User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 11:24, 25 April 2014 diff hist +72 m 147.3 Job Order Contracting (JOC) →147.3.5 Term Extension of Job Order Contracts: Per Estimate and Review, clarification of the process of revising the job order contract bonds
- 12:44, 24 April 2014 diff hist 0 N File:Main Page Apr 24, 2014.jpg current
- 12:43, 24 April 2014 diff hist 0 N File:Main Page 2 Apr 24, 2014.jpg current
- 12:43, 24 April 2014 diff hist +196 m Main Page new photos
- 07:24, 24 April 2014 diff hist +1 m LPA:136.9 Plans, Specs and Estimates (PSE) →136.9.1 Introduction
- 07:03, 24 April 2014 diff hist -7 m 771.2 Bridge Cleaning and Flushing Per Maint., clarified the Bridge Cleaning and Flushing code as only R327, not both R327 or R913.
- 15:19, 23 April 2014 diff hist 0 N File:505.1.2.4.jpg current
- 15:19, 23 April 2014 diff hist +36 m Category:505 Bridge Deck Concrete Wearing Surface →505.1.2.4 Finishing Equipment (for Sec 505.20.7)
- 15:07, 23 April 2014 diff hist 0 N File:703.1.12.jpg current
- 15:07, 23 April 2014 diff hist +35 m Category:703 Concrete Masonry Construction →703.1.12 Anchor Bolt Wells: new photo
- 14:43, 23 April 2014 diff hist 0 m Main Page
- 12:34, 22 April 2014 diff hist +43 m Main Page
- 12:32, 22 April 2014 diff hist -643 m Main Page
- 12:31, 22 April 2014 diff hist 0 N File:Main Page Apr 22, 2014.jpg current
- 12:31, 22 April 2014 diff hist +1,069 m Main Page EPG 751, EPG 703
- 12:20, 22 April 2014 diff hist +22 m 751.31 Open Concrete Intermediate Bents →751.31.2.3 General Design Assumptions: added link
- 12:17, 22 April 2014 diff hist +50 m 751.10 General Superstructure →751.10.1.5 Interior Section Design: added link
- 12:12, 22 April 2014 diff hist +53 m 751.8 Concrete Box Culverts →751.8.2.6.1 Strength Limit Design: added link
- 11:11, 22 April 2014 diff hist +792 m Category:703 Concrete Masonry Construction →703.3 Bridge Barrier Wall: Per CM, the intent on when barrier wall placement is allowed was clarified
- 11:05, 22 April 2014 diff hist +3,574 m 751.37 Drilled Shafts Per Bridge, numerous clarifications of drilled shafts lateral movements requirements and drilled shafts diameter for axial and settlement computations.
- 10:34, 22 April 2014 diff hist -1 m 751.8 Concrete Box Culverts →751.8.1.1 Material Properties
- 10:32, 22 April 2014 diff hist -102 m 751.35 Concrete Pile Cap Integral End Bents →751.35.1.1 Material Properties: Per Bridge, revised modulus of rupture information to meet latest AASHTO LRFD bridge design specifications.
- 10:30, 22 April 2014 diff hist -102 m 751.34 Concrete Pile Cap Non-Integral End Bents →751.34.1.1 Material Properties: Per Bridge, revised modulus of rupture information to meet latest AASHTO LRFD bridge design specifications.
- 10:28, 22 April 2014 diff hist -103 m 751.33 Concrete Semi Deep Abutments →751.33.1.1 Material Properties: Per Bridge, revised modulus of rupture information to meet latest AASHTO LRFD bridge design specifications.
- 10:26, 22 April 2014 diff hist -106 m 751.32 Concrete Pile Cap Intermediate Bents →751.32.1.1 Material Properties: Per Bridge, revised modulus of rupture information to meet latest AASHTO LRFD bridge design specifications.
- 10:21, 22 April 2014 diff hist +105 m 751.31 Open Concrete Intermediate Bents Per Bridge, revised modulus of rupture information and minimum tensile steel reinforcement information to meet latest AASHTO LRFD bridge design specifications.
- 09:55, 22 April 2014 diff hist +34 m 751.22 Prestressed Concrete I Girders →751.22.2.3 Flexure: Per Bridge, revised modulus of rupture information and minimum tensile steel reinforcement information to meet latest AASHTO LRFD bridge design specifications.
- 09:49, 22 April 2014 diff hist -47 m 751.17 Concrete Slab Bridges Per Bridge, revised modulus of rupture information to meet latest AASHTO LRFD bridge design specifications.
- 09:32, 22 April 2014 diff hist -249 m 751.10 General Superstructure Per Bridge, revised modulus of rupture information and minimum tensile steel reinforcement information to meet latest AASHTO LRFD bridge design specifications.
- 09:02, 22 April 2014 diff hist -5 m 751.8 Concrete Box Culverts Per Bridge, revised modulus of rupture information and minimum tensile steel reinforcement information to meet latest AASHTO LRFD bridge design specifications.
- 13:14, 21 April 2014 diff hist 0 N File:Main Page Apr 21, 2014.jpg current
- 13:13, 21 April 2014 diff hist +35 m Main Page new photo
- 10:27, 21 April 2014 diff hist 0 N File:236.7 Roster of Approved Contract Negotiators 2014.pdf
- 10:27, 21 April 2014 diff hist +1 m LPA:136.8 Local Public Agency Land Acquisition
- 10:26, 21 April 2014 diff hist -37 m LPA:136.12 Figures, Glossary and Other Useful Links Updated Roster of Approved Contract Negotiators so that non-MoDOT readers have access to it.
- 10:24, 21 April 2014 diff hist -38 m LPA:136.8 Local Public Agency Land Acquisition Updated Roster of Approved Contract Negotiators so that non-MoDOT readers have access to it.
- 10:21, 21 April 2014 diff hist -75 m 236.7 Negotiation Updated Roster of Approved Contract Negotiators so that non-MoDOT readers have access to it.
- 10:04, 21 April 2014 diff hist +377 m LPA:136.13 LPA Policy Changes EPG 136.4.3.3
- 10:01, 21 April 2014 diff hist -2 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.3.3 Consultant Performance Appraisals: Per LPA, implemented a requirement for the LPA to evaluate the consultant upon completion of work if they were hired by a standard solicitation.
- 09:55, 21 April 2014 diff hist +530 m LPA:136.13 LPA Policy Changes EPG 136.3.7.3, EPG 136.4.3.1
- 09:50, 21 April 2014 diff hist -46 m LPA:136.3 Federal Aid Basics →136.3.7.3 Progress Invoices: Per LPA, removed the $10K requirement for invoicing, having replaced it with the requirement to invoice at least 1 time/mo but not more often than every 2 weeks
- 09:49, 21 April 2014 diff hist -46 m LPA:136.11 Local Public Agency Construction →136.11.13.3 Invoices: Per LPA, removed the $10K requirement for invoicing, having replaced it with the requirement to invoice at least 1 time/mo but not more often than every 2 weeks
- 09:48, 21 April 2014 diff hist -46 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.3.1 Payments/Invoicing: Per LPA, removed the $10K requirement for invoicing, having replaced it with the requirement to invoice at least 1 time/mo but not more often than every 2 weeks
- 08:48, 18 April 2014 diff hist +83 m Main Page EPG 751.1
- 08:03, 18 April 2014 diff hist +23 m 748.7 Bridge Reports and Layouts →748.7.5.3 Surveys for Miscellaneous Structures: Per Bridge, minor clarification
- 07:57, 18 April 2014 diff hist +626 m 751.1 Preliminary Design Per Bridge, guidance for Bridge Memos and Design Layouts was clarified
- 10:42, 17 April 2014 diff hist +298 m Category:702 Load-Bearing Piles Per Bridge, updated Pile Driving Set Calculator link
- 09:02, 17 April 2014 diff hist +76 m Category:110 State and Federal Wage Rates and Other Requirements →110.1 Wage Rates (Guidance for Sec 110.1): Per CM, minor clarification
- 07:08, 17 April 2014 diff hist -75 m 751.11 Bearings →751.11.3.3 PTFE Bearings: removed archaic note
- 10:07, 16 April 2014 diff hist 0 N File:Main Page Apr 16a, 2014.jpg current