- 08:09, 27 June 2014 diff hist 0 N File:Main Page June 27, 2014.jpg current
- 08:08, 27 June 2014 diff hist -678 m Main Page new photos
- 07:31, 27 June 2014 diff hist -6 m 751.50 Standard Detailing Notes →A2. Concrete Box Culverts and Other Type Structures: Per Bridge, minor clarification to A2.16
- 07:29, 27 June 2014 diff hist +410 m 751.1 Preliminary Design Per Bridge, several minor clarifications
- 07:20, 27 June 2014 diff hist +177 m 750.7 Non-Hydraulic Considerations →750.7.11.1 Minimum Fill Heights: Per Bridge, added link as part of clarification
- 09:24, 26 June 2014 diff hist +7 m 127.29 Stormwater →127.29.5 Post Construction Runoff
- 09:06, 26 June 2014 diff hist -51 m Main Page EPG 129.27
- 08:44, 26 June 2014 diff hist +6,312 m 127.29 Stormwater Per Environmental, clarified existing guidance
- 07:26, 26 June 2014 diff hist 0 m 127.29 Stormwater 127.29 Stormwater moved to 127.29 Storm Water: Environemental's preference is "storm water" instead of "stormwater"
- 15:21, 25 June 2014 diff hist -180 m Main Page EPG 110.3
- 15:18, 25 June 2014 diff hist +218 m Category:110 State and Federal Wage Rates and Other Requirements →Owner-Operator: Per CM, a clarification on what is requiree before an RE can approve this owner-operator arrangement.
- 14:40, 25 June 2014 diff hist 0 m Main Page
- 11:33, 25 June 2014 diff hist -10 m Environmental Studies Per Environmental, updated Storm Water Management Plan
- 11:29, 25 June 2014 diff hist 0 N File:127.29 SWMP 2014.pdf
- 11:29, 25 June 2014 diff hist -26 m 127.29 Stormwater Per Environmental, updated Storm Water Management Plan
- 15:05, 24 June 2014 diff hist 0 m 751.1 Preliminary Design →Common Bridge Rails (for Rehabilitations)
- 15:05, 24 June 2014 diff hist 0 N File:751.1.3.4 thrie.jpg current
- 15:04, 24 June 2014 diff hist 0 m 751.1 Preliminary Design →Common Bridge Rails (for Rehabilitations): Per Bridge, updated photo
- 13:54, 24 June 2014 diff hist 0 m 236.5 Property Management Per CCO, updated RW4 contract link
- 10:35, 24 June 2014 diff hist +14 m Category:122 Aviation updated Aeronautical Chart link
- 10:22, 24 June 2014 diff hist 0 N File:Main Page June 24, 2014.jpg current
- 10:22, 24 June 2014 diff hist +441 m Main Page new photo
- 10:52, 23 June 2014 diff hist +68 m Main Page EPG 703.2.8
- 10:51, 23 June 2014 diff hist +226 m Category:703 Concrete Masonry Construction →703.2.8 Concrete Placement: Per Bridge and CM, guidance about pouring backwalls and associated construction joints conforming with the roadway crown was clarified
- 10:22, 23 June 2014 diff hist 0 N File:Main Page June 23, 2014.jpg current
- 10:21, 23 June 2014 diff hist -148 m Main Page EPG 703.2.9
- 09:58, 23 June 2014 diff hist +64 m Category:703 Concrete Masonry Construction →703.2.9 Curing: inserted link
- 09:49, 23 June 2014 diff hist +98 m Category:703 Concrete Masonry Construction →703.2.9 Curing
- 09:47, 23 June 2014 diff hist +7 m Category:703 Concrete Masonry Construction →703.2.9 Curing
- 09:46, 23 June 2014 diff hist +541 m Category:703 Concrete Masonry Construction →703.2.9 Curing: Per CM and Bridge, additional guidance about laying sprinkler hoses and sprayers before the concrete has proper set was provided
- 09:44, 23 June 2014 diff hist 0 N File:703.2.9.jpg current
- 09:17, 23 June 2014 diff hist +96 m LPA:136.13 LPA Policy Changes Fig. 136.8.8
- 09:16, 23 June 2014 diff hist 0 m LPA:136.12 Figures, Glossary and Other Useful Links Updated Fig. 136.8.8
- 09:16, 23 June 2014 diff hist 0 N File:136.8.8 2014.doc current
- 09:15, 23 June 2014 diff hist 0 m LPA:136.8 Local Public Agency Land Acquisition Per RW, updated Fig. 136.8.8 RW Clearance Certification Statement Sample Letter
- 08:55, 23 June 2014 diff hist +51 m 750.1 Open Channels →750.1.4.1.1 Manning's n: minor clarification
- 08:47, 23 June 2014 diff hist +281 m 751.1 Preliminary Design →751.1.2.6 Box Culverts: Per Bridge, minor clarifications
- 08:43, 23 June 2014 diff hist 0 N File:750.7.13 Slopes for Skewed Culvert Sections.pdf current
- 08:43, 23 June 2014 diff hist +3 m 750.7 Non-Hydraulic Considerations →750.7.13 Culvert Lengths: Per Bridge, provided improved figure
- 08:41, 23 June 2014 diff hist +151 m 750.6 Erosion Control and Energy Dissipation →750.6.2.1 Shear Stress: Per Bridge, minor clarifications
- 08:28, 23 June 2014 diff hist +39 m 750.3 Bridges →750.3.2.4 Hydraulic Analysis of Bridges: added link
- 08:26, 23 June 2014 diff hist 0 N File:750.1.4.1.1 Manning.pdf current
- 08:25, 23 June 2014 diff hist -32 m 750.1 Open Channels →750.1.4.1.1 Manning's n: minor clarifications, per Bridge
- 08:00, 23 June 2014 diff hist +17 m 750.1 Open Channels →750.1.4.1.1 Manning's n
- 07:56, 23 June 2014 diff hist 0 N File:750.1.4.1.1 mean boundary shear.jpg current
- 07:26, 23 June 2014 diff hist +4 m 748.3 Freeboard →748.3.4 Levees: Per Bridge, minor clarification current
- 12:11, 20 June 2014 diff hist +1,728 m 236.15 Requests from Cities for Annexations updated CCO contract link
- 12:09, 20 June 2014 diff hist +1,450 m 236.14 Change in Route Status Report updated CCO contract links
- 12:07, 20 June 2014 diff hist +1,181 m 236.11 Mediation udpated CCO contract links
- 12:04, 20 June 2014 diff hist +1,448 m 236.8 Relocation Assistance Program CCO contract link updated