Difference between revisions of "Category:620 Pavement Marking"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (→‎Pavement Marking Guidelines: Per Traffic, two headings clarified in Pavement Marking Guidelines table)
m (Per TS, eliminated Mem’l Day striping goal, use of double dropped wet reflective elements, & grooving on constr’n project if a durable pavem’t marking product is not being used.)
Line 3: Line 3:
  
  
 
 
{|style="padding: 0.3em; margin-right:145px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="300px" align="right"
 
|-
 
|<center>'''Other Resources'''</center>
 
|-
 
|[http://wwwi/intranet/tr/documents/StripingOperationsManual_FINAL.pdf Pavement Marking Operations Direction (Practical Operations Pavement Marking Implementation Plan)]
 
|-
 
|[http://wwwi/intranet/tr/documents/StripingCommunicationsPlan.pdf Striping Communications Plan]
 
|}
 
  
  
Line 33: Line 23:
  
 
==<center>'''Pavement Marking Guidelines</center>'''==
 
==<center>'''Pavement Marking Guidelines</center>'''==
{| border="1" class="wikitable" style="margin: 1em auto 1em auto" style="text-align:center"
+
{| border="1" class="wikitable" style="margin: 1em auto 1em auto; text-align:center;"
 
|-
 
|-
! colspan="2" rowspan="2"| !! Colspan="3" style="background:#BEBEBE"|Divided Highways !! style="background:#BEBEBE"|Undivided Highways!! style="background:#BEBEBE"|All Classifications
+
! colspan="2" colspan="2"| !! style="background:#BEBEBE"|Divided Highways !! style="background:#BEBEBE"|Undivided Highways!! style="background:#BEBEBE"|All Classifications
 
|-
 
|-
!    style="background:#BEBEBE"|Grooved In Lane Lines<sup>1</sup> !! style="background:#BEBEBE"|Other Lane Lines<sup>1</sup> !! style="background:#BEBEBE"|White Edgelines and All Yellow Lines!! style="background:#BEBEBE"|White Edgelines and All Yellow Lines!! style="background:#BEBEBE"|Intersection Markings
+
|colspan="2" align="center" style="background:#F5F5F7"|'''Contractor Installations''' || align="center" style="width:15%"| High Build Paint with Type L Beads ||  Waterborne Paint with Type P Beads || Type 2 tape
 
|-
 
|-
|rowspan="2" align="center" style="background:#F5F5F7"|'''Contractor Installations''' || align="center" style="width:15%"| '''Major Roads''' ||  Epoxy or high build paint with  wet reflective beads including contrast markings on concrete. || Not applicable||Acrylic waterborne paint with type P beads || Acrylic waterborne paint with type P beads ||rowspan="2"|Type 2 tape
+
|colspan="5" height="10"|  
 
|-
 
|-
| align="center"|'''Minor Roads''' ||Not applicable||colspan="3"| Acrylic waterborne paint with type P beads
+
|rowspan="5" align="center" style="background:#F5F5F7"| '''MoDOT Installations''' ||align="center"| '''Major Roads''' – shall be striped annually unless retroreflectivity exceeds requirements for new pavement markings<sup>'''1'''</sup> || Waterborne Paint with Type L beads (60° and rising)||Waterborne Paint with Type PM beads (60° and rising)||rowspan="5"|Type 2 tape, preformed thermoplastic or waterborne paint with Type PM beads  
 
|-
 
|-
|rowspan="4" align="center" style="background:#F5F5F7"| '''MoDOT Forces''' ||align="center"| '''Major Roads''' – shall be striped by Memorial Day unless there is a performing durable marking||Acrylic waterborne paint with wet reflective beads||colspan="3" rowspan="4"| Acrylic waterborne paint with type PM beads||rowspan="4"|Type 2 tape, preformed thermoplastic or acrylic waterborne paint
+
|align="center"|'''Regionally Significant Roads''' – shall be striped annually unless retroreflectivity exceeds requirements for new pavement markings<sup>'''1'''</sup> ||rowspan="4"|Not applicable ||rowspan="4"| Waterborne Paint with Type PM beads (50° and rising)<br/>or<br/> Cold weather paint with Type PM beads (35° to 50°)
 
|-
 
|-
|align="center"|'''Regionally Significant Roads''' – shall be striped annually ||rowspan="3"|Not applicable 
+
|align="center"|'''Minor Roads≥400 AADT''' – maximum of 50% striped annually  
 
|-
 
|-
|align="center"|'''Other Minor Roads''' – maximum of 50 percent striped annually  
+
|align="center"|'''Minor Roads<400 AADT''' – maximum of 33.3% striped annually  
 
|-
 
|-
 
|align="center"|'''Surface Treatments'''
 
|align="center"|'''Surface Treatments'''
 
|-
 
|-
|colspan="7" align="left"|<sup>'''1'''</sup>  Lane Lines include all white lines other than edgelines. They are typically dashed lines, but also include some solid lines when separating turn lanes or areas where lane changes are not recommended.   
+
|colspan="5" align="left"|<sup>'''1'''</sup>  See [[620.13 Measurement of Retroreflectivity by Handheld Retroreflectometers#620.13.5 Acceptance|Pavement Marking Acceptance Table]]    
 
|}
 
|}

Revision as of 12:32, 25 February 2015

620 Delineation System 3.jpg












Pavement Marking Guidelines

Divided Highways Undivided Highways All Classifications
Contractor Installations High Build Paint with Type L Beads Waterborne Paint with Type P Beads Type 2 tape
MoDOT Installations Major Roads – shall be striped annually unless retroreflectivity exceeds requirements for new pavement markings1 Waterborne Paint with Type L beads (60° and rising) Waterborne Paint with Type PM beads (60° and rising) Type 2 tape, preformed thermoplastic or waterborne paint with Type PM beads
Regionally Significant Roads – shall be striped annually unless retroreflectivity exceeds requirements for new pavement markings1 Not applicable Waterborne Paint with Type PM beads (50° and rising)
or
Cold weather paint with Type PM beads (35° to 50°)
Minor Roads≥400 AADT – maximum of 50% striped annually
Minor Roads<400 AADT – maximum of 33.3% striped annually
Surface Treatments
1 See Pavement Marking Acceptance Table