User contributions for Smithk
Jump to navigation
Jump to search
6 January 2010
- 11:1311:13, 6 January 2010 diff hist 0 N File:Figure 642.1.4.2.2.jpg No edit summary current
- 11:1111:11, 6 January 2010 diff hist 0 N File:Figure 642.1.4.2.1.jpg No edit summary current
- 11:1111:11, 6 January 2010 diff hist 0 N File:Figure 642.1.4.1.jpg No edit summary current
- 11:1011:10, 6 January 2010 diff hist 0 N File:Figure 642.1.3 grates.jpg No edit summary current
- 11:1011:10, 6 January 2010 diff hist 0 N File:642.1 drainage.jpg No edit summary current
- 11:1011:10, 6 January 2010 diff hist 0 N File:642.1 manholes.jpg No edit summary current
- 11:0911:09, 6 January 2010 diff hist 0 N File:642.1 Protruding Branches.jpg No edit summary current
- 11:0911:09, 6 January 2010 diff hist 0 N File:642.1 Drainage Vegetation.jpg No edit summary current
- 11:0911:09, 6 January 2010 diff hist 0 N File:642.1 Step Separation.jpg No edit summary current
- 11:0911:09, 6 January 2010 diff hist 0 N File:642.1 Cracked Concrete.jpg No edit summary current
- 11:0811:08, 6 January 2010 diff hist 0 N File:642.1.3 changes in level.jpg No edit summary current
- 11:0711:07, 6 January 2010 diff hist 0 N File:642.1.2.2.jpg No edit summary current
- 11:0711:07, 6 January 2010 diff hist 0 N File:642.1.2.jpg No edit summary current
- 11:0611:06, 6 January 2010 diff hist 0 N File:642.1.2.1.jpg No edit summary current
- 11:0511:05, 6 January 2010 diff hist +17,196 N 642.8 Sidewalk Design Criteria Expanded pedestrian guidance that includes ADA, per Design
- 10:5910:59, 6 January 2010 diff hist 0 N File:642 Project Analysis.jpg No edit summary current
- 10:5810:58, 6 January 2010 diff hist 0 N File:642.jpg No edit summary current
- 10:5210:52, 6 January 2010 diff hist +15,306 Category:642 Pedestrian Facilities Expanded ADA guidance for pedestrian facilities, per Design and Non-Motorized Transportation Engr.
5 January 2010
- 15:1515:15, 5 January 2010 diff hist +76 m Main Page Physical Lab's revision to EPG 123.3 noted
- 15:1015:10, 5 January 2010 diff hist +38,447 m Category:123 Federal-Aid Highway Program per Physical Laboratory, EPG 123.3 updated to show provide Independent Assurance Samples guidance for the System Based program
- 14:1714:17, 5 January 2010 diff hist 0 m 620.14 3M Installation Contract updated contact info on 3M Request Form
- 14:1414:14, 5 January 2010 diff hist 0 N File:620.12 3MStripeRequestForm2009.xls No edit summary current
- 14:1314:13, 5 January 2010 diff hist 0 m 620.14 3M Installation Contract updated contact info on 3M Stripe Request Form
- 14:1314:13, 5 January 2010 diff hist −150 m 620.14 3M Installation Contract →620.12.12 Appendix C - 3M Administration Process: per CM, updated contact personnel info and deleted outdated info
4 January 2010
- 15:1015:10, 4 January 2010 diff hist 0 N File:751.jpg No edit summary current
31 December 2009
- 08:2008:20, 31 December 2009 diff hist +4 m 616.27 Traffic Control for Field Operations →Recommended Length of Longitudinal Buffer Spaces: Clarification, per Traffic
- 08:1708:17, 31 December 2009 diff hist −111 m 616.27 Traffic Control for Field Operations →616.23.2.5.7 Pavement Markings: clarification, per Traffic
29 December 2009
- 13:0413:04, 29 December 2009 diff hist −32 m Where to Find PDM Information in the EPG →Chapter IX, Hydraulics and Drainage: updated EPG article's title
- 07:3807:38, 29 December 2009 diff hist −22 m 643.2 Utilities in Program Delivery →643.2.1.37 Utility Permit Application Provisions for Work on MHTC Right of Way: updated link to "utility permit"
28 December 2009
- 13:4613:46, 28 December 2009 diff hist −2 m Category:1136 Modified Urethane or Polyurethane Elastomeric Coating →Qualification Testing: per CM, updated a title
- 13:4513:45, 28 December 2009 diff hist +26 m Category:1043 Fence Material →1043.2 Procedure: per CM, updated a title
- 13:4313:43, 28 December 2009 diff hist 0 m Category:801 Lime and Fertilizer →Material (Sec 801.2): per CM, updated a title
- 13:4213:42, 28 December 2009 diff hist +14 m 320.1 Preliminary Geotechnical Report (PGR) →320.1.3.1.2 Subsurface Logs for Preliminary Geotechnical Report: per CM, updated a title
- 13:4113:41, 28 December 2009 diff hist +17 m 617.3 Material Inspection for Sec 617 →617.3.3 Report: per CM, updated a title
- 12:4812:48, 28 December 2009 diff hist +16 m 236.5 Property Management →236.5.3 Asset Management Committee: updated Operations Engineer title to Construction and Materials Engineer
- 12:4612:46, 28 December 2009 diff hist +2 m Category:203 Roadway and Drainage Excavation, Embankment and Compaction →Construction Requirements (Sec 203.4): updated Operations Engineer title to Construction and Materials Engineer
- 12:4312:43, 28 December 2009 diff hist +16 m 230.2 Vertical Alignment →230.2.10 Bridge Considerations: updated Operations Engineer title to Construction and Materials Engineer
- 12:4112:41, 28 December 2009 diff hist +48 m Category:403 Asphaltic Concrete Pavement →403.2.5 Report: updated Operations Engineer title to Construction and Materials Engineer
- 12:3812:38, 28 December 2009 diff hist +16 m Category:1030 Vitrified Clay Sewer and Culvert Pipe →1030.3 Reports (Records): updated Operations Engineer title to Construction and Materials Engineer
- 12:3612:36, 28 December 2009 diff hist +16 m Category:1031 Clay Drain Tile →1031.3 Report (Reords): updated Operations Engineer title to Construction and Materials Engineer
- 12:3512:35, 28 December 2009 diff hist +16 m Category:1032 Precast Concrete Flared End Sections →1032.2.2 Acceptance by Certification Method: updated Operations Engineer title to Construction and Materials Engineer
- 12:3412:34, 28 December 2009 diff hist +16 m Category:1070 Water →1070.2 Procedure: updated Operations Engineer title to Construction and Materials Engineer
- 12:3312:33, 28 December 2009 diff hist +16 m Category:413 Surface Treatments and Preventive Maintenance updated Operations Engineer title to Construction and Materials Engineer
- 12:2812:28, 28 December 2009 diff hist +16 m 643.4 Railroads →643.4.1.5 Crossing Surfaces: updated Operations Engineer title to Construction and Materials Engineer
- 12:2712:27, 28 December 2009 diff hist +16 m Category:1101 Materials Purchased by a Department Purchase Order →1101.1 Procedure: updated Operations Engineer title to Construction and Materials Engineer
- 12:2612:26, 28 December 2009 diff hist +16 m 903.2 Extent of Signing →903.1.10 Quantity Computations (MUTCD Section 2A.04d): updated Operations Engineer title to Construction and Materials Engineer
- 12:2412:24, 28 December 2009 diff hist +32 m Category:1029 Fabricating Prestressed Concrete Members for Bridges →1029.2 Procedure: updated Operations Engineer title to Construction and Materials Engineer
- 12:1612:16, 28 December 2009 diff hist +16 m Category:450 Bituminous Pavement Design →450.5 Payment: updated Operations Engineer title to Construction and Materials Engineer
- 12:1012:10, 28 December 2009 diff hist +16 m Category:645 Mailbox Turnouts and Supports updated Operations Engineer title to Construction and Materials Engineer
- 12:0912:09, 28 December 2009 diff hist +15 m Category:402 Bituminous Surface Leveling →402.2.9 Construction Requirements (Sec 402.10): updated Operations Engineer title to Construction and Materials Engineer