Difference between revisions of "Main Page"
m |
m (EPG 127.1) |
||
Line 48: | Line 48: | ||
{| style="margin: 1em auto 1em auto" style="background-color: #F8F8FF" | {| style="margin: 1em auto 1em auto" style="background-color: #F8F8FF" | ||
|- | |- | ||
− | |colspan="2"|'''Perhaps you've wondered how many hits the most popular EPG articles have. As of | + | |colspan="2"|'''Perhaps you've wondered how many hits the most popular EPG articles have. As of early February, the numbers of hits are:''' |
|- | |- | ||
− | |'''20.''' [[751.50 Standard Detailing Notes|EPG 751.50]], | + | |'''20.''' [[751.50 Standard Detailing Notes|EPG 751.50]], 105954 ||'''10.''' [[:Category:616 Temporary Traffic Control|EPG 616]], 156178 |
|- | |- | ||
− | |'''19.''' [[903.6 Warning Signs|EPG 903.6]], | + | |'''19.''' [[903.6 Warning Signs|EPG 903.6]], 110633 ||'''9.''' [[:Category:600 INCIDENTAL CONSTRUCTION|EPG 600]], 189413 |
|- | |- | ||
− | |'''18.''' [[:Category:134 Engineering Professional Services|EPG 134]], | + | |'''18.''' [[:Category:134 Engineering Professional Services|EPG 134]], 114536 ||'''8.''' [[616.23 Traffic Control for Field Operations|EPG 616.23]], 196115 |
|- | |- | ||
− | |'''17.''' [[136.4 Consultant Selection and Consultant Contract Management|EPG 136.4]], | + | |'''17.''' [[136.4 Consultant Selection and Consultant Contract Management|EPG 136.4]], 116034 ||'''7.''' [[:Category:101 Standard Forms|EPG 101]], 199617 |
|- | |- | ||
− | |'''16.''' [[751. | + | |'''16.''' [[751.5 Standard Details|EPG 751.5]], 117660 ||'''6.''' [[136.12 Figures, Glossary and Other Useful Links|EPG 136.12]], 207705 |
|- | |- | ||
− | |'''15.''' | + | |'''15.''' [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]], 117682 ||'''5.''' [[:Category:100 GENERAL|EPG 100]], 234386 |
|- | |- | ||
− | |'''14.''' [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]], | + | |'''14.''' [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]], 123940 || '''4.''' [[:Category:700 STRUCTURES AND HYDRAULICS|EPG 700]], 242997 |
|- | |- | ||
− | |'''13.''' [[136.9 Plans, Specs and Estimates (PSE)|EPG 136.9]], | + | |'''13.''' [[136.9 Plans, Specs and Estimates (PSE)|EPG 136.9]], 127216 || '''3.''' [[:Category:900 TRAFFIC CONTROL|EPG 900]], 262384 |
|- | |- | ||
− | |'''12.''' [[:Category:903 Highway Signing|EPG 903]], | + | |'''12.''' [[:Category:903 Highway Signing|EPG 903]], 140083 ||'''2.''' [[:Category:751 LRFD Bridge Design Guidelines|EPG 751]], 302419 |
|- | |- | ||
− | |'''11.''' [[:Category:200 GEOMETRICS|EPG 200]], | + | |'''11.''' [[:Category:200 GEOMETRICS|EPG 200]], 149561 ||'''1.''' EPG Main Page, 1841213 |
|} | |} | ||
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"| | |valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"| | ||
+ | '''[[127.1 Request for Environmental Services|EPG 127.1 Request for Environmental Services]]''' | ||
+ | |||
+ | 2/2/15: Guidance in this article has been brought into conformance with the new RES form. | ||
+ | |||
'''[[:Category:403 Asphaltic Concrete Pavement#Aggregate Properties|Mixture Production Aggregate Properties]]''' | '''[[:Category:403 Asphaltic Concrete Pavement#Aggregate Properties|Mixture Production Aggregate Properties]]''' | ||
Line 167: | Line 171: | ||
11/18/14: The definition of "Routine Adjustment" was revised in the Change Order Codes. | 11/18/14: The definition of "Routine Adjustment" was revised in the Change Order Codes. | ||
− | |||
− | |||
− | |||
− |
Revision as of 10:28, 2 February 2015
HELPFUL EPG VIDEOS: | •Logging into the EPG | •Finding Info in the EPG | |
•Article History & How to Receive EMails When Articles are Revised | |||
___________ | |||
Want help on how to update your EPG guidance? It is available at EPG Approval Process. | |||
___________ | |||
The Electronic MoDOT Spec Book for Mobile Devices is now available. You may also sign up for E-Update notices. To receive notices regarding Engineering Policy Revisions, select "Engineering Policy" then mark the appropriate subjects of interest. |
RECENT POLICY CHANGES IN THE EPG | |||||||||||||||||||||||||||||||
MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as Practical Design and design-build, were used to deliver those commitments and have made MoDOT a leader in the transportation industry. These forward-thinking, innovative concepts are reflected in the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former Right of Way, Design, Bridge, Construction, Traffic and Maintenance manuals. MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG. Over 20 million hits on the EPG endorse this format to be easy to navigate and pleasing to read. A small HELP ARTICLE is included to assist with helpful hints on how to use the EPG as well as other points of interest.
|
EPG 127.1 Request for Environmental Services 2/2/15: Guidance in this article has been brought into conformance with the new RES form. Mixture Production Aggregate Properties 1/22/15: Consensus tests will be performed on material sampled from the cold feed of both drum-mix and batch plants. EPG 751.50 Standard Detailing Notes 1/15/15: Numerous notes (B3.2, H2b2.10, H2c1.20, H2c1.25, H4.8, H7.3, H10.5) were clarified. Note H4.2.2 was updated to reference the correct anchor bolt. Impact Fee Documentation 1/8/15: The yellow box in EPG 121.3 The Statewide Transportation Improvement Program was updated to clarify guidance about documenting impact fee calculations and impact fee waivers. Updated QRG 1/7/15: In EPG 101 Standard Forms, the QRG Change Orders – Mobilization and Contract Bond was updated because our new agreement with FHWA eliminates the need to send any Level 1 or 2 change orders to FHWA for review. 1/6/15: Guidance was revised to conform with the new change order approval criteria that reduces the number of change orders reviewed by FHWA and will improve the efficiency of the review process. EPG 751.37.6.1 Reinforcement Design 1/2/15: The guidance for minimum rock socket length requirements and the commentary on this guidance have been clarified. EPG 110.3 Prevailing Wages and Records 12/26/14: Guidance was revised to increase the number of payrolls that are checked for compliance. Project Documentation 12/24/14: Guidance in EPG 150.1.1 Folder Structure and EPG 150.1.2 File Naming Convention was updated to accommodate SharePoint. 12/24/14: Recommended documentation for change orders and time adjustments has been added. EPG 751.6.2.7 Non-Destructive Testing (NDT) for Cover Plates 12/22/14: NDT is required for all top cover plates when a bridge is to be redecked. Also, guidance is now provided for when bottom flange cover plates are present. Fiber Reinforced Polymer Slab Drains 12/18/14: In EPG 751.10.3 Bridge Deck Drainage – Slab Drains, EPG 751.40.5 Drainage and EPG 751.50 H7 Slab Drains, Fiber Reinforced Polymer slab drain details and guidance was incorporated into the articles to provide another material option. Cost Estimate Guide for Rural Preliminary Design 12/15/14: In EPG 104.7 Estimates, this document has been updated with figures reflecting new Maintenance Treatment per mile costs. New QRG 12/10/14: A new QRG, Liquidated Damage Adjustments, has been added to EPG 101 Standard Forms. EPG 747 Bridge Reports and Layouts 12/9/14: EPG 748.7 Bridge Reports and Layouts was moved to EPG 747. (The remaining EPG 748 articles were renumbered as needed.) EPG 747's guidance was generally rewritten. The Bridge Survey Report Form was revised to reflect its use for all structures instead of only stream crossings. A Bridge Survey Checklist was also developed for district use. EPG 751.50 Standard Detailing Notes A1 and A2 12/8/14: Notes A1 and A2 were simplified. Note A2.12 was deleted since it is no longer needed. EPG 748.6 High Water Surface Elevation 12/5/14: The term "Design High Water" was revised to "Design Flood Elevation" or "Normal High Water" and the term "High Water" revised to "Base Flood Elevation". EPG 170 Maintenance Activity Planning Guidelines 12/3/14: Updated the Work Scheduling Guide and Index of Printable Planning Guides. References to scrub seal and linseed oil treatments were removed. R328 Bridge Jt. Maintc. and R329 Bridge Cleaning & Flushing codes were added. 12/3/14: All of the JOC JSPs have been updated. Among the revisions, prices have been updated and some guard cable options have been added. EPG 751.5 Structural Detailing Guidelines 12/1/14: EPG 751.5 has been generally rewritten and retitled "Structural Detailing Guidelines". EPG 751.10.1.10 Slab Offsets for Curved Bridges 12/1/14: Guidance was updated and "Profile Grade & Vertical Curve Data" was retitled as "Slab Offsets for Curved Bridges". 12/1/14: This article was updated to current practice. Moved "Vertical and Horizontal Clearance" from EPG 748.7 to EPG 751.1.2.5 and renumbered subsequent articles. Inspection of Bituminous Mixing Plants 11/25/14: In EPG 460.3.11 Reclaimed Asphalt Pavement (RAP), guidance was updated to replace outdated test method AASHTO TP58 with AASHTO T 327. New QRG 11/20/14: A new QRG, Land Disturbance Project Information, has been added to EPG 101 Standard Forms. 11/18/14: The definition of "Routine Adjustment" was revised in the Change Order Codes. |