m (EPG Help Article)
Line 72: Line 72:
  
 
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 
|valign="top" cellspacinepgg="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 +
'''[[771.2 Bridge Cleaning and Flushing|EPG 771.2 Bridge Cleaning and Flushing]]'''
 +
 +
1/5/16: This article was revised to comply with the MDNR permit. Also, [[771.2 Bridge Cleaning and Flushing#Guidance on Aquatic Invasive Species Control BMPs|Guidance on Aquatic Invasive Species Control BMPs]] was added.
 +
 
'''Deadline for Submitting Proposals to the Engineering Policy Group'''
 
'''Deadline for Submitting Proposals to the Engineering Policy Group'''
  
Line 166: Line 170:
 
'''[[127.25 Maintenance Environmental Policies#127.25.8.2 Lead Mining Chat|EPG 127.25.8.2 Lead Mining Chat]] and [[127.22 Off-Site Borrow, Spoil, and Staging Areas#The contractor is required to clear land disturbance|EPG 127.22 Off-Site Borrow, Spoil, and Staging Areas]]'''
 
'''[[127.25 Maintenance Environmental Policies#127.25.8.2 Lead Mining Chat|EPG 127.25.8.2 Lead Mining Chat]] and [[127.22 Off-Site Borrow, Spoil, and Staging Areas#The contractor is required to clear land disturbance|EPG 127.22 Off-Site Borrow, Spoil, and Staging Areas]]'''
  
10/23/15: New EPA regulation, applying to 4 counties in SW Missouri, facilitates environmental cleanup
+
10/23/15: New EPA regulation, applying to 4 counties in SW Missouri, facilitates environmental cleanup.
 
 
'''[[238.2 Land Surveying#238.2.18.6 Recording the Location Survey Plan|EPG 238.2.18.6 Recording the Location Survey Plan]]'''
 
 
 
10/22/15:  The process to complete location survey plan was revised. A reminder mechanism was created to help avoid delays to recording the location survey plans.
 

Revision as of 14:09, 5 January 2016

EPG 2013b.jpg


HELPFUL EPG VIDEOS: •Logging into the EPG •Finding Info in the EPG
•Article History & How to Receive EMails When Articles are Revised
___________
Want help on how to update your EPG guidance?  It is available at EPG Approval Process.
___________
The Electronic MoDOT Spec Book for Mobile Devices is now available. You may also sign up for E-Update notices. To receive notices regarding Engineering Policy Revisions, select "Engineering Policy" then mark the appropriate subjects of interest.


WELCOME
RECENT POLICY CHANGES IN THE EPG
Phillips Hardy employees remove the old deck from the Rte. 13 bridge over Table Rock Lake at Kimberling City. Traffic is down to one lane while the work is being done. The $10 million project will be completed in May 2016.
Emery Sapp and Sons crews demolish the Garth Ave. bridge over I-70 in Columbia. This is part of an $18 million design-build project to replace the I-70 bridges.
Equip’t. Tech. Supervisor Tim Green shares information with SE District Innovations Challenge participants and judges about the Aftermarket Exhaust Gas Recirculation Cooler for International Trucks. This innovation received top honors at the recent district showcase.

MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as Practical Design and design-build, were used to deliver those commitments and have made MoDOT a leader in the transportation industry.

These forward-thinking, innovative concepts are reflected in the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former Right of Way, Design, Bridge, Construction, Traffic and Maintenance manuals.

MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG. Over 30 million hits on the EPG endorse this format to be easy to navigate and pleasing to read. A small HELP ARTICLE is included to assist with helpful hints on how to use the EPG as well as other points of interest.

Maint. Worker Brandon Tilley (left) and Seasonal Maint. Worker Mike Fulton are part of a crew sealing cracks along Rte. BB in Hollister.
Perhaps you've wondered how many hits the most popular EPG articles have. As of early January, the numbers of hits are:
20. EPG 903.6, 125103 10. EPG 616, 174826
19. EPG 134, 128406 9. EPG 600, 209408
18. EPG 751.40, 133105 8. EPG 616.23, 227385
17. EPG 751.50, 136515 7. EPG 101, 256085
16. EPG 136.4, 139869 6. EPG 100, 258185
15. EPG 620.2, 146735 5. EPG 700, 266099
14. EPG 751.5, 148277 4. EPG 136.12, 287297
13. EPG 903, 157264 3. EPG 900, 289759
12. EPG 136.9, 158263 2. EPG 751, 341560
11. EPG 200, 163639 1. EPG Main Page, 2215444

EPG 771.2 Bridge Cleaning and Flushing

1/5/16: This article was revised to comply with the MDNR permit. Also, Guidance on Aquatic Invasive Species Control BMPs was added.

Deadline for Submitting Proposals to the Engineering Policy Group

1/5/16: The submittal deadlines have been moved up about a week in EPG Ballot Cycles.

EPG 643.4 Railroads

12/30/15: Much of this article was revised to reflect current practices and to clarify coordination with the Multimodal Railroad group.

Potential Storm Water Controls Table

12/30/15: This table was clarified and expanded.

TMS Maps User Guide

12/23/15: This new guide explains TMS and assists with the various tools available when mapping.

EPG 131.2 Proprietary Items and Public Interest Findings

12/17/15: Guidance was revised to align with the MoDOT/FHWA oversight and partnering agreements. Revision ensures submitted items receive appropriate approvals.

Required Notices and Posters

12/11/15: Several required posters and notices have been updated, including FHWA Form 1022, OSHA 3165, WH-1420 and the Unemployment Benefit Law.

Job Order Contracting (JOC)

12/10/15: Five of the JOC JSPs have been updated. Among the revisions, the unit costs have been fixed for 2016 and storm water compliance and new guardrail requirements have been added.

Federal Involvement

12/8/15: In a number of articles including EPG 128.10 Conceptual Study Report Approval and Submittal and EPG 131.1.3 Projects of Divisional Interest, terminology has been clarified to the current "federal involvement" (instead of "Full Oversight").

Cost Estimate Guide

12/3/15: The latest Cost Estimate Guide for rural preliminary design is available in EPG 104.7 Estimates.

Attachments by Others to MoDOT's Drainage System

11/30/15: Guidance for connections to MoDOT's drainage, as it relates to the MS4 permit, was clarified in EPG 127.25.8.3.2 System Attachments by Others.

NOTICE Plaque (W16-18P)

11/30/15: In both EPG 903.6.59 NOTICE Plaque and EPG 903.5.36 Weight Limit Signs, guidance for the NOTICE plaque has been added for use on bridge weight limit changes as well as an option for other regulatory signs. The plaque helps to emphasize bridge postings that are being lowered.

EPG 941.5 Request by a City to Construct a “WELCOME TO” Monument

11/25/15: The review and approval process was improved by revising when the categorical exclusion request will occur during the city "Welcome To" sign process.

When the Commission holds less than fee simple interest in property

11/25/15: Guidance was clarified for when full disclosure language is needed in quitclaim deeds.

NU Girder Reinforcement

11/24/15: Revised tables and images in EPG 751.5.4.1 Precast P/S Concrete Girders and Beams and EPG 751.22.3.6 Girder Reinforcement to accommodate possible savings using a new NU reinforcement design.

EPG 616.6.2.2 Flags, Advance Warning Rail System and Warning Lights on Signs

11/24/15: The proper use of flags and warning lights on signs in a work zone has been clarified. For projects consisting of nighttime only work, the use of flags is prohibited. Flashing warning lights shall only be used on signs that are post-mounted. The use of flashing warning lights on signs with portable stands is prohibited.

Band Angles

11/24/15: Approved industry-standard band angles allow industry to use an engineered angle when it is financially beneficial.

Route Surveying of Stream Crossings

11/18/15: EPG 238.3.36.3.7 Valley Sections was updated to more closely reflect guidance in HEC-RAS user manual. Guidance for valley sections at stream junctions was also added. In EPG 238.3.36.3.17 Multiple Structures, guidance on Major Streams was replaced with guidance for Multiple Structures (in the same floodplain).

How EPG Guidance is Revised

11/19/15: Proposed revisions to engineering policy are now submitted using the Engineering Policy Revision Request Form. The proposals will be categorized by the Innovation Engineer based on several guidelines.

EPG 1032 Precast Concrete Flared End Sections

11/17/15: Guidance has been updated to allow a concrete pipe manufacturer to use steel fibers in concrete flared end sections instead of standard reinforcing steel.

MoDOT MOU Execution Process

11/6/15: DBE Goals will now be set by project managers or contract administrators on on-call contracts. This replaces the statewide programmatic goal of 13.5% and provides a level playing field for all on-call consultants in the utilization of DBEs.

EPG 236.17 Junkyards

11/4/15: This article has been generally clarified.

EPG 127.25 Maintenance Environmental Policies

10/28/15: Many links were updated along with numerous clarifications.

Alternative Location Proposals

10/27/15: In EPG 236.10.7.3 Alternative Location Proposals, EPG 235.3.4 Right of way as well as the Letter Advertising a Public Hearing, guidance for alternative location proposals has been clarified to reflect current statewide practices.

EPG 127.25.8.2 Lead Mining Chat and EPG 127.22 Off-Site Borrow, Spoil, and Staging Areas

10/23/15: New EPA regulation, applying to 4 counties in SW Missouri, facilitates environmental cleanup.