User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 11:01, 11 April 2013 diff hist 0 N File:Safety begins with me.jpg current
- 11:01, 11 April 2013 diff hist +6 m Main Page
- 09:25, 11 April 2013 diff hist -80 m 103.1 Bid Opening and Award Process →103.1.2 Bid Opening Location: removed photo
- 09:23, 11 April 2013 diff hist -189 m Category:139 Design - Build removed photo
- 09:13, 11 April 2013 diff hist +154 m Talk:237.8 Contract Time current
- 09:10, 11 April 2013 diff hist +257 m 237.8 Contract Time Added link to Road User Cost Request Form
- 08:55, 11 April 2013 diff hist 0 N File:236.7 Form 7-2.5B(1).docx
- 08:55, 11 April 2013 diff hist 0 N File:236.7 Form 7-2.5A.docx
- 08:55, 11 April 2013 diff hist 0 N File:236.7 Form 7-7.3A.docx
- 08:55, 11 April 2013 diff hist 0 N File:236.7 Form 7-7.3.docx
- 08:54, 11 April 2013 diff hist +14 m 236.7 Negotiation Per RW, updated four forms (7.2.5A, 7.2.5B(1), 7.7.3, 7.7.3A)
- 08:11, 11 April 2013 diff hist 0 N File:616.25 WZ Coord Contacts Apr 2013.docx
- 08:11, 11 April 2013 diff hist -4 m 616.25 MoDOT Work Zone Guidelines Per Traffic, updated WZ Coordinators Contacts
- 09:18, 8 April 2013 diff hist +238 m Talk:903.18 Signing for School Areas
- 09:16, 8 April 2013 diff hist +66 m Main Page EPG 903.19
- 08:58, 8 April 2013 diff hist 0 N File:S5-3.jpg current
- 08:58, 8 April 2013 diff hist 0 N File:903.19.14 assembly.jpg current
- 08:57, 8 April 2013 diff hist 0 N File:903.19.13 bus.jpg current
- 08:57, 8 April 2013 diff hist 0 N File:S1-1 W16-7P.jpg current
- 08:56, 8 April 2013 diff hist 0 N File:S1-1 W16-9P.jpg current
- 08:56, 8 April 2013 diff hist +13 m 903.18 Signing for School Areas
- 08:55, 8 April 2013 diff hist 0 N File:S5-2.jpg current
- 08:54, 8 April 2013 diff hist 0 N File:S1-1 S4-3P.jpg current
- 08:54, 8 April 2013 diff hist 0 N File:S1-1 assembly.jpg current
- 08:53, 8 April 2013 diff hist 0 N File:W16-6P.jpg current
- 08:53, 8 April 2013 diff hist +2,710 m 903.18 Signing for School Areas Per Traffic, clarification and additional guidance provided
- 08:12, 8 April 2013 diff hist +27 m Category:908 Traffic Controls for School Areas updated link
- 08:12, 8 April 2013 diff hist +27 m 620.2 Pavement and Curb Markings (MUTCD Chapter 3B) updated link
- 10:32, 5 April 2013 diff hist 0 m Main Page
- 14:44, 4 April 2013 diff hist 0 N File:236.16 ODA Controlled Routes Description 2013.pdf
- 14:44, 4 April 2013 diff hist -7 m 236.16 Outdoor Advertising Per RW, updated Controlled Routes Description
- 14:42, 4 April 2013 diff hist 0 N File:236.17 JY Controlled Routes Description 2013.pdf
- 14:41, 4 April 2013 diff hist -4 m 236.17 Junkyards Per RW, updated Controlled Routes Description
- 09:55, 4 April 2013 diff hist -107 m Category:606 Guardrail and Guard Cable removed old link
- 09:31, 4 April 2013 diff hist 0 N File:Main Page 2 Apr 4, 2013.jpg current
- 09:30, 4 April 2013 diff hist 0 N File:Main Page Apr 4, 2013.jpg current
- 09:30, 4 April 2013 diff hist -62 m Main Page EPG 236.7
- 09:17, 4 April 2013 diff hist -22 m 236.7 Negotiation Per RW, in EPG 237.7.2.9, replaced Form 7-7.3 with Vendor Input Form MO 300-1489; in EPG 236.7.7.3, replaced Form 7-7.3 with the IRS Form W-9.
- 07:16, 4 April 2013 diff hist +162 m LPA:136.13 LPA Policy Changes Fig. 136.4.14
- 07:14, 4 April 2013 diff hist 0 m LPA:136.12 Figures, Glossary and Other Useful Links Per LPA, updated some references within the checklist of Fig. 136.4.14
- 07:13, 4 April 2013 diff hist 0 N File:Fig. 136.4.14 Apr 2013.doc current
- 07:13, 4 April 2013 diff hist 0 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, updated some references within the checklist of Fig. 136.4.14
- 07:09, 4 April 2013 diff hist 0 N File:134.2.2.5.7 Apr 2013.docx
- 07:08, 4 April 2013 diff hist 0 N File:134.2.2.5.6 Apr 2013.docx
- 07:08, 4 April 2013 diff hist +16 m Category:134 Engineering Professional Services Per Design, updated two memos with new director's title
- 13:03, 2 April 2013 diff hist -5 m Category:903 Highway Signing →MoDOT 5-Year Plan for Signing – Practical Operations
- 12:48, 2 April 2013 diff hist -3 m Main Page updated link
- 12:47, 2 April 2013 diff hist +185 m Category:903 Highway Signing →MoDOT 5-Year Plan for Signing – Practical Operations: Per Traffic, moved PowerPoint info
- 12:35, 2 April 2013 diff hist 0 N File:Main Page Apr 2, 2013.jpg current
- 12:35, 2 April 2013 diff hist -238 m Main Page new photo