Category:105 Control of Work: Difference between revisions

From Engineering Policy Guide
Jump to navigation Jump to search
establish location for new article
 
m updated formatting
 
(127 intermediate revisions by 4 users not shown)
Line 1: Line 1:
105.1 Construction Inspection Guidance for [http://www.modot.mo.gov/business/standards_and_specs/Sec0105.pdf Sec 105]
<div style="float: right; margin: 5px; margin-bottom: 10px; padding: 10px; border: 1px solid black; border-radius:5px; box-shadow:5px 5px 5px #888888">
<categorytree mode=all>105 Control of Work</categorytree>
</div>


This article is under construction
[[image:105.3.jpg|left|275px]]
 
<div style="float: right; margin-top: 5px; margin-left: 15px; width:355px; font-size: 95%; background-color: #f8f9fa; padding: 0.3em; border: 1px solid #a2a9b1; text-align:left;">
'''<u><center>Forms</center></u>'''
* [https://www.modot.org/traffic New Product Evaluation Form]
* [https://epg.modot.org/forms/CM/Digital_Signature_Delegation_Memo.dotx Delegation of Authority to Sign via Digital Signature]
* [https://epg.modot.org/forms/CM/Request_to_Subcontract_C_220.pdf Request to Subcontract Work (Form C-220)]
* [[media:105.3.9 Shifting State Highway Entrance pg1.jpg|Agreement for Shifting State Highway Entrance, page 1]]
* [[media:105.3.9 Shifting State Highway Entrance pg2.jpg|Agreement for Shifting State Highway Entrance, page 2]]
* [[media:105.3.9 Shifting State Highway Entrance pg3.jpg|Agreement for Shifting State Highway Entrance, page 3]]
* [[media:105.3.9 Shifting State Highway Entrance pg4.jpg|Agreement for Shifting State Highway Entrance, page 4]]
* [[media:105.3.9 Acknowledgment by Commission.jpg|Acknowledgment by Commission]]
* [[media:105.3.9 Acknowledgment by Individual.jpg|Acknowledgment by Individual]]
* [[media:105.3.9 Acknowledgment by Corporation.jpg|Acknowledgment by Corporation]]
</div>
 
The many aspects of control of work, including the responsibilities of the Resident Engineer, preconstruction conferences, duties of inspectors and acceptance of small quantities, are presented in this article. Also discussed is how the district construction and materials engineer  is directly responsible to the District Engineer and expected to operate as the District Engineer's representative.
 
 
[[Category:100_GENERAL]]

Latest revision as of 11:58, 1 May 2025

Forms

The many aspects of control of work, including the responsibilities of the Resident Engineer, preconstruction conferences, duties of inspectors and acceptance of small quantities, are presented in this article. Also discussed is how the district construction and materials engineer is directly responsible to the District Engineer and expected to operate as the District Engineer's representative.