Difference between revisions of "Main Page"

From Engineering_Policy_Guide
Jump to navigation Jump to search
Line 1: Line 1:
[[Image:Engineering Policy Guide.jpg|center]]
+
[[Image:EPG.jpg|1080px|center]]
  
  
{|style="padding: 0.3em; margin-left:0px; border:3px solid #a9a9a9; text-align:center; font-size: 110%; background:#cccc89" width="814px" align="center"  
+
{|style="padding: 0.3em; margin-left:0px; border:3px solid #a9a9a9; text-align:center; font-size: 110%; background:#E3D6AA" width="1054px" align="center"  
 
|-
 
|-
 
|rowspan="3" align="right" |'''<font color = "white"><font size = 4.7><i>HELPFUL EPG VIDEOS: </i></font color="white"></font size = 5>|| ||align="left"|''' '''<BIG><font color = "white"><i>[[media:Logging into the EPG.wmv|•Logging into the EPG]]</i></font color="white">
 
|rowspan="3" align="right" |'''<font color = "white"><font size = 4.7><i>HELPFUL EPG VIDEOS: </i></font color="white"></font size = 5>|| ||align="left"|''' '''<BIG><font color = "white"><i>[[media:Logging into the EPG.wmv|•Logging into the EPG]]</i></font color="white">
Line 17: Line 17:
 
|-
 
|-
 
|valign="top" style="border: 1px solid #A9A9A9; color: #000; background-color: #F8F8FF"|
 
|valign="top" style="border: 1px solid #A9A9A9; color: #000; background-color: #F8F8FF"|
[[image:903.12.2.jpg|300px|center|thumb|<center>'''Joplin faced a EF5 tornado on May 22nd. If you would like to make a donation to District 7 employees, please send checks to:
+
[[image:Main Page July 18, 2011.jpg|380px|center|thumb|<center>'''Jeff Lewis, Maintenance Supervisor in the NW District, works in the heat installing [http://www.youtube.com/user/modotvideo#p/u/4/gHjlKEqJQ8M Big Bags] (large sand bags with 15' long x 3' x 3compartments) along Rte. 65 in Carroll County to hold back Missouri River flooding.'''</center>]]
 
 
'''D7 Highway Credit Union, 3929 E. 7th Street, Suite A, Joplin, MO 64801.
 
 
 
'''Make checks payable to the D7 Highway Credit Union and reference D7 Employee Fund in the memo.'''</center>]]
 
  
 
{| style="margin: 1em auto 1em auto"
 
{| style="margin: 1em auto 1em auto"
 
|-
 
|-
|[[image:Main Page Aug 30, 2011.jpg|420px|center]]||[[image:Main Page a Aug 30, 2011.jpg|150px||center]]
+
|[[image:Main Page 2a June 8, 2011.jpg|150px|center]]||[[image:Main Page 2b June 8, 2011.jpg|150px|center]]
 +
|-
 +
|colspan="2" align="center"|'''Historic flooding in District 10
 
|-
 
|-
|colspan="2"|'''Work on the Ameilia Earhart Memorial Bridge continues even while the Missouri River remains well above flood stageIn the photo on the left, Atchison, KS is in the background.
+
|colspan="2"|'''Mntc. Supt. Eugene Davis, Proj. Man. Eric Krapf and Dist. Engr. Mark Shelton discuss the I-55 condition at St. John's Bayou (left)Many other routes in District 10 presented challenges, including Route 60 at Fisk (right).  District 10 crews kept the route open.'''
 
|}
 
|}
  
Line 35: Line 33:
  
 
MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG.  Millions of hits on the EPG endorse this format to be easy to navigate and pleasing to read.  A small [[:Help:Contents|'''HELP ARTICLE''']] is included to assist with helpful hints on how to use the EPG as well as other points of interest.  
 
MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG.  Millions of hits on the EPG endorse this format to be easy to navigate and pleasing to read.  A small [[:Help:Contents|'''HELP ARTICLE''']] is included to assist with helpful hints on how to use the EPG as well as other points of interest.  
[[image:Main Page 3 June 8, 2011.jpg|300px|center|thumb|<center>'''Lebanon Intermediate Maintenance Worker Brent Jones is part of a crew repairing roadway edges on I-44 east of Lebanon.'''</center>]]
+
[[image:Main Page 3 Jul 27, 2011.jpg|380px|center|thumb|<center>'''Alton Thomas, St. Louis District Maintenance Crew Leader, changes the I-270 variable speed limit signs to be advisory speeds.'''</center>]]
  
[[image:Main Page 4 June 2011.jpg|300px|center|thumb|<center>'''Rich Bearden, D5 Electrician, rewires a traffic head for a flashing yellow arrow on Route F in Fulton.'''</center>]]
+
[[image:903.12.2.jpg|380px|center|thumb|<center>'''Joplin faced a EF5 tornado on May 22nd. If you would like to make a donation to District 7 employees, please send checks to: D7 Highway Credit Union, 3929 E. 7th Street, Suite A, Joplin, MO 64801. Make checks payable to the D7 Highway Credit Union and reference D7 Employee Fund in the memo.'''</center>]]
 
{| style="margin: 1em auto 1em auto" style="border: 2px solid #696969; color: #000; background-color: #A9A9A9"
 
{| style="margin: 1em auto 1em auto" style="border: 2px solid #696969; color: #000; background-color: #A9A9A9"
 
|-
 
|-
Line 46: Line 44:
  
 
|valign="top" cellspacing="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 
|valign="top" cellspacing="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
'''Junkyard Forms'''
+
'''[[236.18 Local Public Agency Land Acquisition|EPG 236.18 Local Public Agency Land Acquisition]]'''
  
6/17/11: [[236.17 Junkyards|EPG 236.17 Junkyards]] has been updated with several renamed and revised forms.
+
8/30/11: Right of Way has generally clarified and updated this article's guidance and its forms.
  
'''[[236.16 Outdoor Advertising|EPG 236.16 Outdoor Advertising]]'''
+
'''[[:Category:409 Seal Coat#Seal coats/chip seals|Contract Seal Coat]]'''
  
6/17/11: Many of the Right of Way forms have been updated and several new ones have been added.
+
8/29/11: Links to Contract Seal Coat guidelines, JSP and templates have been added.
  
'''[[:Category:402 Bituminous Surface Leveling|Contract Leveling Courses]]'''
+
'''[[:Category:172 Maintenance Facility Performance Expectations Environmental Compliance#172.12 SPCC and Portable Tank Storage|EPG 172.12 SPCC and Portable Tank Storage]] and [[127.25 Maintenance Environmental Policies#127.25.7.2 When a Product Becomes a Waste|EPG 127.25.7.2 When a Product Becomes a Waste]]'''
  
6/7/11:  Most of the sheets in the Traffic Control CLC Templates were updated to be in line with current guidance. CLC Guidelines and JSP were also updated.
+
8/17/11:  New guidance is available for Spill Prevention Control and Countermeasure Plan (SPCC), portable tank storage and hazardous waste.
  
'''[[:Category:619 Pavement Edge Treatment|Pavement Edge Treatment]]'''
+
'''[[136.6 Consultant Contracts|EPG 136.6 Consultant Contracts]]'''
  
6/17/11: Pavement Edge Treatment info was moved from EPG 616.17 to this new article to coordinate with pay items.  
+
8/17/11: Fig. 136.6.1, Fig. 136.6.2 and Fig. 136.6.7 were updated and the new Engineering Services Sample Invoice spreadsheet was added.
  
'''System I Protective Coating'''
+
'''[[127.28 Linking Planning and the National Environmental Policy Act (NEPA)|EPG 127.28 Linking Planning and the NEPA]]'''
  
6/13/11:  Guidance has been added to [[751.14 Steel Superstructure#751.14.5.8 Protective Coating Requirements|EPG 751.14.5.8]] and [[751.50 Standard Detailing Notes#A4. Protective Coatings|EPG 751.50]] to accommodate this new system.
+
8/11/11:  This new article explains how MoDOT and the MPOs link planning and NEPA to fulfill the planning requirements for SAFETEA-LU.
  
'''EPG 751 Revisions'''
+
'''Design's Submittal of the PS&E'''
  
6/13/11: The limits were corrected for "No Wearing Surface" cantilevers in [[751.10 General Superstructure#No Wearing Surface:|EPG 751.10.3.2]] (to less than 3'-8"); in [[751.22 P/S Concrete I Girders#PART SECTION SHOWING|EPG 751.22.3.13]] the size of the diaphragm was clarified in the "Part Section Showing Interm't Diaphragms" figure; in [[751.37 Drilled Shafts#751.37.6.1 Reinforcement Design|EPG 751.6.1]] guidance for minimum spacing was added; a suggested range in [[751.37 Drilled Shafts#751.37.6.2 Longitudinal Reinforcement|EPG 751.37.6.2]] was removed;  and in [[751.37 Drilled Shafts#751.37.6.7 Shear Resistance|EPG 751.37.6.7]] the V<sub>s</sub> equation was corrected.
+
8/11/11: Guidance for how Design submits the PS&E using the new BTP Plus software has been updated, primarily in [[237.9 Submission of Plans and Supporting Documents#237.9.6.2 PS&E Submittal Package|EPG 237.9.6.2]], [[237.9 Submission of Plans and Supporting Documents#237.9.6.3.3 Specifications and Estimate Folder|EPG 237.9.6.3.3]] and [[237.9 Submission of Plans and Supporting Documents#237.9.6.4 Electronic JSP Review and Submittal Process, Roadway|EPG 237.9.6.4]].
  
'''[[136.10 Construction Authorization and Letting#136.10.14 Request for Concurrence|EPG 136.10.14 Request for Concurrence]]
+
'''[[751.14 Steel Superstructure#751.14.3.4 Wide Flange Splice Tables|EPG 751.14.3.4 Wide Flange Splice Tables]]'''
 +
 +
7/22/11: The total number of bolts have been updated in the 27", 30", 33", 36" and 40" Wide Flange Splice tables.
  
6/10/11: Expanded guidance has been provided for an LPA's request for concurrence.
+
'''Contract and Line Item Adjustments QRGs'''
  
'''[[907.3 Travel Safe Zones#Recommendations|EPG 907.3 Travel Safe Zones]]
+
7/8/11: Two new Quick Reference Guides, [[:Category:109 Measurement and Payment#109.14 Price Adjustment for Fuel (for Sec 109.14)|Contract Adjustments and Line Item Adjustments]], to assist in the SM payment estimate process is available. They are also listed with the other QRGs in [[:Category:101 Standard Forms#Quick Reference Guides (QRGs)|EPG 101 Standard Forms]].
  
6/7/11: Traffic Safety Quality Circle recommends a minimum length of 1 mile for the Travel Safe Zones.
+
'''Bidding on Highway Construction Projects'''
  
'''[[:Category:110 State and Federal Wage Rates and Other Requirements#Resource Manual for Equal Opportunity Contract Compliance|Resource Manual for Equal Opportunity Contract Compliance]]'''
+
7/7/11: General guidelines for bidding on construction projects, as well as many useful links, are now included in [[:Category:102 Bidding Requirements and Conditions#Doing Business with MoDOT Bidding|EPG 102 Bidding Requirements and Conditions]].
  
6/1/11: External Civil Rights has updated this resource containing detailed information concerning E.E.O. matters.
+
'''[[236.6 Appraisal and Appraisal Review#Highest and Best Use Analysis After Acquisition|Highest and Best Use Analysis After Acquisition]]'''
  
'''[[141.4 Transportation Improvement Program Amendments|EPG 141.4 Transportation Improvement Program Amendments]]'''
+
7/6/11: Guidance has been expanded about elements to be considered by the appraiser when determining the highest and best use of property.
  
5/12/11: Transportation Planning has provided new guidance for TIP amendments.
+
'''Sight Distance for Entrances'''
  
'''[[:Category:235 Preliminary Plans#235.2.3 Project Agreements|EPG 235.2.3 Project Agreements]]'''
+
6/23/11: [[941.19 Sight Distance for Entrances|EPG 941.19 Sight Distance for Entrances]] has been re-written to present a single set of intersection sight distance values that both apply to  designed plans and are permitted in the field.
  
5/5/11:  The number of copies of the project agreement has been reduced to four. Additional guidance has also been provided about the agreement's distribution.
+
'''[[616.30 Work Zone Capacity, Queue and Travel Delay|EPG 616.30 Work Zone Capacity, Queue and Travel Delay]]'''
  
'''Engineering Professional Services'''
+
6/23/11: Traffic has expanded and moved to this new article info pertaining to work zone software and strategies to predict and alleviate queues and delay.
  
5/4/11:  Several forms were updated in [[:Category:134 Engineering Professional Services#134.3 Engineering Professional Services Guidelines|EPG 134.3 Engineering Professional Services Guidelines]].
+
'''[[616.13 Crossovers, Temporary Connections and Detours|EPG 616.13 Crossovers, Temporary Connections and Detours]]'''
  
'''[[821.19 Problem Weeds#Table 821.19 Recommended Products and Rates|EPG 821.19 Problem Weeds]]'''
+
6/22/11:  Designers are given the option to eliminate detours of closed routes having less than 400 AADT.  New guidance is also provide for using public info and advance turn signs to ameliorate the impact of closing the road in [[616.2 Work Zone Signing and Applications#616.2.5 Detour and Alternate Route Signing|EPG 616.2.5 Detour and Alternate Route Signing]].
  
5/3/11: The recommended products and rates for some problem weeds have been updated.
+
'''[[616.2 Work Zone Signing and Applications#616.2.9 Flags and Advance Warning Rail System|EPG 616.2.9 Flags and Advance Warning Rail System]]'''
  
'''[[751.8 LRFD Concrete Box Culverts|EPG 751.8 LRFD Concrete Box Culverts]]'''
+
6/22/11: Flags are required on all active signs in the first advance warning areas for daytime operations only. Nighttime use of flags is not prohibited.
  
5/3/11:  FHWA mandates that all bridges and foundations be designed in accordance with LRFD Bridge Design specs.  This new article replaces EPG 751.8 LFD Culverts, that presented ''LFD Bridge Design Manual'' info.
+
'''[[616.23 Traffic Control for Field Operations#Direction indicator barricades|Direction Indicator Barricades]] (DIBs) Guidance'''
  
'''[[751.39 Seal Course|EPG 751.39 Seal Course]]'''
+
6/22/11:  DIBs should be used for long-term and may be used in short-term stationary projects.
  
4/29/11: Bridge has updated the design method.  
+
'''[[233.3 Roundabouts|Review of Roundabout Designs]]'''
  
'''[http://epg.modot.org/index.php?title=751.10_General_Superstructure#751.10.15_Deck_Concrete_Finishing EPG 751.10.15 Deck Concrete Finishing]'''
+
6/22/11:  Traffic and Design divisions will now review preliminary layouts of all roundabouts.
  
4/29/11: New guidance is now available allowing the use of vibratory screeds for finishing bridge decks.
+
'''[[:Category:1019 Cement#1019.5.4 Cement Processing Additions|EPG 1019.5.4 Cement Processing Additions]]'''
  
'''[[751.1 Preliminary Design#751.1.1.5 Routine New Bridge Design Schedule (Nonseismic)|EPG 751.1.1.5 Routine New Bridge Design Schedule (Nonseismic)]]
+
6/22/11:  AASHTO M 327 and M 85 now specified due to AASHTO and ASTM synchronizing their specs.
  
4/29/11: A new bridge design schedule has been added.
+
'''[[131.1 Design Exception Process#If the design exception request|EPG 131.1 Design Exception Process]]'''
  
'''[[616.21 Work Zone Technician Training|Work Zone Technician Training]]'''
+
6/22/11:  Design exceptions are now to be analyzed for safety where the AASHTO ''Highway Safety Manual'' allows.
  
4/28/11: EPG 616.21 has been updated with the link to the latest WZ training info.
+
'''[[:Category:822 Roadside Vegetation Management|EPG 822 Roadside Vegetation Management]]'''
  
'''Access Justification Report (AJR) Guidance'''
+
6/22/11:  Guidance in EPG 822 has been generally re-written to reflect Practical Operations.
  
4/22/11: To comply with FHWA practices, AJR info has been updated in [[127.14 National Environmental Policy Act (NEPA) Classification and Documents#127.14.3.6 Projects Involving New or Revised Interstate Access|EPG 127.14.3.6]], [[:Category:234 Interchanges|EPG 234]], [[234.6 Diverging Diamond Interchanges#234.6.5.1 Access Justification Report (AJR)|EPG 234.6.5.1]] and [[:Category:240 Maintenance and Emergency Crossovers|EPG 240]].  Also, [[234.1 Access to Interstate Highways|EPG 234.1 Access to Interstate Highways]] was generally re-written and re-titled.
+
'''Junkyard Forms'''
  
'''[[616.23 Traffic Control for Field Operations|TA-2 and TA-3 Updated]]'''
+
6/17/11: [[236.17 Junkyards|EPG 236.17 Junkyards]] has been updated with several renamed and revised forms.
  
4/21/11:  Sight distance guidance was clarified in TA-2 and TA-3 of the TCFO.
+
'''[[236.16 Outdoor Advertising|EPG 236.16 Outdoor Advertising]]'''
  
'''[[:Category:403 Asphaltic Concrete Pavement|EPG 403 Asphaltic Concrete Pavement]]'''
+
6/17/11: Many of the Right of Way forms have been updated and several new ones have been added.
  
4/19/11: Two figures, QA/QC Questions and Answers and Asphalt Cement Price Index Example Calculations, were updated.
+
'''[[:Category:402 Bituminous Surface Leveling|Contract Leveling Courses]]'''
  
'''[[903.7 Conventional Road Guide Signs#903.7.64 Stream Name Signs (I-3)|EPG 903.7.64 Stream Name Signs (I-3)]]'''
+
6/7/11:  Most of the sheets in the Traffic Control CLC Templates were updated to be in line with current guidance. CLC Guidelines and JSP were also updated.
  
4/18/11: Clarification of stream name signing policy.
+
'''[[:Category:619 Pavement Edge Treatment|Pavement Edge Treatment]]'''
  
'''[[:Category:144 Practical Operations|EPG 144 Practical Operations]]'''
+
6/17/11: Pavement Edge Treatment info was moved from EPG 616.17 to this new article to coordinate with pay items.  
 
4/14/11: Expanded guidance is available for [[:Category:144 Practical Operations#144.1 Winter Operations Changes|winter operations]], [[:Category:144 Practical Operations#144.4 Mowing Operations Changes|mowing]] and [[:Category:144 Practical Operations#144.5 Pavement Maintenance|pavement maintenance]].
 
  
'''[http://epg.modot.org/index.php?title=Category:135_The_Section_106_Process#Section_106_Process_for_LPAs_Flowchart Section 106 Process for LPAs Flowchart]'''
+
'''System I Protective Coating'''
  
4/11/11:  This flowchart in EPG 135 was updated to correctly show interaction with the State Historical Preservation Office (SHPO).
+
6/13/11:  Guidance has been added to [[751.14 Steel Superstructure#751.14.5.8 Protective Coating Requirements|EPG 751.14.5.8]] and [[751.50 Standard Detailing Notes#A4. Protective Coatings|EPG 751.50]] to accommodate this new system.
  
'''Culvert Pipes'''
+
'''EPG 751 Revisions'''
  
4/11/11: [[750.7 Non-Hydraulic Considerations#750.7.2 Types|EPG 750.7.2]] was revised to show that all crossroad culvert pipes are now specified by group rather than individual type. Acceptable groups are based on the traffic volume of the facility.
+
6/13/11: The limits were corrected for "No Wearing Surface" cantilevers in [[751.10 General Superstructure#No Wearing Surface:|EPG 751.10.3.2]] (to less than 3'-8"); in [[751.22 P/S Concrete I Girders#PART SECTION SHOWING|EPG 751.22.3.13]] the size of the diaphragm was clarified in the "Part Section Showing Interm't Diaphragms" figure; in [[751.37 Drilled Shafts#751.37.6.1 Reinforcement Design|EPG 751.6.1]] guidance for minimum spacing was added; a suggested range in [[751.37 Drilled Shafts#751.37.6.2 Longitudinal Reinforcement|EPG 751.37.6.2]] was removed;  and in [[751.37 Drilled Shafts#751.37.6.7 Shear Resistance|EPG 751.37.6.7]] the V<sub>s</sub> equation was corrected.

Revision as of 13:59, 30 August 2011

EPG.jpg


HELPFUL EPG VIDEOS: •Logging into the EPG
•Finding Info in the EPG
•Article History & How to Receive EMails When Articles are Revised
WELCOME
RECENT POLICY CHANGES IN THE EPG
Jeff Lewis, Maintenance Supervisor in the NW District, works in the heat installing Big Bags (large sand bags with 15' long x 3' x 3' compartments) along Rte. 65 in Carroll County to hold back Missouri River flooding.
Main Page 2a June 8, 2011.jpg
Main Page 2b June 8, 2011.jpg
Historic flooding in District 10
Mntc. Supt. Eugene Davis, Proj. Man. Eric Krapf and Dist. Engr. Mark Shelton discuss the I-55 condition at St. John's Bayou (left). Many other routes in District 10 presented challenges, including Route 60 at Fisk (right). District 10 crews kept the route open.

MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as Practical Design and design-build, were used to deliver those commitments and have made MoDOT a leader in the transportation industry.

These forward-thinking, innovative concepts are reflected in the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former Right of Way, Design, Bridge, Construction, Traffic and Maintenance manuals.

MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG. Millions of hits on the EPG endorse this format to be easy to navigate and pleasing to read. A small HELP ARTICLE is included to assist with helpful hints on how to use the EPG as well as other points of interest.

Alton Thomas, St. Louis District Maintenance Crew Leader, changes the I-270 variable speed limit signs to be advisory speeds.
Joplin faced a EF5 tornado on May 22nd. If you would like to make a donation to District 7 employees, please send checks to: D7 Highway Credit Union, 3929 E. 7th Street, Suite A, Joplin, MO 64801. Make checks payable to the D7 Highway Credit Union and reference D7 Employee Fund in the memo.
FASTforward
Connect to the most recent and innovative business, policy and engineering solutions at MoDOT!

EPG 236.18 Local Public Agency Land Acquisition

8/30/11: Right of Way has generally clarified and updated this article's guidance and its forms.

Contract Seal Coat

8/29/11: Links to Contract Seal Coat guidelines, JSP and templates have been added.

EPG 172.12 SPCC and Portable Tank Storage and EPG 127.25.7.2 When a Product Becomes a Waste

8/17/11: New guidance is available for Spill Prevention Control and Countermeasure Plan (SPCC), portable tank storage and hazardous waste.

EPG 136.6 Consultant Contracts

8/17/11: Fig. 136.6.1, Fig. 136.6.2 and Fig. 136.6.7 were updated and the new Engineering Services Sample Invoice spreadsheet was added.

EPG 127.28 Linking Planning and the NEPA

8/11/11: This new article explains how MoDOT and the MPOs link planning and NEPA to fulfill the planning requirements for SAFETEA-LU.

Design's Submittal of the PS&E

8/11/11: Guidance for how Design submits the PS&E using the new BTP Plus software has been updated, primarily in EPG 237.9.6.2, EPG 237.9.6.3.3 and EPG 237.9.6.4.

EPG 751.14.3.4 Wide Flange Splice Tables

7/22/11: The total number of bolts have been updated in the 27", 30", 33", 36" and 40" Wide Flange Splice tables.

Contract and Line Item Adjustments QRGs

7/8/11: Two new Quick Reference Guides, Contract Adjustments and Line Item Adjustments, to assist in the SM payment estimate process is available. They are also listed with the other QRGs in EPG 101 Standard Forms.

Bidding on Highway Construction Projects

7/7/11: General guidelines for bidding on construction projects, as well as many useful links, are now included in EPG 102 Bidding Requirements and Conditions.

Highest and Best Use Analysis After Acquisition

7/6/11: Guidance has been expanded about elements to be considered by the appraiser when determining the highest and best use of property.

Sight Distance for Entrances

6/23/11: EPG 941.19 Sight Distance for Entrances has been re-written to present a single set of intersection sight distance values that both apply to designed plans and are permitted in the field.

EPG 616.30 Work Zone Capacity, Queue and Travel Delay

6/23/11: Traffic has expanded and moved to this new article info pertaining to work zone software and strategies to predict and alleviate queues and delay.

EPG 616.13 Crossovers, Temporary Connections and Detours

6/22/11: Designers are given the option to eliminate detours of closed routes having less than 400 AADT. New guidance is also provide for using public info and advance turn signs to ameliorate the impact of closing the road in EPG 616.2.5 Detour and Alternate Route Signing.

EPG 616.2.9 Flags and Advance Warning Rail System

6/22/11: Flags are required on all active signs in the first advance warning areas for daytime operations only. Nighttime use of flags is not prohibited.

Direction Indicator Barricades (DIBs) Guidance

6/22/11: DIBs should be used for long-term and may be used in short-term stationary projects.

Review of Roundabout Designs

6/22/11: Traffic and Design divisions will now review preliminary layouts of all roundabouts.

EPG 1019.5.4 Cement Processing Additions

6/22/11: AASHTO M 327 and M 85 now specified due to AASHTO and ASTM synchronizing their specs.

EPG 131.1 Design Exception Process

6/22/11: Design exceptions are now to be analyzed for safety where the AASHTO Highway Safety Manual allows.

EPG 822 Roadside Vegetation Management

6/22/11: Guidance in EPG 822 has been generally re-written to reflect Practical Operations.

Junkyard Forms

6/17/11: EPG 236.17 Junkyards has been updated with several renamed and revised forms.

EPG 236.16 Outdoor Advertising

6/17/11: Many of the Right of Way forms have been updated and several new ones have been added.

Contract Leveling Courses

6/7/11: Most of the sheets in the Traffic Control CLC Templates were updated to be in line with current guidance. CLC Guidelines and JSP were also updated.

Pavement Edge Treatment

6/17/11: Pavement Edge Treatment info was moved from EPG 616.17 to this new article to coordinate with pay items.

System I Protective Coating

6/13/11: Guidance has been added to EPG 751.14.5.8 and EPG 751.50 to accommodate this new system.

EPG 751 Revisions

6/13/11: The limits were corrected for "No Wearing Surface" cantilevers in EPG 751.10.3.2 (to less than 3'-8"); in EPG 751.22.3.13 the size of the diaphragm was clarified in the "Part Section Showing Interm't Diaphragms" figure; in EPG 751.6.1 guidance for minimum spacing was added; a suggested range in EPG 751.37.6.2 was removed; and in EPG 751.37.6.7 the Vs equation was corrected.