User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 15:12, 3 June 2013 diff hist -449 m 616.25 MoDOT Work Zone Guidelines Per Design, removed archaic quotation
- 13:41, 31 May 2013 diff hist +334 m LPA:136.13 LPA Policy Changes EPG 136.4.2.7.3.2
- 13:39, 31 May 2013 diff hist +472 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.2.7.3.2 Subconsultant cost NOT exceeding $25,000: Per LPA, clarified that a subconsultant charging less than $25K must also submit the mgmt rep & cert form.
- 13:34, 31 May 2013 diff hist +5 m LPA:136.12 Figures, Glossary and Other Useful Links Per LPA, "unprotected" file used for Fig. 136.5.4.
- 13:33, 31 May 2013 diff hist 0 N File:136.5.4 2013.doc current
- 13:33, 31 May 2013 diff hist +5 m LPA:136.5 Non-Infrastructure Per LPA, "unprotected" file used for Fig. 136.5.4.
- 15:28, 30 May 2013 diff hist 0 N File:Main Page May 30, 2013.jpg current
- 15:28, 30 May 2013 diff hist 0 N File:Main Page 2 May 30, 2013.jpg current
- 15:28, 30 May 2013 diff hist +310 m Main Page new photos
- 14:57, 30 May 2013 diff hist +67 m 616.14 Work Zone Safety and Mobility Policy Per Traffic, minor clarifications
- 14:45, 30 May 2013 diff hist +760 m LPA:136.13 LPA Policy Changes EPG 136.4 and Fig. 136.9.3
- 14:38, 30 May 2013 diff hist 0 m LPA:136.12 Figures, Glossary and Other Useful Links Per LPA, Figs. 136.4.7, 136.4.14 and 136.9.3
- 14:36, 30 May 2013 diff hist 0 N File:Fig. 136.4.14 May 2013.doc current
- 14:34, 30 May 2013 diff hist 0 N File:136.4.7 May 2013.doc current
- 14:34, 30 May 2013 diff hist +212 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, added to Figs. 136.4.7 and 136.4.14 info ensuring haz waste inspections & reports were being done. Also, added EPG 136.4.4 Constr Eng'g and Constr Admin that links to EPG 136.11.
- 13:56, 30 May 2013 diff hist 0 N File:136.9.3 May 24, 2013.doc
- 13:55, 30 May 2013 diff hist 0 m LPA:136.9 Plans, Specs and Estimates (PSE) Per LPA, added revision date to the bottom of Fig. 136.9.3
- 10:01, 24 May 2013 diff hist 0 m Main Page
- 14:37, 23 May 2013 diff hist 0 m Main Page
- 13:43, 22 May 2013 diff hist +198 m Main Page
- 12:29, 22 May 2013 diff hist 0 File:Main Page May 22, 2013.jpg uploaded a new version of "Image:Main Page May 22, 2013.jpg" current
- 12:27, 22 May 2013 diff hist 0 N File:Main Page May 22, 2013.jpg
- 12:27, 22 May 2013 diff hist -6 m Main Page new photo
- 10:50, 22 May 2013 diff hist +18 m 236.7 Negotiation updated link for Approved Contract Negotiators
- 08:20, 22 May 2013 diff hist 0 m 236.3 Administration →236.3.7.3 Contents of Clearance Certification: Per RW, minor corrections
- 13:46, 21 May 2013 diff hist 0 N File:Main Page May 21, 2013.jpg current
- 13:46, 21 May 2013 diff hist +84 m Main Page new photo
- 12:24, 21 May 2013 diff hist +222 m LPA:136.13 LPA Policy Changes EPG 136.7.6
- 12:16, 21 May 2013 diff hist +346 m LPA:136.7 Design →136.7.6 Public Hearings: Per LPA, approved preliminary plan is to be available for public viewing/display during the 21-day advertisement period.
- 13:23, 20 May 2013 diff hist 0 N File:Main Page May 20, 2013.jpg current
- 13:22, 20 May 2013 diff hist -23 m Main Page new photo
- 13:10, 20 May 2013 diff hist +7 m 643.3 Policy, Standards and Regulations →643.3.14 Utility Permit Procedures
- 13:10, 20 May 2013 diff hist 0 N File:643.3.15.jpg current
- 13:09, 20 May 2013 diff hist +122 m 643.3 Policy, Standards and Regulations new photo
- 11:26, 20 May 2013 diff hist +3 m Main Page
- 10:58, 17 May 2013 diff hist 0 N File:Main Page May 17, 2013.jpg current
- 10:58, 17 May 2013 diff hist +70 m Main Page new photo
- 10:27, 17 May 2013 diff hist 0 N File:134.2.2.2 May 2013.doc current
- 10:26, 17 May 2013 diff hist 0 m Category:134 Engineering Professional Services Per Design, two spelling corrections in Fig. 134.2.2.2
- 07:54, 17 May 2013 diff hist +1 m LPA:136.13 LPA Policy Changes
- 07:34, 17 May 2013 diff hist +221 m LPA:136.13 LPA Policy Changes Figs. 136.9.1 and 136.9.3.
- 07:32, 17 May 2013 diff hist +8 m LPA:136.12 Figures, Glossary and Other Useful Links Per LPA, added minor clarification to Figs. 136.9.1 and 136.9.3.
- 07:31, 17 May 2013 diff hist 0 N File:136.9.3 May 17, 2013.doc
- 07:30, 17 May 2013 diff hist 0 N File:136.9.1 May 17, 2013.xlsx
- 07:30, 17 May 2013 diff hist +48 m LPA:136.9 Plans, Specs and Estimates (PSE) Per LPA, added minor clarification to Figs. 136.9.1 and 136.9.3.
- 14:58, 16 May 2013 diff hist +212 m LPA:136.13 LPA Policy Changes EPG 136.4.2.7.5
- 14:55, 16 May 2013 diff hist +375 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.2.7.4 Ceasing Negotiation: Per LPA, new guidance about contract execution timeframe
- 14:49, 16 May 2013 diff hist +113 m Main Page EPG 751.6.2
- 14:39, 16 May 2013 diff hist +52 m 751.50 Standard Detailing Notes Per Bridge, amended Standard detailing Notes for editorial corrections.
- 14:27, 16 May 2013 diff hist +223 m 751.6 General Quantities →751.6.2 Computation of Estimated Quantities: Per Bridge, amended Non-Destructive Testing to specifically require only welds of terminal sections of cover plates in tension areas to be checked.