User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 12:40, 12 September 2013 diff hist +66 m 236.7 Negotiation updated links
- 08:37, 12 September 2013 diff hist +126 m 237.9 Submission of Plans and Supporting Documents →237.9.3 Project Submittal Schedule: Per Design, a link to a list federal involvement projects was added
- 07:06, 12 September 2013 diff hist 0 m 616.4 Pedestrian and Worker Safety (MUTCD Chapter 6D) Per Traffic, minor corrections
- 07:05, 12 September 2013 diff hist 0 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) updated links
- 14:57, 11 September 2013 diff hist +49 m Main Page
- 14:52, 11 September 2013 diff hist 0 N File:Main Page Sep 11, 2013.jpg current
- 14:51, 11 September 2013 diff hist -518 m Main Page
- 14:03, 11 September 2013 diff hist +401 m LPA:136.13 LPA Policy Changes Figs. 136.4.9, 136.8.25, 136.8.26 and 136.8.27
- 13:59, 11 September 2013 diff hist +16 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.1 Figures: Very minor editorial revisions to Figs. 136.4.9, 136.8.25, 136.8.26 and 136.8.27
- 13:57, 11 September 2013 diff hist 0 N File:136.4.9 Sept 2013.doc current
- 13:56, 11 September 2013 diff hist +2 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, updated Form 136.4.9 with only minor revisions
- 13:53, 11 September 2013 diff hist 0 N File:136.8.27 Sept 2013.doc current
- 13:53, 11 September 2013 diff hist 0 N File:136.8.26 Sept 2013.doc current
- 13:52, 11 September 2013 diff hist 0 N File:136.8.25 Sept 2013.doc current
- 13:52, 11 September 2013 diff hist +30 m LPA:136.8 Local Public Agency Land Acquisition Per RW, updated three forms. Very minor editorial updates.
- 13:37, 11 September 2013 diff hist -2 m 236.7 Negotiation →236.7.2.5 Offer Letter Formats: Per RW, minor editorial revisions
- 07:38, 11 September 2013 diff hist -31 m Main Page EPG Other Aspects of Pavement Design
- 07:30, 11 September 2013 diff hist -254 m Other Aspects of Pavement Design Per CM, "Pavement Design for Scoping" was removed because it presented an archaic set of tables. The MEPDG design tables will eventually be replaced but conflicts with industry at this time.
- 07:08, 11 September 2013 diff hist -1 m 751.22 Prestressed Concrete I Girders →751.22.1.1 Material Properties: minor clarification
- 15:04, 10 September 2013 diff hist +235 m 751.22 Prestressed Concrete I Girders →751.22.1.1 Material Properties: Per Bridge, revision aligns guidance w/ current practice. MoDOT no longer specifies HPC nor allows designer to choose concrete design strength based on analysis
- 13:25, 10 September 2013 diff hist +510 m 751.22 Prestressed Concrete I Girders Per Bridge, several clarifications for strand arrangements and order of material use for prestressing strand
- 13:02, 10 September 2013 diff hist 0 N File:Main Page Sep 10, 2013.jpg current
- 13:01, 10 September 2013 diff hist +439 m Main Page
- 08:37, 10 September 2013 diff hist -7 m 751.50 Standard Detailing Notes →H4. Conduit System: Per Bridge, minor correction
- 07:30, 10 September 2013 diff hist 0 N File:236.16.2 map 2013.jpg current
- 07:30, 10 September 2013 diff hist -4 m 236.16 Outdoor Advertising Per RW, updated map
- 07:22, 10 September 2013 diff hist +5 m 751.50 Standard Detailing Notes →H4. Conduit System: Per Bridge, correction
- 14:36, 9 September 2013 diff hist +25 m Main Page EPG 237.9.6.8
- 14:35, 9 September 2013 diff hist +245 m 237.9 Submission of Plans and Supporting Documents →237.9.6.8 Consultant Designed Projects: Per Design, added that the consultant needs to include the Certificate of Authority number in the title block.
- 13:18, 9 September 2013 diff hist -10,198 m Category:642 Pedestrian Facilities
- 13:04, 9 September 2013 diff hist +10,198 Category:642 Pedestrian Facilities
- 12:38, 9 September 2013 diff hist +12 m LPA:136.13 LPA Policy Changes
- 12:38, 9 September 2013 diff hist +231 m LPA:136.13 LPA Policy Changes EPG 136.4.1.5
- 12:35, 9 September 2013 diff hist +339 m Category:134 Engineering Professional Services →134.1.3 Consultant Qualification: Per Design, note added to clarify whether the Certificate of Authority is required
- 12:34, 9 September 2013 diff hist +339 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.1.5 Consultant Qualification: Per Design, note added to clarify whether the Certificate of Authority is required
- 11:05, 9 September 2013 diff hist -23 m Main Page EPG 402
- 10:49, 9 September 2013 diff hist 0 N File:402 JSP Sep 2013.doc current
- 10:49, 9 September 2013 diff hist +4 m Category:402 Bituminous Surface Leveling Per Design, JSPs were updated. The quality control JSP and RAS and RAP JSP were modified and the tack coat JSP was removed.
- 11:18, 6 September 2013 diff hist +33 m Main Page
- 10:21, 6 September 2013 diff hist +293 m Category:110 State and Federal Wage Rates and Other Requirements →Required Notices and Posters: updated poster links
- 09:54, 6 September 2013 diff hist +96 m 127.1 Request for Environmental Services added links
- 09:26, 6 September 2013 diff hist +1 m Main Page
- 09:12, 6 September 2013 diff hist 0 N File:Main Page Sep 6, 2013.jpg current
- 09:11, 6 September 2013 diff hist +483 m Main Page EPG 236.7
- 08:10, 6 September 2013 diff hist +417 m LPA:136.13 LPA Policy Changes Updated forms in EPG 136.8
- 08:05, 6 September 2013 diff hist +15 m LPA:136.12 Figures, Glossary and Other Useful Links Three forms in EPG 136.8 updated
- 08:03, 6 September 2013 diff hist 0 N File:136.8.27 2013.doc current
- 08:03, 6 September 2013 diff hist 0 N File:136.8.26 2013.doc current
- 08:03, 6 September 2013 diff hist 0 N File:136.8.25 2013.doc current
- 08:02, 6 September 2013 diff hist +30 m LPA:136.8 Local Public Agency Land Acquisition Per RW, several forms (136.8.25, -26 and -27) updated due to a request from FHWA