User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 08:31, 7 August 2013 diff hist 0 N File:751.14.jpg current
- 15:22, 6 August 2013 diff hist -239 m Main Page EPG 109.14
- 15:20, 6 August 2013 diff hist +74 m Category:109 Measurement and Payment →109.14 Price Adjustment for Fuel (for Sec 109.14): Per CM, concrete approach pavement added to the list of eligible fuel adjustment items.
- 15:02, 6 August 2013 diff hist +2 m Main Page EPG 134.2.4
- 14:57, 6 August 2013 diff hist +52 m Category:134 Engineering Professional Services →134.2.4 Consultant Solicitation and Selection Process – Standard Solicitation Method for On-Call/Hourly Rate Contracts: added link
- 14:56, 6 August 2013 diff hist -599 m Category:134 Engineering Professional Services /* 134.2.4 Conslt't Solt'n and Selct'n Process – Std Solt'n Method /Per Design, reminded PMs to wait on FHWA obligation before issuing NTP to consultants when contractract uses fed funds
- 08:48, 6 August 2013 diff hist +2 m Main Page
- 08:47, 6 August 2013 diff hist 0 N File:Main Page Aug 6, 2013.jpg current
- 08:46, 6 August 2013 diff hist +257 m Main Page new photo
- 07:25, 6 August 2013 diff hist +151 m LPA:136.13 LPA Policy Changes Fig/ 136.4.14
- 07:23, 6 August 2013 diff hist -1 m LPA:136.12 Figures, Glossary and Other Useful Links Per LPA, subconsultant requirements were updated for Fig. 136.4.14
- 07:22, 6 August 2013 diff hist 0 N File:Fig. 136.4.14 Aug 2013.doc current
- 07:22, 6 August 2013 diff hist -3 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, subconsultant requirements were updated in Fig. 136.4.14
- 07:12, 6 August 2013 diff hist -11 m 751.22 Prestressed Concrete I Girders Per Bridge, minor clarifications
- 13:30, 5 August 2013 diff hist 0 N File:Main Page Aug 5, 2013.jpg current
- 13:30, 5 August 2013 diff hist +289 m Main Page new photo
- 12:11, 5 August 2013 diff hist +35 m Category:712 Structural Steel Construction →712.1.5 High Strength Bolts And Washers (Sec 712.7): new photo
- 12:10, 5 August 2013 diff hist 0 N File:712.1.5.jpg current
- 15:21, 2 August 2013 diff hist +4 m Main Page
- 10:31, 2 August 2013 diff hist -48 m Main Page
- 10:27, 2 August 2013 diff hist 0 N File:Main Page 2 Aug 2, 2013.jpg current
- 10:27, 2 August 2013 diff hist 0 N File:Main Page Aug 2, 2013.jpg current
- 10:27, 2 August 2013 diff hist +50 m Main Page new photos
- 10:25, 1 August 2013 diff hist 0 N File:Main Page Aug 1, 2013.jpg current
- 10:25, 1 August 2013 diff hist -527 m Main Page EPG 134
- 09:55, 1 August 2013 diff hist -66 m Category:134 Engineering Professional Services Per Design, in EPG 134.4 AI review no longer required; in EPG 134.5.1, removed an obsolete email group
- 13:19, 29 July 2013 diff hist 0 N File:Main Page 2 July 29, 2013.jpg current
- 13:19, 29 July 2013 diff hist 0 N File:Main Page July 29, 2013.jpg current
- 13:18, 29 July 2013 diff hist -225 m Main Page new photos
- 12:31, 26 July 2013 diff hist 0 N File:Main Page July 26, 2013.jpg current
- 12:31, 26 July 2013 diff hist -309 m Main Page EPG 127.29
- 10:47, 26 July 2013 diff hist +3,685 Nm 127.29 Stormwater Per Environmental, this new article provides guidance for the MDNR's MS4 permit, which pertains to illicit discharges.
- 13:15, 25 July 2013 diff hist -63 m Category:139 Design - Build
- 10:00, 25 July 2013 diff hist 0 N File:Main Page July 25, 2013.jpg current
- 09:59, 25 July 2013 diff hist +3 m Main Page new photo
- 08:54, 25 July 2013 diff hist -1 m Category:Minor Routes Shouldering Project Guidelines →Constructability
- 07:52, 25 July 2013 diff hist 0 m 902.5 Traffic Control Signal Features (MUTCD Chapter 4D) →902.5.18 Visibility, Aiming, and Shielding of Signal Faces (MUTCD Section 4D.12)
- 07:09, 25 July 2013 diff hist +192 m 902.5 Traffic Control Signal Features (MUTCD Chapter 4D) →902.5.18 Visibility, Aiming, and Shielding of Signal Faces (MUTCD Section 4D.12): Updated link
- 13:20, 24 July 2013 diff hist +1 m Main Page
- 12:55, 24 July 2013 diff hist +135 m Main Page EPG 413.3
- 12:52, 24 July 2013 diff hist 0 N File:413.3.xlsx current
- 12:52, 24 July 2013 diff hist -33 m 413.3 Ultrathin Bonded Asphalt Wearing Surface Per Construction and Materials, replaced old Ashpalt Cement Price Index Example file with the new Asphalt Cement Price Adjustment spreadsheet for sq. yd. items.
- 11:22, 24 July 2013 diff hist -186 m Main Page EPG Minor Routes
- 10:20, 24 July 2013 diff hist 0 N File:Optional Shoulder JSP.doc current
- 10:19, 24 July 2013 diff hist -154 m Category:Minor Routes Shouldering Project Guidelines →Constructability: Per Design, replaced the reference to the obsolete Modified Shoulder JSP with the Optional Shoulder JSP.
- 07:26, 24 July 2013 diff hist -62,233 m 620.14 3M Installation Contract Per Traffic, since the 3M contract has expired, this article has been archived current
- 13:25, 23 July 2013 diff hist -158 m Main Page EPG 147.1
- 13:19, 23 July 2013 diff hist 0 N File:147.3.1 FAQ.pdf
- 13:19, 23 July 2013 diff hist 0 N File:147.3.1 white paper.pdf
- 13:19, 23 July 2013 diff hist 0 N File:147.3.1 guidelines.pdf