em auto" style="background-color: #F8F8FF"  
 
 
|-
 
|-
|colspan="2" |'''Perhaps you've wondered how many hits the most popular EPG articles have. As of late February, the numbers of hits are:'''
+
| [[image:Broken link.png|200px|bottom|link=mailto:engineering.policy@modot.mo.gov?Subject=Report%20a%20broken%20link&Body=Please%20include%20the%20broken%20link,%20article%20number%20and%20a%20screenshot%20if%20possible]]
 +
| [[image:Approval process.png|200px|bottom|link=Help_Article#EPS_Approval_Process]]
 +
| [[image:E-update.png|200px|bottom|link=Help_article#Signing_Up_for_E-Updates]]
 
|-
 
|-
|'''20.'''  [[:Category:136 Local Public Agency (LPA) Policy|EPG 136]], 128860    ||'''10.''' [[:Category:616 Temporary Traffic Control|EPG 616]], 177128
 
|-
 
|'''19.'''  [[:Category:134 Engineering Professional Services|EPG 134]], 130050    ||'''9.'''  [[:Category:600 INCIDENTAL CONSTRUCTION|EPG 600]], 212297
 
|-
 
|'''18.'''  [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]], 134899  ||'''8.'''  [[616.23 Traffic Control for Field Operations|EPG 616.23]], 231823
 
|-
 
|'''17.'''    [[751.50 Standard Detailing Notes|EPG 751.50]], 140860    ||'''7.''' [[:Category:101 Standard Forms|EPG 101]], 261973
 
|-
 
|'''16.'''    [[136.4 Consultant Selection and Consultant Contract Management|EPG 136.4]], 147572    ||'''6.'''  [[:Category:100 GENERAL|EPG 100]], 262172
 
|-
 
|'''15.'''    [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]], 150036    ||'''5.'''  [[:Category:700 STRUCTURES AND HYDRAULICS|EPG 700]], 269722
 
|-
 
|'''14.'''    [[751.5 Standard Details|EPG 751.5]], 154837      || '''4.''' [[:Category:900 TRAFFIC CONTROL|EPG 900]], 294963
 
|-
 
|'''13.'''    [[:Category:903 Highway Signing|EPG 903]], 159796    || '''3.''' [[136.12 Figures, Glossary and Other Useful Links|EPG 136.12]], 299179
 
|-
 
|'''12.'''  [[136.9 Plans, Specs and Estimates (PSE)|EPG 136.9]], 163622  ||'''2.''' [[:Category:751 LRFD Bridge Design Guidelines|EPG 751]], 347915
 
|-
 
|'''11.'''  [[:Category:200 GEOMETRICS|EPG 200]], 165810    ||'''1.''' EPG Main Page, 2266199
 
 
|}
 
|}
  
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
+
<div style="margin-top:12px; font-size:95%; padding:5px; border:1px solid black;background-color:white; color:black; border-radius:5px; box-shadow:5px 5px 5px #888888">
'''[[:Category:153 Agreements and Contracts|EPG 153 Agreements and Contracts]]'''
+
<b>The design concepts and criteria within the Engineering Policy Guide (EPG) are intended for use when designing new construction projects on new locations or designing reconstruction projects on existing locations. Projects on existing roadways call for a flexible, practical, and performance-based approach to design. The EPG encourages flexible and practical design, which emphasizes the role of the planning and design teams in determining appropriate design dimensions based on project-specific conditions and existing and future roadway performance, more than on meeting specific nominal design criteria. Although new design values and concepts may be presented throughout the EPG, this does not imply that existing roadways are unsafe, nor does it mandate the initiation of projects to improve existing roadwaysWhile the EPG does include nearly all engineering related aspects of roadway design and maintenance it is not all encompassing. The use of properly equipped and maintained vehicles, operated by a capable user, is also pertinent to the safe and efficient operation of a transportation facility.</b>
 
+
</div>
2/25/16: This new article provides details on each step and other important information needed to properly execute agreements.
 
 
 
'''Work Zone Capacity Analysis Update'''
 
 
 
2/25/16: In [[616.13 Work Zone Capacity, Queue and Travel Delay|EPG 616.13 Work Zone Capacity, Queue and Travel Delay]], the [[media:616.13 WZ Impact.xlsm|MoDOT Work Zone Impact Analysis Spreadsheet]] was updated. 
 
 
 
'''[[:Category:503 Bridge Approach Slabs|EPG 503 Bridge Approach Slabs]]'''
 
 
 
2/25/16: Criteria was added for repairing bridge approach slabs or replacing new approach slabs or simply not using them on rehabilitation, redeck and widening bridge jobs.  
 
 
 
[http://sharepoint/sites/de/Innovations/MASH/_layouts/WordViewer.aspx?id=/sites/de/Innovations/MASH/Shared%20Documents/Policy/Interim%20Guardrail%20Policy%20160208.docx&Source=http%3A%2F%2Fsharepoint%2Fsites%2Fde%2FInnovations%2FMASH%2FSitePages%2FHome%2Easpx%3FRootFolder%3D%252Fsites%252Fde%252FInnovations%252FMASH%252FShared%2520Documents%252FPolicy%26FolderCTID%3D0x0120000BEB177BA2B59343AB4EE196BF0D945B%26View%3D%7BBED0D136%2D81B1%2D4C0A%2DA8C1%2D0AFFF986FADB%7D&DefaultItemOpen=1 '''Interim Guardrail Policy''']
 
 
 
2/23/16: This important interim policy is now available at the top of [[606.1 Guardrail|EPG 606.1 Guardrail]].
 
 
 
'''END SCHOOL SPEED LIMIT Sign'''
 
 
 
2/19/16: In [[903.19 Signing for School Areas#Table 903.19.1 School Area Sign and Plaque Sizes|Table 903.19.1 School Area Sign and Plaque Sizes]], the appropriate size to be used for this sign has been added.
 
 
 
'''Right of Way Duties to Provide A-Date and Clearance on Design-Build Projects'''
 
 
 
2/8/16: New guidance was provided at [[236.3 Administration#Acquisition Authority and Project Funding for Design-Build Projects|EPG Acquisition Authority and Project Funding for Design-Build Projects]] and [[236.3 Administration#236.3.7.8 Design-Build Right of Way Clearance|EPG 236.3.7.8 Design-Build Right of Way Clearance]].
 
 
 
'''[[751.50 Standard Detailing Notes#(G1.7.1) Use for skewed bents.|Standard Detailing Note for Integral End Bents]]'''
 
 
 
2/3/16: Guidance in this note pertaining to #5-H (L shaped) approach slab anchorage bars, end of slab and fill face of end bent as well as in [[751.35 Concrete Pile Cap Integral End Bents#751.35.3.3 Prestressed Girder End Bent|EPG 751.35.3.3 Prestressed Girder End Bent]] through [[751.35 Concrete Pile Cap Integral End Bents#751.35.4.4 Skewed Bents|EPG 751.35.4.4 Skewed Bents]] was clarified.
 
 
 
'''[[751.50 Standard Detailing Notes#(B3.34) Use this temporary note|New Standard Detailing Note]]'''
 
 
 
1/25/16: New note, B3.34, prevents direct contact between different materials.
 
 
 
'''[[236.5 Property Management|EPG 236.5 Property Management]]'''
 
 
 
1/21/16: Numerous revisions were made so that this article now reflects current practice.
 
 
 
'''[[media:Fig 104.7 2015.doc|Cost Estimate Guide for Rural Preliminary Design]] '''
 
 
 
1/14/16: In [[104.7 Estimates|EPG 104.7 Estimates]], this document has been updated with figures reflecting new Maintenance Treatment per mile costs.
 
 
 
'''[[236.6 Appraisal and Appraisal Review#Manufactured Homes|Appraisal Considerations for Manufactured Homes]]'''
 
 
 
1/13/16:  Guidance was updated to current practice pertaining to how a mobile home is determined to be real or not real property.
 
 
 
'''[[:Category:712 Structural Steel Construction#712.1.5.3 Rotational-Capacity Testing and Installation of A325 Type 3 High Strength Bolts|EPG 712.1.5.3 Rotational-Capacity Testing and Installation of A325 Type 3 High Strength Bolts]]'''
 
 
 
1/11/16: This new subarticle provides best practices for bolt up testing. Guidance will provide a better quality product and reduce conflicts on acceptance criteria.
 
 
 
'''[[771.2 Bridge Cleaning and Flushing|EPG 771.2 Bridge Cleaning and Flushing]]'''
 
 
 
1/5/16: This article was revised to comply with the MDNR permit. Also, [[771.2 Bridge Cleaning and Flushing#Guidance on Aquatic Invasive Species Control BMPs|Guidance on Aquatic Invasive Species Control BMPs]] was added.
 
 
 
'''Deadline for Submitting Proposals to the Engineering Policy Group'''
 
 
 
1/5/16: The submittal deadlines have been moved up about a week in [[Help Article#EPG Ballot Cycles|EPG Ballot Cycles]].
 
 
 
'''[[643.4 Railroads|EPG 643.4 Railroads]]'''
 
 
 
12/30/15: Much of this article was revised to reflect current practices and to clarify coordination with the Multimodal Railroad group.   
 
 
 
'''[[127.29 Storm Water#Potential Storm Water Controls|Potential Storm Water Controls Table]]'''
 
 
 
12/30/15: This table was clarified and expanded.
 
 
 
'''[http://sharepoint/systemdelivery/TP/tms/Training%20Material/TMS%20Maps%20Training%20Material/TMS%20MAPS%20Instruction%20Manual.pdf TMS Maps User Guide]'''
 
 
 
12/23/15: This new guide explains [[:Category:145 Transportation Management Systems (TMS)|TMS]] and assists with the various tools available when mapping.
 
 
 
'''[[131.2 Proprietary Items and Public Interest Findings|EPG 131.2 Proprietary Items and Public Interest Findings]]'''
 
 
 
12/17/15: Guidance was revised to align with the MoDOT/FHWA oversight and partnering agreements. Revision ensures submitted items receive appropriate approvals.
 
 
 
'''[[:Category:110 State and Federal Wage Rates and Other Requirements#Required Notices and Posters|Required Notices and Posters]]'''
 
 
 
12/11/15: Several required posters and notices have been updated, including FHWA Form 1022, OSHA 3165, WH-1420 and the Unemployment Benefit Law.
 
 
 
'''[[147.3 Job Order Contracting (JOC)#JOC JSPs|Job Order Contracting (JOC)]]'''
 
 
 
12/10/15: Five of the JOC JSPs have been updated. Among the revisions, the unit costs have been fixed for 2016 and storm water compliance and new guardrail requirements have been added.
 
 
 
'''Federal Involvement'''
 
 
 
12/8/15: In a number of articles including [http://epg.modot.org/index.php?title=Category:128_Conceptual_Studies#128.10_Conceptual_Study_Report_Approval_and_Submittal EPG 128.10 Conceptual Study Report Approval and Submittal] and [http://epg.modot.org/index.php?title=131.1_Design_Exception_Process#131.1.3_Projects_of_Divisional_Interest EPG 131.1.3 Projects of Divisional Interest], terminology has been clarified to the current "federal involvement" (instead of "Full Oversight").
 
 
 
'''[[media:Fig 104.7 2015.doc|Cost Estimate Guide]]'''
 
 
 
12/3/15: The latest Cost Estimate Guide for rural preliminary design is available in [[104.7 Estimates|EPG 104.7 Estimates]].
 
 
 
'''Attachments by Others to MoDOT's Drainage System'''
 
 
 
11/30/15: Guidance for connections to MoDOT's drainage, as it relates to the MS4 permit, was clarified in [[127.25 Maintenance Environmental Policies#127.25.8.3.2 System Attachments by Others|EPG 127.25.8.3.2 System Attachments by Others]].
 
 
 
'''NOTICE Plaque (W16-18P)'''
 
 
 
11/30/15: In both [[903.6 Warning Signs#903.6.59 NOTICE Plaque (W16-18P) (MUTCD Section 2A.15)|EPG 903.6.59 NOTICE Plaque]] and [[903.5 Regulatory Signs#903.5.36 Weight Limit Signs (R12 Series) (MUTCD Section 2B.59)|EPG 903.5.36 Weight Limit Signs]], guidance for the NOTICE plaque has been added for use on bridge weight limit changes as well as an option for other regulatory signs. The plaque helps to emphasize bridge postings that are being lowered. 
 
 
 
'''[[:Category:941 Permits and Access Requests#Once Central Office Traffic conceptually|EPG 941.5 Request by a City to Construct a “WELCOME TO” Monument]]'''
 
  
11/25/15: The review and approval process was improved by revising when the categorical exclusion request will occur during the city "Welcome To" sign process.
+
<div style="margin-top:12px; background-color:black; color:white; border-radius:5px; box-shadow:5px 5px 5px #888888">
 +
<center>'''The Engineering Policy Guide is maintained via the use of Microsoft Edge.  For optimal viewing quality, please choose Microsoft Edge for your browser.'''</center>
 +
</div>

Latest revision as of 12:52, 12 September 2024


Our mission is to provide a world-class transportation system that is
safe, innovative, reliable and dedicated to a prosperous Missouri.


Google search.png Recent changes.png TA image.png MASH info.png

MoDOT’s three pillars of “Safety, Service and Stability” steer our leadership and employees. Our commitment to safety includes keeping both customers and ourselves safe. Our service includes providing outstanding customer service, delivering transportation solutions of great value and using resources wisely. Keeping roads and bridges in good condition, operating a reliable and convenient transportation system, and advancing Missouri’s economic development reflect our commitment to stability.
Innovative concepts, such as Practical Design and design-build, are used to deliver our commitments. These and other forward-thinking concepts shape the content of the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related Bridge, Construction, Design, Highway Safety & Traffic, Maintenance, Planning and Right of Way guidance.

Broken link.png Approval process.png E-update.png

The design concepts and criteria within the Engineering Policy Guide (EPG) are intended for use when designing new construction projects on new locations or designing reconstruction projects on existing locations. Projects on existing roadways call for a flexible, practical, and performance-based approach to design. The EPG encourages flexible and practical design, which emphasizes the role of the planning and design teams in determining appropriate design dimensions based on project-specific conditions and existing and future roadway performance, more than on meeting specific nominal design criteria. Although new design values and concepts may be presented throughout the EPG, this does not imply that existing roadways are unsafe, nor does it mandate the initiation of projects to improve existing roadways. While the EPG does include nearly all engineering related aspects of roadway design and maintenance it is not all encompassing. The use of properly equipped and maintained vehicles, operated by a capable user, is also pertinent to the safe and efficient operation of a transportation facility.

The Engineering Policy Guide is maintained via the use of Microsoft Edge. For optimal viewing quality, please choose Microsoft Edge for your browser.