Difference between revisions of "Main Page"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (EPG 754)
 
Line 1: Line 1:
[[Image:EPG 2013b.jpg|1080px|center]]
+
__NOTOC__
 +
<div style="margin-top:0px; margin-bottom:0px; background-color:black; border-radius:5px; box-shadow:5px 5px 5px #888888; border:1px solid black">
 +
<center>
 +
<div class="jcarousel-wrapper" style="margin-top:7px; margin-bottom:0px">
 +
<div class="jcarousel jcarousel-randomize">
 +
    <div class="jcarousel-list">
 +
        <div class="jcarousel-item">
 +
{{banner|direction=left|width=20%||section=Engineering Policy Guide|section-link=Main Page|image=EPG-001.png}}
 +
        </div>
 +
        <div class="jcarousel-item">
 +
{{banner|direction=left|width=40%||section=Engineering Policy Guide|section-link=Main Page|image=EPG-002.png}}
 +
        </div>
 +
        <div class="jcarousel-item">
 +
{{banner|direction=left|width=40%||section=Engineering Policy Guide|section-link=Main Page|image=EPG-007.png}}
 +
        </div>
 +
        <div class="jcarousel-item">
 +
{{banner|direction=left|width=40%||section=Engineering Policy Guide|section-link=Main Page|image=EPG-004.png}}
 +
        </div>
 +
        <div class="jcarousel-item">
 +
{{banner|direction=left|width=40%||section=Engineering Policy Guide|section-link=Main Page|image=EPG-005.png}}
 +
        </div>
 +
        <div class="jcarousel-item">
 +
{{banner|direction=left|width=40%||section=Engineering Policy Guide|section-link=Main Page|image=EPG-006.png}}
 +
        </div>
 +
        <div class="jcarousel-item">
 +
{{banner|direction=left|width=40%||section=Engineering Policy Guide|section-link=Main Page|image=EPG-003.png}}
 +
        </div>
 +
    </div>
 +
</div>
 +
</div>
 +
</center>
 +
</div>
  
 
+
{| style="text-align:center; margin-top:12px; margin-left: auto; margin-right: auto; font-style:italic; font-size:20px; font-family:Verdana, Geneva, sans-serif !important;"
{|style="padding: 0.3em; margin-left:0px; border:3px solid #a9a9a9; text-align:center; font-size: 100%; background:#E3D6AA" width="1080px" align="center"  
 
 
|-
 
|-
|rowspan="3" align="right" |'''<font color = "white"><font size = 4.7><i>HELPFUL EPG VIDEOS: </i></font color="white"></font size = 5>|| ||align="left"|''' '''<BIG><font color = "white"><i>[[media:Logging into the EPG.wmv|•Logging into the EPG]]</i></font color="white">
+
! style="padding-left:90px; padding-right:90px; |
|-
+
----
| ||align="left"|''' <BIG><font color = "white"><i>[[media:Help Finding EPG Info.wmv|•Finding Info in the EPG]]</i></font color="white">
+
Our mission is to provide a world-class transportation system that is</br>safe, innovative, reliable and dedicated to a prosperous Missouri.
|-
+
----
| ||align="left"|''' <Big><font color = "white"><i>[[media:Article History and Receiving.wmv|•Article History & How to Receive EMails When Articles are Revised]]</i></font color="white">
 
 
|}
 
|}
<div style="padding-bottom: .3em; margin: 0 .5em .5em"></div>
 
{| cellspacing="3"
 
|- valign="top" width="100%"
 
|style="border: 1px solid #696969; color: #000; background-color: #A9A9A9"|<big><center>'''<font color = "white"><i>WELCOME'''</i></font color="white"></center></big>
 
| valign="top" width="60%" cellspacing="3" cellpadding="3" style="border: 1px solid #FF8C00; background:#FFA500" align="center"|'''<big><font color="white"><i>RECENT POLICY CHANGES IN THE EPG</i></font color="white"></big>'''
 
|-
 
|valign="top" style="border: 1px solid #A9A9A9; color: #000; background-color: #F8F8FF"|
 
  
{| style="margin: 1em auto 1em auto"
+
{| style="width:100%; text-align:center; margin-top:0px;"
|colspan="2"|[[image:Main Page Feb 7, 2013.jpg|center|390px|thumb|<center>'''  Director Kevin Keith presents St. Robert Maintenance Crew Leader Arlis Humphrey with the Meritorious Safety Award for putting his own safety at risk to rescue an intoxicated, unresponsive man lying in the middle of Bus. 44 in Waynesville. The award is the highest safety award presented by MoDOT and the Commission. "I am just thankful that I saw him before anyone else did," said Humphrey. "I honestly believe he would have been run over if I hadn't been traveling there at that point in time."  '''</center>]]
 
 
|-
 
|-
|colspan="2"|[[image:Main Page 2 Feb 7, 2013.jpg|center|390px|thumb|<center>''' MoDOT Project Manager Allan Zafft (right foreground) and [http://cdmsmith.com/en-US/Solutions/Transportation.aspx CDM Smith] Principal Planner and Group Leader Chris Nazar (right background) host an [http://www.metroi70.com/ I-70 Second Tier EIS] mobile meeting at The Museums & Vine. Customers review plans and offer comments on three proposed alternatives: no-build, geometric improvements and interchange consolidations.  '''</center>]]
+
| [[image:Google search.png|200px|bottom|link=https://epg.modot.org/modot/EPG_GoogleSearch.html]]
 +
| [[image:recent_changes.png|200px|bottom|link=Recent Policy Changes in the EPG]]
 +
| [[image:TA_image.png|200px|bottom|link=616.8_Typical_Applications_(MUTCD_6H)#616.8.2.1_Typical_Applications]]
 +
| [[image:MASH_info.png|200px|bottom|link=https://epg.modot.org/files/c/ce/MASH_Implementation.pdf]]
 
|-
 
|-
|colspan="2"|[[image:Main Page 3 Feb 7, 2013.jpg|center|390px|thumb|<center>''' Seasonal Crew Worker Dustin Cutler, left, and Sr. Maintenance Worker Jim Snyder seal pavement cracks on Rte. 82 east of Osceola.  '''</center>]]
 
 
|}
 
|}
  
MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as [[:Category:143 Practical Design|Practical Design]] and [[:Category:139 Design - Build|design-build]], were used to deliver those commitments and have made MoDOT a leader in the transportation industry.
+
<div style="margin-top:12px; font-size:95%; padding:5px; border:1px solid black;background-color:white; color:black; border-radius:5px; box-shadow:5px 5px 5px #888888">
 +
<b>MoDOT’s three pillars of “Safety, Service and Stability” steer our leadership and employees.  Our commitment to safety includes keeping both customers and ourselves safe.  Our service includes providing outstanding customer service, delivering transportation solutions of great value and using resources wisely.  Keeping roads and bridges in good condition, operating a reliable and convenient transportation system, and advancing Missouri’s economic development reflect our commitment to stability.<br/>Innovative concepts, such as [[:Category:143 Practical Design|Practical Design]] and [[:Category:139 Design - Build|design-build]], are used to deliver our commitments.  These and other forward-thinking concepts shape the content of the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related [https://modotgov.sharepoint.com/sites/br Bridge], [https://modotgov.sharepoint.com/sites/cm Construction], [https://modotgov.sharepoint.com/sites/DE/ Design], [https://modotgov.sharepoint.com/sites/ts Highway Safety & Traffic], [https://modotgov.sharepoint.com/sites/mt Maintenance], [https://modotgov.sharepoint.com/sites/tp Planning] and [https://modotgov.sharepoint.com/sites/DE/SitePages/Right-of-Way.aspx Right of Way] guidance.</b>
 +
</div>
  
These forward-thinking, innovative concepts are reflected in the ''ENGINEERING POLICY GUIDE'' (EPG).  This document provides a single reference for all engineering and engineering-related guidance by combining the former [http://wwwi/intranet/rw/ Right of Way], [http://wwwi/design/default.htm Design], [http://wwwi/intranet/br/default.htm Bridge], [http://wwwi/intranet/cm/ Construction], [http://wwwi/intranet/tr/ Traffic] and [http://wwwi/maintenance/ Maintenance] manuals.
+
{| style="width:100%; text-align:center; margin-top:12px;"
 
 
MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG.  Millions of hits on the EPG endorse this format to be easy to navigate and pleasing to read.  A small [[:Help:Contents|'''HELP ARTICLE''']] is included to assist with helpful hints on how to use the EPG as well as other points of interest.
 
 
 
{| style="margin: 1em auto 1em auto"
 
|-
 
|[[image:Main Page Bridge 1 Jan 29, 2013.jpg|120px|center|thumb|<center>''' Preparing to splice girders '''</center>]]|| [[image:Main Page Bridge 3 Jan 29, 2013.jpg|120px|center|thumb|<center>''' Pre-assembling fasteners to connect bridge steel beams '''</center>]]|| [[image:Main Page Bridge 6 Jan 29, 2013.jpg|120px|center|thumb|<center>''' Conduits and MO tower from about halfway up the IL tower '''</center>]]
 
|-
 
|[[image:Main Page Bridge 4 Jan 29, 2013.jpg|120px|center|thumb|<center>''' View from atop IL bridge tower '''</center>]] ||[[image:Main Page Bridge 5 Jan 29, 2013.jpg|120px|center|thumb|<center>''' Top of the MO tower '''</center>]] || [[image:Main Page Bridge 2 Jan 29, 2013.jpg|120px|center|thumb|<center>''' Fastening steel '''</center>]]
 
|-
 
|colspan="6"|<center>''' [http://www.newriverbridge.org/ New Missouri River Bridge] <br/> Click a picture to enlarge '''</center>
 
|}
 
 
 
{| style="margin: 1em auto 1em auto" style="background-color: #F8F8FF"
 
|-
 
|colspan="2"|'''Perhaps you've wondered how many hits the most popular EPG articles have.  As of early February, the numbers of hits are:'''
 
|-
 
|'''20.''' [[:Category:1000 MATERIALS|EPG 1000]], 61043 ||'''10.''' [[:Category:101 Standard Forms|EPG 101]], 90040
 
|-
 
|'''19.''' [[136.12 Figures and Glossary|EPG 136.12]], 67548||'''9.''' [[:Category:616 Temporary Traffic Control|EPG 616]], 103081
 
|-
 
|'''18.''' [[751.13 Expansion Devices|EPG 751.13]], 68544 ||'''8.''' [[:Category:200 GEOMETRICS|EPG 200]], 114302
 
|-
 
|'''17.''' [[903.5 Regulatory Signs|EPG 903.5]], 71271||'''7.''' [[616.23 Traffic Control for Field Operations|EPG 616.23]], 120512
 
|-
 
|'''16.''' [[751.5 Standard Details|EPG 751.5]], 74173 ||'''6.''' [[:Category:600 INCIDENTAL CONSTRUCTION|EPG 600]], 138913
 
|-
 
|'''15.''' [[903.6 Warning Signs|EPG 903.6]], 76809 ||'''5.''' [[:Category:100 GENERAL|EPG 100]], 166797
 
 
|-
 
|-
|'''14.''' [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]], 77940||'''4.''' [[:Category:700 STRUCTURES AND HYDRAULICS|EPG 700]], 174123
+
| [[image:Broken link.png|200px|bottom|link=mailto:engineering.policy@modot.mo.gov?Subject=Report%20a%20broken%20link&Body=Please%20include%20the%20broken%20link,%20article%20number%20and%20a%20screenshot%20if%20possible]]
 +
| [[image:Approval process.png|200px|bottom|link=Help_Article#EPS_Approval_Process]]
 +
| [[image:E-update.png|200px|bottom|link=Help_article#Signing_Up_for_E-Updates]]
 
|-
 
|-
|'''13.''' [[:Category:400 FLEXIBLE PAVEMENT|EPG 400]], 79544  ||'''3.''' [[:Category:751 LRFD Bridge Design Guidelines|EPG 751]], 187972
 
|-
 
|'''12.''' [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]], 82339 ||'''2.''' [[:Category:900 TRAFFIC CONTROL|EPG 900]], 192484
 
|-
 
|'''11.'''  [[:Category:903 Highway Signing|EPG 903]], 87710 ||'''1.''' EPG Main Page, 971622
 
 
|}
 
|}
  
|valign="top" cellspacing="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
+
<div style="margin-top:12px; font-size:95%; padding:5px; border:1px solid black;background-color:white; color:black; border-radius:5px; box-shadow:5px 5px 5px #888888">
'''[[:Category:754 Bridge Engineering Assistance Program (BEAP)|EPG 754 Bridge Engineering Assistance Program (BEAP)]]'''
+
<b>The design concepts and criteria within the Engineering Policy Guide (EPG) are intended for use when designing new construction projects on new locations or designing reconstruction projects on existing locationsProjects on existing roadways call for a flexible, practical, and performance-based approach to designThe EPG encourages flexible and practical design, which emphasizes the role of the planning and design teams in determining appropriate design dimensions based on project-specific conditions and existing and future roadway performance, more than on meeting specific nominal design criteria. Although new design values and concepts may be presented throughout the EPG, this does not imply that existing roadways are unsafe, nor does it mandate the initiation of projects to improve existing roadwaysWhile the EPG does include nearly all engineering related aspects of roadway design and maintenance it is not all encompassing.  The use of properly equipped and maintained vehicles, operated by a capable user, is also pertinent to the safe and efficient operation of a transportation facility.</b>
 
+
</div>
2/8/13:  The [[media:754 BEAP Consultant Listing 2013.pdf|Current BEAP Consultant List (Appendix 1)]] has been updated.
 
 
 
'''Updated QRGs'''
 
 
 
2/8/13:  Five QRGs, [[media:change orders zero dollar.docx|Change Orders - Zero Dollar]], [[media:Change Orders Feb 2013.docx|Change Orders]], [[media:Change Orders – Mobilization and Contract Bond Feb 2013.docx|Change Orders – Mobilization and Contract Bond]], [[media:Change Orders – Time Adjustment Feb 2013.docx|Change Orders – Time Adjustment]] and [[media:Change Orders – Value Engineering Feb 2013.doc|Change Orders – Value Engineering]], were updated to coordinate with version 3.13 of SiteManager.
 
 
 
'''[[:Category:110 State and Federal Wage Rates and Other Requirements#110.3.1 Wage Interviews|EPG 110.3.1 Wage Interviews]]'''
 
 
 
2/5/13:  Since the SM Policy & Procedure Manual is no longer used, new guidance now gives direction on how wage rate interviews should be documented in SM.
 
 
 
'''Job Order Contracting (JOC)'''
 
 
 
2/5/14:  In [[147.3 Job Order Contracting (JOC)#147.3.5 Term Extension of Job Order Contracts|EPG 147.3.5 Term Extension of Job Order Contracts]], a minor clarification for contract extensions.  Also, [[147.3 Job Order Contracting (JOC)#147.3.9 Change Order Approval Levels for Job Order Contracts|EPG 147.3.9 Change Order Approval Levels for Job Order Contracts]] is new guidance for the change order approval process.
 
 
 
'''Term Extensions of Job Order Contracts'''
 
 
 
2/4/13: In [[147.3 Job Order Contracting (JOC)#147.3.5 Term Extension of Job Order Contracts|EPG 147.3.5 Term Extension of Job Order Contracts]], some deadlines were adjusted and guidance was provided on how to increase the performance contract bond.  Also, the [[147.3 Job Order Contracting (JOC)#JOC JSPs|Job Order Contracts JSPs]] were updated.
 
 
 
'''LPA Project Sponsor Eligibility'''
 
 
 
2/4/13: In [[136.1 Introduction#136.1.2.2 Project Sponsor Eligibility|EPG 136.1.2.2 Project Sponsor Eligibility]], the definition of an eligible sponsor for federal aid transportation projects was clarified.
 
 
 
'''Consultant Prequalification Requirements'''
 
 
 
2/1/13:  Consultants must be prequalified to be utilized as a consultant for a MoDOT or federally funded LPA projectIn [[:Category:134 Engineering Professional Services#134.1.3 Consultant Qualification|EPG 134.1.3 Consultant Qualification]] and [[:Category:134 Engineering Professional Services#134.2.2.5 Solicitation and Selection Step 5 – Selection of Consultant|EPG 134.2.2.5 Solicitation and Selection Step 5 – Selection of Consultant]], the criteria for prequalifying a consultant for MoDOT and LPA work was clarified.
 
 
 
'''[[:Category:110 State and Federal Wage Rates and Other Requirements#110.3 Prevailing Wages and Records (Guidance for Sec 110.3)|EPG 110.3 Prevailing Wages and Records]]'''
 
 
 
1/28/13:  Guidance, especially the "Payroll Checklist for Every Payroll", was revised to allow contractor payrolls to be electronically submitted to MoDOT.
 
 
 
'''Drip Bars'''
 
 
 
1/24/13:  New drip bar guidance, [[751.14 Steel Superstructure#751.14.5.9.1 Drip Bar Guidance|EPG 751.14.5.9.1 Drip Bar Guidance]],
 
and details, [[751.14 Steel Superstructure#751.14.5.9.2 Drip Bar Details|EPG 751.14.5.9.2 Drip Bar Details]], are now available.
 
 
 
'''Maintenance Environmental Policies for Sewage Disposal Systems'''
 
 
 
1/23/13: Guidance in [[127.25 Maintenance Environmental Policies#127.25.8.3.1 Industrial and Domestic Waste Waters on Right of Way|EPG 127.25.8.3.1 Industrial and Domestic Waste Waters on Right of Way]] and [[127.25 Maintenance Environmental Policies#127.25.8.3.2 System Attachments by Others|EPG 127.25.8.3.2 System Attachments by Others]] has been clarified.
 
 
 
'''[http://epg.modot.org/index.php?title=Category:134_Engineering_Professional_Services#134.2.2_Consultant_Solicitation_and_Selection_Process_-_Standard_Solicitation_Method EPG 134.2.2 Consultant Solicitation and Selection Process - Standard Solicitation Method]'''
 
 
 
1/22/13:  Clarification of when the list of short-listed consultants has to be approved by the Professional Sevices Committee in Steps 2, 4 and 5 of EPG 134.2.2.
 
 
 
'''FHWA Submittal for Preliminary Design of Bridges and Boxes'''
 
 
 
1/16/13: In [[751.1 Preliminary Design#751.1.2.31 FHWA Submittal|EPG 751.1.2.31 FHWA Submittal]], the flowchart was updated to conform with the latest FHWA/MoDOT stewardship/oversight agreement.
 
 
 
'''[[147.3 Job Order Contracting (JOC)#JOC JSPs|Job Order Contracting Guard Cable JSP]]'''
 
 
 
1/11/13: The lastest JOC guard cable JSP is now available.
 
 
 
'''[[106.3.2.59 TM-59, Determination of the International Roughness Index|TM-59, Determination of the International Roughness Index]]'''
 
 
 
1/10/13: TM-59 has been completely rewritten to comply with the revised Sec 610.
 
 
 
'''[[1055.4 Laboratory Testing Guidelines for Sec 1055#1055.4.1 Procedure|Laboratory Testing Guidelines for Concrete Curing]]'''
 
 
 
1/10/13: References to an AASHTO test were replaced with an ASTM test to bring the guidance into compliance with specs.
 
 
 
'''[[:Category:950 Automated Traffic Enforcement#950.2 Automated Enforcement of Speed Violations|EPG 950.2 Automated Enforcement of Speed Violations]]'''
 
 
 
1/10/13:  A useful checklist has been provided to help districts comply with policy.
 
 
 
'''[http://epg.modot.mo.gov/index.php?title=Category:Minor_Routes_Shouldering_Project_Guidelines#Constructability Constructability Guidelines for Minor Rtes. Shouldering Projects]'''
 
 
 
1/10/13:  Additional guidance has been provided to quantify, estimate and pay for grading.
 
 
 
'''[[147.3 Job Order Contracting (JOC)#JOC JSPs|Job Order Contracting JSPs]]'''
 
 
 
1/4/13: Most of the JSPs have been updated.  In the near future, the guard cable JSP will also be updated.
 
 
 
'''[[:Category:105 Control of Work#105.23 Quality Management|EPG 105.23 Quality Management]] (QM)'''
 
 
 
12/31/12:  This new subarticle provides very general QM info, although much more information will follow. QM is now included in almost all projects. It is not optional and is part of the Bolder Five-Year Direction.
 
 
 
'''Class 3 Excavation'''
 
 
 
12/20/12: [[:Category:206 Excavation for Structures#206.2 Class 3 Excavation|EPG 206.2 Class 3 Excavation]] was revised to provide pay quantities that allow the contractor to bid more accurately.
 
 
 
'''[[media:Sample Record General December 2012.docx|Sample Record General Information]]'''
 
 
 
12/18/12: This QRG has been updated due to revisions in internal computing processes.
 
 
 
'''[[903.5 Regulatory Signs#903.5.30 Traffic Signal Signs (R10-3, R10-5 through R10-30) (MUTCD Sections 2B.53 and 2B.54)|EPG 903.5.30 Traffic Signal Signs (R10-3, R10-5 through R10-30)]]'''
 
 
 
12/18/12: The guidance in EPG 903.5.20 was generally clarified and references to two signs, R10-15 and R10-30, were added.
 
 
 
'''[[606.2 Guard Cable#606.2.3 Warrants|EPG 606.2.3.3 Median Width]]'''
 
 
 
12/18/12: Guidance on the effect of median width on cable warrants has been clarified.
 
 
 
'''[[:Category:172 Maintenance Facility Performance Expectations Environmental Compliance|EPG 172 Maintenance Facility Performance Expectations Environmental Compliance]]'''
 
 
 
12/12/12: In [[:Category:172 Maintenance Facility Performance Expectations Environmental Compliance#172.10 Spill Prevention Control Countermeasure (SPCC)|EPG 172.10 Spill Prevention Control Countermeasure (SPCC)]], a link to tools to assist with SPCC plan development was added.  Minor clarifications were also made in EPG 172.10 and [[:Category:172 Maintenance Facility Performance Expectations Environmental Compliance#172.11 SPCC and Various Statewide Issues|EPG 172.11 SPCC and Various Statewide Issues]].
 
 
 
'''[[:Category:134 Engineering Professional Services|EPG 134 Engineering Professional Services]]'''
 
  
12/11/12: Numerous group email addresses were added to guidance. Also, in [[:Category:134 Engineering Professional Services#134.4 Contract Approval, Execution and Distribution|EPG 134.4 Contract Approval, Execution and Distribution]] the distribution and number of copies of executed contracts was adjusted.
+
<div style="margin-top:12px; background-color:black; color:white; border-radius:5px; box-shadow:5px 5px 5px #888888">
 +
<center>'''The Engineering Policy Guide is maintained via the use of Microsoft Edge. For optimal viewing quality, please choose Microsoft Edge for your browser.'''</center>
 +
</div>

Latest revision as of 12:52, 12 September 2024


Our mission is to provide a world-class transportation system that is
safe, innovative, reliable and dedicated to a prosperous Missouri.


Google search.png Recent changes.png TA image.png MASH info.png

MoDOT’s three pillars of “Safety, Service and Stability” steer our leadership and employees. Our commitment to safety includes keeping both customers and ourselves safe. Our service includes providing outstanding customer service, delivering transportation solutions of great value and using resources wisely. Keeping roads and bridges in good condition, operating a reliable and convenient transportation system, and advancing Missouri’s economic development reflect our commitment to stability.
Innovative concepts, such as Practical Design and design-build, are used to deliver our commitments. These and other forward-thinking concepts shape the content of the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related Bridge, Construction, Design, Highway Safety & Traffic, Maintenance, Planning and Right of Way guidance.

Broken link.png Approval process.png E-update.png

The design concepts and criteria within the Engineering Policy Guide (EPG) are intended for use when designing new construction projects on new locations or designing reconstruction projects on existing locations. Projects on existing roadways call for a flexible, practical, and performance-based approach to design. The EPG encourages flexible and practical design, which emphasizes the role of the planning and design teams in determining appropriate design dimensions based on project-specific conditions and existing and future roadway performance, more than on meeting specific nominal design criteria. Although new design values and concepts may be presented throughout the EPG, this does not imply that existing roadways are unsafe, nor does it mandate the initiation of projects to improve existing roadways. While the EPG does include nearly all engineering related aspects of roadway design and maintenance it is not all encompassing. The use of properly equipped and maintained vehicles, operated by a capable user, is also pertinent to the safe and efficient operation of a transportation facility.

The Engineering Policy Guide is maintained via the use of Microsoft Edge. For optimal viewing quality, please choose Microsoft Edge for your browser.