User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 10:39, 28 October 2013 diff hist +1 m Main Page
- 10:34, 28 October 2013 diff hist +63 m Main Page EPG 620.3 and EPG 101
- 09:58, 28 October 2013 diff hist 0 N File:Adobe Final Plans Stamp.docx
- 09:58, 28 October 2013 diff hist +67 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, new QRG, Adobe Final Plans Stamp
- 08:21, 28 October 2013 diff hist +319 m 620.3 Roundabout Markings (MUTCD Chapter 3C) →620.3.6 Word, Symbol and Arrow Pavement Markings for Roundabouts (MUTCD Section 3C.6): Per Traffic, clarification of the use of the fishhook arrow
- 12:01, 25 October 2013 diff hist -9 m 642.8 Sidewalk Design Criteria
- 11:29, 25 October 2013 diff hist +80 m 642.8 Sidewalk Design Criteria updated link
- 11:08, 25 October 2013 diff hist +156 m 642.8 Sidewalk Design Criteria updated several links, removed PROWAG links
- 10:41, 25 October 2013 diff hist +2 m 616.23 Traffic Control for Field Operations minor clarification
- 10:40, 25 October 2013 diff hist +1 m 616.8 Typical Applications (MUTCD 6H) minor clarification
- 08:13, 25 October 2013 diff hist -66 m Main Page EPG 903.9
- 07:22, 25 October 2013 diff hist -2,905 m 903.9 General Information Signs →903.9.2 General Information Signs (I Series) (MUTCD Section 2H.02): Per Traffic, guidance clarified by removing MUTCD verbiage that conflicted with other MoDOT policies
- 07:19, 25 October 2013 diff hist -54 m 903.9 General Information Signs →903.9.7 Airport Sign (D4-10): Per Traffic, first order signing for general aviation airports is now provided at no charge
- 15:26, 24 October 2013 diff hist 0 m Main Page
- 13:44, 24 October 2013 diff hist 0 m 640.2 Median Drainage →640.1.3 Design Discharge: Per Bridge, minor correction
- 12:19, 24 October 2013 diff hist +28 m Main Page
- 10:43, 24 October 2013 diff hist 0 N File:Main Page Oct 24, 2013.jpg current
- 10:43, 24 October 2013 diff hist -29 m Main Page new photo
- 14:51, 23 October 2013 diff hist -6 m 103.1 Bid Opening and Award Process updated links
- 11:16, 23 October 2013 diff hist 0 m Main Page
- 07:11, 23 October 2013 diff hist +88 m 616.18 Construction Inspection Guidelines for Sec 616 →Relocation of Service Signs (Logo Signs) on Construction Projects: Per CM, guidance was further clarified for the payment of the relocation of Logo signs
- 13:16, 22 October 2013 diff hist -51 m Category:1052 Mechanically Stabilized Earth Wall (MSE) and Sound Wall System Components →1052.2.3.10 Identification Marking: Per CM, identification marking guidance brought into compliance with Sec 1052
- 09:39, 22 October 2013 diff hist -260 m Main Page EPG 106.3.2.59.3
- 09:35, 22 October 2013 diff hist +33 m 106.3.2.59 TM-59, Determination of the International Roughness Index →106.3.2.59.3 Construction Acceptance Procedures: Per CM, the naming convention for the lane numbers was revised
- 08:37, 22 October 2013 diff hist 0 N File:Main Page Oct 22, 2013.jpg current
- 08:37, 22 October 2013 diff hist +666 m Main Page Unit Pricing table
- 07:50, 22 October 2013 diff hist 0 N File:823.7.jpg current
- 07:50, 22 October 2013 diff hist +75 m 823.7 All in a Day’s Work – Handling the Crew added photo
- 07:20, 22 October 2013 diff hist +152 m 903.11 Specific Service Signs - Logos →903.11.3 Logos and Logo Sign Panels (MUTCD Section 2J.03): Per Traffic, added link to Unit Pricing chart
- 07:17, 22 October 2013 diff hist +96 m 616.18 Construction Inspection Guidelines for Sec 616 →Relocation of Service Signs (Logo Signs) on Construction Projects: added link
- 14:32, 21 October 2013 diff hist -110 m 616.3 Temporary Traffic Control Elements (MUTCD Chapter 6C) →616.3.9 Detours and Diversions (MUTCD 6C.09): Per Traffic, minor clarification
- 12:51, 21 October 2013 diff hist 0 N File:Main Page Oct 21, 2013.jpg current
- 12:50, 21 October 2013 diff hist +207 m Main Page new photo
- 10:22, 21 October 2013 diff hist -1 m 620.13 Measurement of Retroreflectivity by Handheld Retroreflectometers Per CM, replaced the superseded ASTM reference with the current one
- 10:15, 21 October 2013 diff hist -14 m 751.50 Standard Detailing Notes →H3. Bearings: Per Bridge, minor corrections
- 09:53, 21 October 2013 diff hist +34 m 230.2 Vertical Alignment →230.2.4 Sight Distance: new photo
- 09:52, 21 October 2013 diff hist 0 N File:230.2.4.jpg current
- 14:20, 18 October 2013 diff hist +209 m Main Page EPG 130.1.3
- 14:01, 18 October 2013 diff hist +90 m Category:130 Value Engineering Per Design, in order to comply with MAP-21, NHS projects costing at least $50M and NHS bridge projects costing at least $40M require a VE
- 13:35, 18 October 2013 diff hist +550 m LPA:136.13 LPA Policy Changes EPG 136.7.2.10
- 13:28, 18 October 2013 diff hist -1 m LPA:136.7 Design →136.7.2.10 Value Engineering: Per Design, in order to comply with MAP-21, NHS projects costing at least $50M and NHS bridge projects costing at least $40M require a VE
- 13:19, 18 October 2013 diff hist -155 m Main Page EPG 806 and 134
- 11:23, 18 October 2013 diff hist -135 m Category:134 Engineering Professional Services →134.5.1 Invoicing: Per Design, the invoicing requirements were updated. Design no longer gets the letters; only Finc'l Services.
- 11:14, 18 October 2013 diff hist 0 N File:806 ESC Quick Reference.docx
- 11:14, 18 October 2013 diff hist 0 N File:806 ESC.docx
- 11:14, 18 October 2013 diff hist 0 N File:806 Online ESC.docx
- 11:13, 18 October 2013 diff hist +596 m Category:806 Pollution, Erosion and Sediment Control Per Environmental, new forms added
- 15:22, 17 October 2013 diff hist +4,181 m 750.7 Non-Hydraulic Considerations moved guidance for greater clarity
- 15:21, 17 October 2013 diff hist +18 m 750.2 Culverts updated link
- 13:55, 17 October 2013 diff hist 0 m LPA:136.8 Local Public Agency Land Acquisition →136.8.10.1 General