User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 12:14, 2 April 2013 diff hist -293 m Main Page EPG 903
- 11:26, 2 April 2013 diff hist 0 N File:903 Sign Log Inspection.ppt current
- 11:25, 2 April 2013 diff hist +169 m Category:903 Highway Signing →MoDOT 5-Year Plan for Signing – Practical Operations: Per Traffic, added sign log inspection Power Point
- 11:16, 2 April 2013 diff hist +93 m LPA talk:136.1 Introduction
- 11:14, 2 April 2013 diff hist -38 m LPA:136.1 Introduction →136.1.3.1 Planning and Programming Process: updated link
- 11:08, 2 April 2013 diff hist +138 m LPA:136.13 LPA Policy Changes Fig. 136.4.8
- 11:05, 2 April 2013 diff hist +4 m LPA:136.12 Figures, Glossary and Other Useful Links Per LPA, Fig. 136.4.8 updated with new logo
- 11:04, 2 April 2013 diff hist 0 N File:Fig. 136.4.8 Apr 2013.doc current
- 11:04, 2 April 2013 diff hist +4 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, Fig. 136.4.8 updated with new logo
- 10:58, 2 April 2013 diff hist 0 N File:134.5.2 2013.docx
- 10:58, 2 April 2013 diff hist 0 N File:134.4.2 2013.docx
- 10:57, 2 April 2013 diff hist 0 N File:134.4.1 2013.docx
- 10:57, 2 April 2013 diff hist 0 N File:134.2.2.5.7 2013.docx
- 10:57, 2 April 2013 diff hist 0 N File:134.2.2.5.6 2013.docx
- 10:57, 2 April 2013 diff hist 0 N File:134.2.2.5.4 2013.doc current
- 10:56, 2 April 2013 diff hist 0 N File:134.2.2.5.3 2013.docx
- 10:56, 2 April 2013 diff hist -9 m Category:134 Engineering Professional Services Per Design, updated memo logo for several figures
- 10:37, 2 April 2013 diff hist +6 m 751.1 Preliminary Design Per Design, removed metric info on 3R Design Standards (Rural)
- 10:35, 2 April 2013 diff hist 0 N File:128 3R Design Standards (Rural) 2013.docx current
- 10:35, 2 April 2013 diff hist -2 m Category:128 Conceptual Studies Per Design, removed metric info on 3R Design Standards (Rural)
- 13:06, 1 April 2013 diff hist 0 N File:Main Page Apr 1, 2013.jpg current
- 13:06, 1 April 2013 diff hist -273 m Main Page new photo
- 10:05, 1 April 2013 diff hist +1 m Main Page
- 09:56, 1 April 2013 diff hist -6 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 07:17, 1 April 2013 diff hist 0 N File:101 Precon letter, state 100th.docx
- 07:17, 1 April 2013 diff hist 0 N File:101 Precon letter, federal 100th.docx
- 07:17, 1 April 2013 diff hist 0 N File:101 Precon letter, federal no trainees 100th.docx
- 07:16, 1 April 2013 diff hist +13 m Category:101 Standard Forms →Construction and Materials: Per CM, updated three Precon letters
- 12:48, 29 March 2013 diff hist +129 m 617.1 Temporary Traffic Barriers →617.1.1 Temporary Concrete Traffic Barrier – Type F: updated link
- 14:23, 28 March 2013 diff hist 0 m Main Page
- 14:34, 27 March 2013 diff hist +3 m Help Article →EPG Approval Process
- 13:23, 27 March 2013 diff hist +1,125 m Help Article →EPG Approval Process: added EPG Ballot Cycles table
- 12:28, 27 March 2013 diff hist -2 m Main Page
- 12:25, 27 March 2013 diff hist 0 N File:Main Page Mar 27, 2013.jpg current
- 12:24, 27 March 2013 diff hist +268 m Main Page EPG 805.1
- 10:39, 27 March 2013 diff hist +151 m Category:805 Seeding →Acceptance (Sec 805.4): Per CM, updated this subarticle to comply with recent changes to Sec 805.4.
- 10:23, 27 March 2013 diff hist +107 m LPA:136.13 LPA Policy Changes Fig. 136.4.1
- 10:22, 27 March 2013 diff hist +4 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.4.1
- 10:20, 27 March 2013 diff hist 0 N File:Fig. 136.4.1 Mar 2013.docx
- 10:19, 27 March 2013 diff hist +20 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, minor revision to Fig. 136.4.1 ESC
- 10:07, 27 March 2013 diff hist +20 m LPA:136.7 Design →136.7.6 Public Hearings: update dlink
- 14:47, 25 March 2013 diff hist -244 m 751.1 Preliminary Design →751.1.2.18 Soundings (Borings): Per Bridge, removed archaic gif files
- 14:30, 25 March 2013 diff hist 0 N File:M-40 2013.docx current
- 14:29, 25 March 2013 diff hist -49 m Category:101 Standard Forms →Design Forms: Per Bridge, updated M-40 form with new geotechnical director's name
- 14:04, 25 March 2013 diff hist -102 m Main Page EPG 641
- 13:51, 25 March 2013 diff hist +282 m Category:641 Bicycle Facilities Per Engineering Policy Group, guidance was generally clarified
- 13:29, 22 March 2013 diff hist +29 m Main Page
- 12:32, 22 March 2013 diff hist -355 m Main Page Form BR 105 R
- 12:26, 22 March 2013 diff hist -16 m 751.1 Preliminary Design Per Bridge, Form Br 105 R shortened to include only district info needed to design bridge.
- 12:25, 22 March 2013 diff hist -130 m 748.7 Bridge Reports and Layouts Per Bridge, Form Br 105 R shortened to include only district info needed to design bridge.