Difference between revisions of "Main Page"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (EPG 501.1.3.5)
m
Line 27: Line 27:
 
|valign="top" style="border: 1px solid #A9A9A9; color: #000; background-color: #F8F8FF"|
 
|valign="top" style="border: 1px solid #A9A9A9; color: #000; background-color: #F8F8FF"|
 
{| style="margin: 1em auto 1em auto"
 
{| style="margin: 1em auto 1em auto"
 +
|-
 +
|[[image:Main Page 2 May 20, 2016.jpg|center|400px]]
 +
|-
 +
|align="center"|'''[http://emerysapp.com/ Emery Sapp & Sons] employees use high-tension steel rods, hydraulic jacks and 15 bottles of dish detergent to [https://www.facebook.com/MoDOTCentralMissouriDistrict/videos/1046750438711345/?video_source=pages_finch_main_video slide the new 800,000-pound westbound I-70 bridge into place over Garth Ave.] in Columbia.  This is the second time this technique has been used in Missouri.'''
 +
|-
 +
|[[image:Main Page May 20, 2016.jpg|center|400px]]
 
|-
 
|-
 
|colspan="2" |    [[image:Main Page May 3, 2016.jpg|center|400px|thumb|<center>'''    [http://www.saffocontractors.com/index.php Saffo Contractors] employees perform prep work for [http://www.modot.org/central/MORiverBridgeJC.htm maintenance of the Missouri River Bridge] at Jefferson City.  For about 4 months, the westbound bridge will be closed for painting and repairs.    </center>  '''  ]]
 
|colspan="2" |    [[image:Main Page May 3, 2016.jpg|center|400px|thumb|<center>'''    [http://www.saffocontractors.com/index.php Saffo Contractors] employees perform prep work for [http://www.modot.org/central/MORiverBridgeJC.htm maintenance of the Missouri River Bridge] at Jefferson City.  For about 4 months, the westbound bridge will be closed for painting and repairs.    </center>  '''  ]]
 
|-
 
|-
 
|colspan="2" |    [[image:Main Page Apr 26, 2016.jpg|center|400px|thumb|<center>'''    [http://www.robertsoncontractors.com/ Robertson Contractors] employees slip form the barrier wall at the new Rte. 51 Little White Water Creek Bridge near Patton.    </center>  '''  ]]
 
|colspan="2" |    [[image:Main Page Apr 26, 2016.jpg|center|400px|thumb|<center>'''    [http://www.robertsoncontractors.com/ Robertson Contractors] employees slip form the barrier wall at the new Rte. 51 Little White Water Creek Bridge near Patton.    </center>  '''  ]]
|-
 
|colspan="2" |    [[image:Main Page Apr 21, 2016.jpg|center|400px|thumb|<center>'''  [http://business.capechamber.com/list/member/fronabarger-concreters-inc-oak-ridge-4081.htm Fronabarger Concreters] employees replace the old tracks of the [http://slimrr.com/ St. Louis Iron Mountain and Southern Railway] crossing of MO Rtes. 25, 34 and 72 and U.S. 61 in Jackson.  Work began to produce the new, much smoother crossing at 6 PM on Saturday and was completed by 4 PM the next day which avoided having the busy intersection closed through the week.    </center>    '''  ]]
 
 
|}
 
|}
  
Line 45: Line 49:
 
{| style="margin: 1em auto 1em auto" style="background-color: #F8F8FF"  
 
{| style="margin: 1em auto 1em auto" style="background-color: #F8F8FF"  
 
|-
 
|-
|colspan="2" |'''Perhaps you've wondered how many hits the most popular EPG articles have.  As of mid-May, the numbers of hits are:'''
+
|colspan="2" |'''Perhaps you've wondered how many hits the most popular EPG articles have.  As of late May, the numbers of hits are:'''
 
|-
 
|-
|'''20.'''  [[:Category:136 Local Public Agency (LPA) Policy|EPG 136]], 134115   ||'''10.''' [[:Category:616 Temporary Traffic Control|EPG 616]], 184887
+
|'''20.'''  [[:Category:136 Local Public Agency (LPA) Policy|EPG 136]], 134233   ||'''10.''' [[:Category:616 Temporary Traffic Control|EPG 616]], 185162
 
|-
 
|-
|'''19.'''  [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]], 136797     ||'''9.'''  [[:Category:600 INCIDENTAL CONSTRUCTION|EPG 600]], 218461
+
|'''19.'''  [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]], 136825     ||'''9.'''  [[:Category:600 INCIDENTAL CONSTRUCTION|EPG 600]], 218658
 
|-
 
|-
|'''18.'''  [[:Category:134 Engineering Professional Services|EPG 134]], 137473   ||'''8.'''  [[616.23 Traffic Control for Field Operations|EPG 616.23]], 242058
+
|'''18.'''  [[:Category:134 Engineering Professional Services|EPG 134]], 137660   ||'''8.'''  [[616.23 Traffic Control for Field Operations|EPG 616.23]], 242164
 
|-
 
|-
|'''17.'''    [[751.50 Standard Detailing Notes|EPG 751.50]], 146283   ||'''7.''' [[:Category:100 GENERAL|EPG 100]], 269894
+
|'''17.'''    [[751.50 Standard Detailing Notes|EPG 751.50]], 146364   ||'''7.''' [[:Category:100 GENERAL|EPG 100]], 270023
 
|-
 
|-
|'''16.'''    [[136.4 Consultant Selection and Consultant Contract Management|EPG 136.4]], 152920     ||'''6.'''  [[:Category:700 STRUCTURES AND HYDRAULICS|EPG 700]], 275899
+
|'''16.'''    [[136.4 Consultant Selection and Consultant Contract Management|EPG 136.4]], 152968     ||'''6.'''  [[:Category:700 STRUCTURES AND HYDRAULICS|EPG 700]], 276073
 
|-
 
|-
|'''15.'''    [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]], 155355     ||'''5.'''  [[:Category:101 Standard Forms|EPG 101]], 278574
+
|'''15.'''    [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]], 155487     ||'''5.'''  [[:Category:101 Standard Forms|EPG 101]], 278927
 
|-
 
|-
|'''14.'''    [[:Category:903 Highway Signing|EPG 903]], 163292     || '''4.''' [[:Category:900 TRAFFIC CONTROL|EPG 900]], 301101
+
|'''14.'''    [[:Category:903 Highway Signing|EPG 903]], 163405     || '''4.''' [[:Category:900 TRAFFIC CONTROL|EPG 900]], 301302
 
|-
 
|-
|'''13.'''    [[751.5 Standard Details|EPG 751.5]], 163505   || '''3.''' [[136.12 Figures, Glossary and Other Useful Links|EPG 136.12]], 318572
+
|'''13.'''    [[751.5 Standard Details|EPG 751.5]], 163634   || '''3.''' [[136.12 Figures, Glossary and Other Useful Links|EPG 136.12]], 319067
 
|-
 
|-
|'''12.'''    [[136.9 Plans, Specs and Estimates (PSE)|EPG 136.9]], 168826   ||'''2.''' [[:Category:751 LRFD Bridge Design Guidelines|EPG 751]], 359340
+
|'''12.'''    [[136.9 Plans, Specs and Estimates (PSE)|EPG 136.9]], 168891   ||'''2.''' [[:Category:751 LRFD Bridge Design Guidelines|EPG 751]], 359740
 
|-
 
|-
|'''11.'''    [[:Category:200 GEOMETRICS|EPG 200]], 168941   ||'''1.''' EPG Main Page, 2356961
+
|'''11.'''    [[:Category:200 GEOMETRICS|EPG 200]], 169015   ||'''1.''' EPG Main Page, 2359232
 
|}
 
|}
  

Revision as of 11:53, 20 May 2016

EPG 2013b.jpg


HELPFUL EPG VIDEOS: •Logging into the EPG •Finding Info in the EPG
•Article History & How to Receive EMails When Articles are Revised
___________
Want help on how to update your EPG guidance?  It is available at EPG Approval Process.
___________
The Electronic MoDOT Spec Book for Mobile Devices is now available. You may also sign up for E-Update notices. To receive notices regarding Engineering Policy Revisions, select "Engineering Policy" then mark the appropriate subjects of interest.


WELCOME
RECENT POLICY CHANGES IN THE EPG
Main Page 2 May 20, 2016.jpg
Emery Sapp & Sons employees use high-tension steel rods, hydraulic jacks and 15 bottles of dish detergent to slide the new 800,000-pound westbound I-70 bridge into place over Garth Ave. in Columbia. This is the second time this technique has been used in Missouri.
Main Page May 20, 2016.jpg
Saffo Contractors employees perform prep work for maintenance of the Missouri River Bridge at Jefferson City. For about 4 months, the westbound bridge will be closed for painting and repairs.
Robertson Contractors employees slip form the barrier wall at the new Rte. 51 Little White Water Creek Bridge near Patton.

MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as Practical Design and design-build, were used to deliver those commitments and have made MoDOT a leader in the transportation industry.

These forward-thinking, innovative concepts are reflected in the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former Right of Way, Design, Bridge, Construction, Traffic and Maintenance manuals.

MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG. Over 30 million hits on the EPG endorse this format to be easy to navigate and pleasing to read. A small HELP ARTICLE is included to assist with helpful hints on how to use the EPG as well as other points of interest.


Perhaps you've wondered how many hits the most popular EPG articles have. As of late May, the numbers of hits are:
20. EPG 136, 134233 10. EPG 616, 185162
19. EPG 751.40, 136825 9. EPG 600, 218658
18. EPG 134, 137660 8. EPG 616.23, 242164
17. EPG 751.50, 146364 7. EPG 100, 270023
16. EPG 136.4, 152968 6. EPG 700, 276073
15. EPG 620.2, 155487 5. EPG 101, 278927
14. EPG 903, 163405 4. EPG 900, 301302
13. EPG 751.5, 163634 3. EPG 136.12, 319067
12. EPG 136.9, 168891 2. EPG 751, 359740
11. EPG 200, 169015 1. EPG Main Page, 2359232

EPG 501.1.3.5.2 Testing Requirements, Structures

5/20/16: Added "for every 100 cubic yards" to harmonize with the Federal-Aid Acceptance Sampling and testing table.

Milestones

5/19/16: Info was added to this QRG about setting up administrative and road user costs Liquidated Damages.

EPG 238.3.36.3.6 Streambed Profiles

5/13/16: Guidance regarding the required length of the streambed profile, elevation intervals along that length, and location of tie station at the survey centerline was clarified.

Contract Leveling Course (CLC) and Seal Coat

5/3/16: The Contract Leveling Course and Seal Coat guidelines as well as their respective JSP packages were updated.

Evaluation of and Compensation for Non-Contiguous Entrance Shifts

4/29/16: Guidance in both EPG 941.2 Entrance Requests Within Controlled Access Right of Way and EPG 236.5.28.3 Compensation for Changes in Access for non-contiguous entrance shifts was updated to reflect current practices.

Prequalification of Bridge Consultants

4/29/16: The prequalification of bridge consultants in EPG 134.1.3 Consultant Qualification was clarified. All bridge plans are required to be signed and sealed by a professional engineer from a firm that is prequalified for bridge work.

Digital Signature for Adobe Reader DC or Pro DC

4/25/16: This new QRG is now available in EPG 101 Standard Forms.

Rock Blanket

4/22/16: In EPG 751.1.2.18.2 Content and EPG I1. General, guidance was clarified that the top of rock blanket shall be flush to the ground line when redecks or rock blanket elevations aren’t shown on bridge plans and where decreasing the bridge opening is unacceptable.

DGN Merger

4/22/16: Guidance in EPG 236.13.13 Plan Submittal and Filing now shows how Design staff will provide DGN files to ROW staff to be uploaded in Spatial Editor.

Required Notices and Posters at the Jobsite

3/30/16: The listings of required notices and posters in EPG 110.2 were updated to align with the checklist.

Reclaimed Asphalt

3/29/16: EPG 403.1.2 Reclaimed Asphalt was re-written to reflect current practice.

Tack Coat

3/18/16: EPG 407 Tack Coat and EPG 106.4.2.6 Bituminous Distributors were updated to achieve proper application and coverage of tack coat material to improve the bond strength between pavement layers and produce a longer pavement service life.

EPG 236.5 Property Management

3/18/16: The ROW Director may now waive the requirement for legislative action for property sold above $100,000, rather than $25,000.

Signing and Striping Operations

3/17/16: Guidance in EPG 144.2 Signing Operations Changes and EPG 144.3 Striping Operations Changes now reflects current policy.

EPG 113.5 Contractor Claim and Dispute Resolution

3/9/16: This new guidance assists the Resident Engineer with the resolution of disputes.

Professional Services Committee Request Forms

3/4/15: In EPG 134.2.2.2, guidance was added to note a signature line for a division director has been added to the PSC request forms.

Typical Applications (TAs)

2/29/16: The TAs are now available in EPG 616.8 Typical Applications.

CRE2O QA Asphalt Guide

2/29/16: This new QRG is now available in EPG 101 Standard Forms.

Job Mix Formula

2/29/16: The revisions in EPG 403.1.4 Job Mix Formula and EPG 403.2.2 Mix Design Procedure to job mix formula info pertaining to aspahlt source will allow district Materials personnel to make speedier source switches.

EPG 1052.2.3.6 Compressive Strength Test

2/29/16: AASHTO R 60 is now to be utilized when sampling concrete for MSE and sound wall system components.

EPG 616.6 Temporary Traffic Control Zone Devices

2/29/16: Numerous revisions to EPG 616.6 include providing guidance for portable, post-mounted, vehicle-mounted and barrier-mounted signs. In EPG 616.6.61 Arrow Boards, guidance was added for sequential arrow and alternating diamond caution modes.

EPG 616.3 Temporary Traffic Control Elements

2/29/16: Updated the buffer/work area channelizing spacings in Table 616.3.5 and the recommended lengths of longitudinal buffer spaces in Table 616.3.6.

EPG 153 Agreements and Contracts

2/25/16: This new article provides details on each step and other important information needed to properly execute agreements. EPG 235.2.3 Municipal Agreements and County Agreements now provides specific instructions for municipal and county agreements not covered in EPG 153.

EPG 141.1.5 Approval Process

2/25/16: Revised to provide clearer guidance on the approval process for the Cost Share/Economic Development Program.

Bituminous Base and Pavement Gradation and Quality Assurance Testing

2/25/16: In EPG 401.2.4 Gradation Control,the density testing requirements were revised. In EPG 401.2.8 Quality Assurance, the quality assurance requirements for specific tests and requirements for a failed test were revised.