User contributions for Smithk
Jump to navigation
Jump to search
26 October 2012
- 13:4913:49, 26 October 2012 diff hist 0 N File:902.11 Advance Flasher Figures 2012.doc No edit summary current
- 13:4813:48, 26 October 2012 diff hist +5 m 902.18 Flashing Beacons (MUTCD Chapter 4S) →902.12.7 Procedures For Advance Beacon Installations by Outside Parties: Updated Fig. 902.11 to correct an EPG article reference.
- 13:1913:19, 26 October 2012 diff hist −5,870 m 751.40 LFD Widening and Repair →751.40.2 Typical Sections of Concrete Repairs: Per Bridge, replaced deck repair and filled joint figures and guidance with links
25 October 2012
- 14:3114:31, 25 October 2012 diff hist +30 m Main Page EPG 134
- 14:2814:28, 25 October 2012 diff hist +368 m LPA:136.13 LPA Policy Changes EPG 136.4
- 14:2714:27, 25 October 2012 diff hist 0 N File:Fig. 136.4.14 2012.doc No edit summary current
- 14:2614:26, 25 October 2012 diff hist +15 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, updated Fig. 136.4.14 to reflect changing mileage reimbursable rates from the IRS rate to GSA's current POV Mileage Reimbursable Rate.
- 14:2214:22, 25 October 2012 diff hist +64 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.2.7.2 Basis of Payment: Per LP, changed the mileage reimbursable rates from the IRS rate to GSA's current POV Mileage Reimbursable Rate.
- 14:2014:20, 25 October 2012 diff hist +64 m Category:134 Engineering Professional Services →134.3.5 Basis of Payment: Per Design, changed the mileage reimbursable rates from the IRS rate to GSA's current POV Mileage Reimbursable Rate.
- 13:5513:55, 25 October 2012 diff hist −2 m 751.50 Standard Detailing Notes →A4b. Steel Structures- Weathering Steel: Per Bridge, minor correction
- 13:2313:23, 25 October 2012 diff hist 0 m Main Page No edit summary
24 October 2012
- 10:4310:43, 24 October 2012 diff hist 0 N File:Figure 903.2.26.1 2012.jpg No edit summary current
- 10:4310:43, 24 October 2012 diff hist +5 m 903.2 Extent of Signing →903.2.26 Location Standardization (MUTCD Section 2A.16): Per Traffic, updated figure to correspond to EPG guidance
23 October 2012
- 15:0615:06, 23 October 2012 diff hist −131 m 903.3 Warning Signs and Object Markers (MUTCD Chapter 2C) →903.6.6 Placement of Warning Signs (MUTCD Section 2C.05)
- 15:0415:04, 23 October 2012 diff hist +30 m Main Page EPG 903.6.6
- 14:4814:48, 23 October 2012 diff hist +10 m 903.3 Warning Signs and Object Markers (MUTCD Chapter 2C) →903.6.6 Placement of Warning Signs (MUTCD Section 2C.05)
- 14:4614:46, 23 October 2012 diff hist +433 m 903.3 Warning Signs and Object Markers (MUTCD Chapter 2C) →903.6.6 Placement of Warning Signs (MUTCD Section 2C.05): Per Traffic, added a statement reiterating useful guidance for the districts
- 14:3614:36, 23 October 2012 diff hist −11 m 616.6 Temporary Traffic Control Zone Signs - General (MUTCD Chapter 6F) →616.6.46 STEEL PLATE AHEAD Sign (WO8-24) (MUTCD 6F.46): Per Traffic, minor clarification
- 07:0807:08, 23 October 2012 diff hist +314 m LPA:136.13 LPA Policy Changes Fig. 136.12 removed
- 07:0507:05, 23 October 2012 diff hist −101 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.3.3.1 Commonly Used Forms: Per LPA, removed "Fig. 136.12 Sample Form for Submitting Invoices". This form is out-of-date and has been relabeled elsewhere.
22 October 2012
- 13:4913:49, 22 October 2012 diff hist +2 m LPA:136.13 LPA Policy Changes No edit summary
- 13:4813:48, 22 October 2012 diff hist +113 LPA:136.13 LPA Policy Changes Fig. 136.9.12
- 13:4713:47, 22 October 2012 diff hist −2 m LPA:136.9 Plans, Specs and Estimates (PSE) Per LPA, slightly modified cross slope compliance guidance in Fig. 136.9.12
- 13:4613:46, 22 October 2012 diff hist 0 N File:136.9.12 Oct 2012.doc No edit summary
- 13:4613:46, 22 October 2012 diff hist −1 m LPA:136.12 Figures, Glossary and Other Useful Links Per LPA, slightly modified cross slope compliance guidance in Fig. 136.9.12
- 11:2111:21, 22 October 2012 diff hist −31 m Main Page EPG 101
- 10:5310:53, 22 October 2012 diff hist 0 N File:Job Order Contracts Oct 22, 2012.docx No edit summary
- 10:5210:52, 22 October 2012 diff hist 0 N File:101 Request for Transfer of Inpsected Materials.pdf No edit summary
- 10:5110:51, 22 October 2012 diff hist −35 m Category:101 Standard Forms Per CM, updated two forms. One of the forms, "Request for Transfer of Inspected Materials", was completely replaced with new form with same title.
19 October 2012
- 15:0215:02, 19 October 2012 diff hist +6 m Main Page No edit summary
- 13:3013:30, 19 October 2012 diff hist 0 m Main Page No edit summary
18 October 2012
- 14:1914:19, 18 October 2012 diff hist 0 N File:104.11 Completed SIMS form 2012.pdf No edit summary
- 14:1814:18, 18 October 2012 diff hist +2 m 104.11 Project Scoping Documentation Updated completed SIMS form
- 14:1314:13, 18 October 2012 diff hist +84 m Main Page No edit summary
- 13:2413:24, 18 October 2012 diff hist 0 N File:Main Page 3 Oct 18, 2012.jpg No edit summary current
- 13:2413:24, 18 October 2012 diff hist 0 N File:Main Page 2 Oct 18, 2012.jpg No edit summary current
- 13:2413:24, 18 October 2012 diff hist 0 N File:Main Page Oct 18, 2012.jpg No edit summary current
- 13:2313:23, 18 October 2012 diff hist −51 m Main Page new photos
- 12:5712:57, 18 October 2012 diff hist +95 m Main Page EPG 616.23, QRG, EPG FAST
- 12:3812:38, 18 October 2012 diff hist −1,131 m Federal-Aid Acceptance Sampling and Testing Per CM, revision is a result of switching from project-based to system-based Indep. Assurance & going to a QC/QA sampling & testing approach on "On-system" work.
- 12:3012:30, 18 October 2012 diff hist +1,056 m Category:205 Modified Subgrade →205.2.2.3.6 Physical tests: Per CM, revision is a result of switching from project-based to system-based Indep. Assurance & going to a QC/QA sampling & testing
- 12:2712:27, 18 October 2012 diff hist +597 m Category:302 Stabilized Permeable Base →302.2.1 Procedure: Per CM, revision is a result of switching from project-based to system-based Indep. Assurance & going to a QC/QA sampling & testing
- 12:2312:23, 18 October 2012 diff hist −6,111 m Category:123 Federal-Aid Highway Program →123.3.3 Federal-Aid Acceptance Sampling and Testing (FAST): Per CM, revision is a result of switching from project-based to system-based Indep. Assurance & going to a QC/QA sampling & testing
- 11:1311:13, 18 October 2012 diff hist 0 N File:Job Order Contracts Oct 2012.docx No edit summary
- 11:1211:12, 18 October 2012 diff hist 0 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, updated Job Order Contracts QRG
- 11:0211:02, 18 October 2012 diff hist +4 m 751.10 General Superstructure →751.10.1.7.2 Standard Partial Depth P/C P/S Panel Slab Details Using SIP Forms
- 11:0111:01, 18 October 2012 diff hist +860 751.10 General Superstructure Per Bridge, minor clarifications
- 10:3410:34, 18 October 2012 diff hist +5 m 616.16 Typical Applications (MUTCD Chapter 6P) Per Traffic, updated Fig. 616.8.10a to correct a minor error
- 10:3310:33, 18 October 2012 diff hist 0 N File:616.8.10a 2012.pdf No edit summary
- 10:3210:32, 18 October 2012 diff hist +10 m 616.27 Traffic Control for Field Operations Per Traffic, updated Fig. 616.8.10a to correct a minor error