User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 09:59, 11 July 2013 diff hist 0 N File:751.22.1.4 Non-integral end bents.jpg current
- 09:59, 11 July 2013 diff hist 0 N File:751.22.1.4 Integral end bents.jpg current
- 09:58, 11 July 2013 diff hist +209 m 751.22 Prestressed Concrete I Girders →751.22.1.4 Span and Structure Lengths: Per Bridge, clarified usage of plain and laminated bearing pads. Added bearing pad length requirements for P/S NU girders and P/S Spread Box Beams.
- 09:27, 11 July 2013 diff hist +1 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.4.14
- 09:26, 11 July 2013 diff hist +148 m LPA:136.13 LPA Policy Changes Fig. 136.4.14
- 09:25, 11 July 2013 diff hist 0 N File:Fig. 136.4.14 July 2013.doc current
- 09:24, 11 July 2013 diff hist +3 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, updated Fig. 136.4.14's checklist to be more helpful
- 08:54, 11 July 2013 diff hist +1 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.2.9 MoDOT Review of Consultant Contract
- 08:40, 11 July 2013 diff hist +535 m LPA:136.13 LPA Policy Changes EPG 136.4
- 08:35, 11 July 2013 diff hist +581 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA and Audits and Investigations, revisions result from AI ceasing the pre-negotiations reviews and shifting the reviews to project managers and/or contract administrators
- 07:57, 11 July 2013 diff hist 0 N File:Main Page 2 July 11, 2013.jpg current
- 07:57, 11 July 2013 diff hist 0 N File:Main Page July 11, 2013.jpg current
- 07:56, 11 July 2013 diff hist +66 m Main Page new photos
- 13:45, 10 July 2013 diff hist -16 m 751.6 General Quantities →751.6.2.17 Excavation
- 11:27, 10 July 2013 diff hist -45 m Main Page EPG 751.6.2
- 11:21, 10 July 2013 diff hist +100 m 751.50 Standard Detailing Notes →B3c. Slabs: Per Bridge, updated note to clarify measurement
- 11:18, 10 July 2013 diff hist -170 m 751.6 General Quantities Per Bridge, expanded guidance for Bridge Slabs (formerly "Slab Quantity")
- 09:02, 10 July 2013 diff hist +103 m Main Page EPG 121.3
- 08:37, 10 July 2013 diff hist +18 m 121.3 The Statewide Transportation Improvement Program (STIP) Updated STIP link
- 08:19, 10 July 2013 diff hist -63 m LPA:136.3 Federal Aid Basics →136.3.8.2.2 Project Eligibility and Selection
- 08:11, 10 July 2013 diff hist -8 m LPA:136.3 Federal Aid Basics Updated Fig. 136.4.10
- 10:15, 9 July 2013 diff hist 0 N File:134.2.2.2 July 2013.doc current
- 10:15, 9 July 2013 diff hist 0 m Category:134 Engineering Professional Services Per Design, minor cosmetic update for Fig. 134.2.2.2
- 10:08, 9 July 2013 diff hist 0 N File:Main Page July 9, 2013.jpg current
- 10:08, 9 July 2013 diff hist +142 m Main Page new photo
- 07:55, 9 July 2013 diff hist 0 N File:616.19 Quality Standards 2013.pdf
- 07:55, 9 July 2013 diff hist +5 m 616.19 Quality Standards for Temporary Traffic Control Devices updated pdf with new pictures
- 07:19, 9 July 2013 diff hist 0 m 616.19 Quality Standards for Temporary Traffic Control Devices →616.19.2.2.8 Sign Innovations
- 07:18, 9 July 2013 diff hist 0 N File:616.19.2.2.8 2013.jpg current
- 07:18, 9 July 2013 diff hist 0 N File:616.19.2.2.6 1 2013.jpg current
- 07:18, 9 July 2013 diff hist +10 m 616.19 Quality Standards for Temporary Traffic Control Devices →616.19.2.2 Signs: Per Traffic, updated pictures
- 07:02, 9 July 2013 diff hist -2 m 236.7 Negotiation →236.7.2.3 Prompt Offer of Just Compensation: Per RW, minor clarification
- 14:45, 8 July 2013 diff hist +21 m Main Page EPG 236.7.2.3
- 14:40, 8 July 2013 diff hist +120 m 236.7 Negotiation →236.7.2.3 Prompt Offer of Just Compensation: Per RW, a minimum offer has been established when acquiring realty rights
- 12:30, 8 July 2013 diff hist +61 m Main Page EPG 134.3.6
- 12:25, 8 July 2013 diff hist +365 m Category:134 Engineering Professional Services →134.3.6 Subconsultants: Per LPA and Audits and Investigations, updated link from MRC form to Consultant Certification of Indirect Cost form.
- 12:19, 8 July 2013 diff hist +225 m LPA:136.13 LPA Policy Changes EPG 136.4.2.7.3
- 12:16, 8 July 2013 diff hist -89 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.2.7.3 Subconsultants: Per LPA and Audits and Investigations, updated link from MRC form to Consultant Certification of Indirect Cost form.
- 11:18, 8 July 2013 diff hist -89 m Main Page EPG 402
- 10:51, 8 July 2013 diff hist 0 N File:402 JSP 2013.doc current
- 10:51, 8 July 2013 diff hist 0 N File:402 Contract Leveling Course Guidelines 2013.pdf
- 10:51, 8 July 2013 diff hist 0 m Category:402 Bituminous Surface Leveling
- 10:50, 8 July 2013 diff hist -19 m Category:402 Bituminous Surface Leveling
- 10:47, 8 July 2013 diff hist 0 N File:402 MoDOT Pilot.pdf
- 10:47, 8 July 2013 diff hist 0 N File:402 MoDOT No Pilot.pdf
- 10:47, 8 July 2013 diff hist 0 N File:402 Contractor Pilot.pdf
- 10:47, 8 July 2013 diff hist 0 N File:402 Contractor No Pilot.pdf
- 10:46, 8 July 2013 diff hist +310 m Category:402 Bituminous Surface Leveling Per Design, JSP and CLC Guidelines revised. Also, the CLC Templates were expanded to 4 scenarios.
- 07:55, 8 July 2013 diff hist 0 m Category:129 Public Involvement →129.5 Section 4(f) and 6(f) Lands
- 14:17, 5 July 2013 diff hist -2 m 616.19 Quality Standards for Temporary Traffic Control Devices →616.19.2.15 Traffic Management