User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 14:55, 7 January 2014 diff hist -221 m Main Page EPG 106.3.2.59 and EPG 702
- 14:50, 7 January 2014 diff hist +44 m 751.36 Driven Piles →751.36.2 Steel Pile: inserted link
- 14:28, 7 January 2014 diff hist +8,786 m Category:702 Load-Bearing Piles Per Bridge, driving pile to rock criteria clarified. Eliminated 75% hammer efficiency requirem't for single acting diesel hammers; now require pile pt. reinforcem't on all piles driven to bear on rock
- 13:34, 7 January 2014 diff hist +592 m 106.3.2.59 TM-59, Determination of the International Roughness Index Per CM, additional guidance provided for IRI data entry.
- 13:11, 7 January 2014 diff hist -64 m 751.36 Driven Piles →751.36.2 Steel Pile: Per Bridge, driving pile to rock criteria clarified. Pile point reinforcement is now required on all piles driven to bear on rock.
- 11:27, 7 January 2014 diff hist +80 m Main Page EPG 903.5.30
- 09:54, 7 January 2014 diff hist 0 N File:R10-27a.jpg current
- 09:54, 7 January 2014 diff hist +58 m 903.5 Regulatory Signs →903.5.30 Traffic Signal Signs (R10-3, R10-5 through R10-30) (MUTCD Sections 2B.53 and 2B.54): Per Traffic, added R10-27a to align with current practice
- 08:49, 7 January 2014 diff hist 0 N File:123 Federal Involvement Project List 2014.pdf
- 08:49, 7 January 2014 diff hist +10 m Category:123 Federal-Aid Highway Program Per Bidding and Contract, updated Federal Involvement Project List (PODI).
- 15:40, 6 January 2014 diff hist 0 N File:Main Page Jan 6, 2014.jpg current
- 15:40, 6 January 2014 diff hist -1 m Main Page new photo
- 13:26, 3 January 2014 diff hist 0 N File:Main Page Jan 3, 2014.jpg current
- 13:26, 3 January 2014 diff hist +99 m Main Page EPG 751.36, EPG 751.50 and EPG 903.2
- 11:34, 3 January 2014 diff hist 0 N File:751.36.1 Waterjeting.docx
- 11:34, 3 January 2014 diff hist +677 m 751.36 Driven Piles →751.36.1 General: Per Bridge, new waterjetting guidance to reflect established practice
- 11:24, 3 January 2014 diff hist +346 m 751.50 Standard Detailing Notes Per Bridge, Note A1.2: added CIP steel pipe pile design stresses. Note G5 and G6: updated CIP pile notes and as-built foundation notes.
- 10:51, 3 January 2014 diff hist 0 N File:147.3 bridge.doc current
- 10:51, 3 January 2014 diff hist -10 m 147.3 Job Order Contracting (JOC) Per Estimate and Review, updated Bridge JSP
- 10:20, 3 January 2014 diff hist +4 m 903.2 Extent of Signing Per Traffic, removed flourescent yellow-green from the color choice of warning signs. Although MUTCD allows this color, MoDOT reserves yellow-green for school signs to make the school signs stand out.
- 15:21, 31 December 2013 diff hist +112 m Main Page EPG 751.1.3.3
- 14:45, 31 December 2013 diff hist 0 m 751.1 Preliminary Design →Common Bridge Rails (for Rehabilitations)
- 14:43, 31 December 2013 diff hist 0 N File:751.1.3.3 curb and parapet.jpg current
- 14:43, 31 December 2013 diff hist 0 N File:751.1.3.3 steel two tube x section.jpg current
- 14:43, 31 December 2013 diff hist 0 N File:751.1.3.3 steel two tube.jpg current
- 14:42, 31 December 2013 diff hist 0 N File:751.1.3.3 safety barrier x section.jpg current
- 14:42, 31 December 2013 diff hist 0 N File:751.1.3.3 safety barrier.jpg current
- 14:42, 31 December 2013 diff hist 0 N File:751.1.3.3 thrie x section.jpg current
- 14:42, 31 December 2013 diff hist 0 N File:751.1.3.3 thrie.jpg current
- 14:41, 31 December 2013 diff hist 0 N File:751.1.3.3 street rail x section.jpg current
- 14:41, 31 December 2013 diff hist 0 N File:751.1.3.3 street rail.jpg current
- 14:41, 31 December 2013 diff hist 0 N File:751.1.3.3 more than 6 in. x section.jpg current
- 14:40, 31 December 2013 diff hist 0 N File:751.1.3.3 more than 6 in..jpg current
- 14:40, 31 December 2013 diff hist 0 N File:751.1.3.3 less than 6 in. x section.jpg current
- 14:40, 31 December 2013 diff hist 0 N File:751.1.3.3 less than 6 in..jpg current
- 14:39, 31 December 2013 diff hist +5,286 m 751.1 Preliminary Design →751.1.3.3 Curb Type and Height: Per Bridge, this subarticle re-titled and re-written to reflect current practice
- 12:46, 31 December 2013 diff hist 0 N File:238.1 Survey Code Sheet.pdf
- 12:46, 31 December 2013 diff hist -60 m 238.1 Aerial Mapping and LiDAR Surveys Per Photogrammetry, updated Survey Code Sheet
- 15:14, 26 December 2013 diff hist 0 N File:Main Page Dec 26, 2013.jpg current
- 15:13, 26 December 2013 diff hist -332 m Main Page EPG 147.3
- 13:25, 26 December 2013 diff hist -27 m Category:101 Standard Forms →Survey: Per RW, updated form
- 13:21, 26 December 2013 diff hist 0 N File:238.2.17 Professional Land Surveyor 2013.doc current
- 13:21, 26 December 2013 diff hist 0 m 238.2 Land Surveying Per RW, updated form
- 13:07, 26 December 2013 diff hist 0 N File:147 fence Dec 26, 2013.doc current
- 13:07, 26 December 2013 diff hist 0 N File:147 guardrail guard cable.doc current
- 13:07, 26 December 2013 diff hist 0 N File:147 guard cable Dec 26, 2013.doc current
- 13:07, 26 December 2013 diff hist 0 N File:147 guardrail Dec 26, 2013.doc current
- 13:06, 26 December 2013 diff hist +126 m 147.3 Job Order Contracting (JOC) Per Estimate and Review, several JOC templates updated with minor clarifications. A new JOC for combining use of guardrail and guard cable was added.
- 14:16, 20 December 2013 diff hist +2 m 751.14 Steel Superstructure →751.14.3.4 Wide Flange Splice Tables: Per Bridge, corrected the Wide Flange Splice Table
- 14:02, 20 December 2013 diff hist +68 m 751.6 General Quantities Per Bridge, new pay item