User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 09:06, 4 November 2014 diff hist +34 127.27 Guidelines for Obtaining Environmental Clearance for Off-Site Activities
- 14:56, 3 November 2014 diff hist +2 m Main Page
- 11:50, 3 November 2014 diff hist 0 N File:237.9 MHTC Agenda Item Checklist Sept 2014.docx
- 11:49, 3 November 2014 diff hist +15 m 237.9 Submission of Plans and Supporting Documents Updated Conflict of Interest Form
- 09:34, 3 November 2014 diff hist -1 m Category:712 Structural Steel Construction →712.1.5 High Strength Bolts (Sec 712.7)
- 09:33, 3 November 2014 diff hist 0 N File:712.1.5 table.jpg current
- 09:33, 3 November 2014 diff hist 0 File:712.1.4.1.2.jpg uploaded a new version of "Image:712.1.4.1.2.jpg" current
- 09:32, 3 November 2014 diff hist 0 N File:712.1.4.1.2.jpg
- 09:32, 3 November 2014 diff hist 0 N File:712.1.4.1.1.jpg current
- 11:02, 31 October 2014 diff hist +488 m Main Page EPG 712, EPG 903
- 10:25, 31 October 2014 diff hist -14,172 m Category:712 Structural Steel Construction Per Bridge and confirmed by CM, E 712 updated to reflect current field welder qualification practice.
- 07:52, 31 October 2014 diff hist -2,189 m 903.23 Laboratory Testing Guidelines for Sec 903 →903.24.1.4 Aluminum Welding: Per BR and CM, E 903.24.1.4.1 and E 903.24.1.4.2 were deleted to removed archaic welder qualification info.
- 07:46, 31 October 2014 diff hist -105 m Category:101 Standard Forms →Construction and Contractor Related: Per BR and CM, the Welder Qualification Form was removed as it is no longer required.
- 07:33, 31 October 2014 diff hist +32 m Category:100 GENERAL →100.1.1 MoDOT Organization
- 07:23, 31 October 2014 diff hist 0 m Category:1005 Aggregate for Concrete →1005.4.2.8 Mortar Strength: Per Physical Lab, updated reference to AASHTO test to conform with Sec 1005
- 07:15, 31 October 2014 diff hist -38 m Category:100 GENERAL →100.1.1 MoDOT Organization: Per AI, corrections to reflect the current divisional reporting duties
- 07:09, 31 October 2014 diff hist -1 m 751.50 Standard Detailing Notes →A5. Miscellaneous: Per Bridge, "shall" was changed to "will" in Note A5.6
- 07:46, 30 October 2014 diff hist 0 N File:Main Page Oct 30, 2014.jpg current
- 07:46, 30 October 2014 diff hist -114 m Main Page new photo
- 15:12, 29 October 2014 diff hist 0 m Main Page
- 14:41, 29 October 2014 diff hist -9 m 751.6 General Quantities →751.6.1 Index of Quantities: Per Bridge, minor corrections
- 15:26, 28 October 2014 diff hist +228 m Category:134 Engineering Professional Services →134.1.3 Consultant Qualification: Per Bridge, restored Figs. 134.5.1.3 and 134.5.1.4, as these are still in use
- 14:27, 27 October 2014 diff hist 0 m Main Page
- 10:07, 27 October 2014 diff hist +37 m 606.1 Guardrail →606.1.4 Maintenance Planning Guidelines for Guardrail: added photo
- 09:55, 27 October 2014 diff hist 0 N File:616.1.4.jpg current
- 13:42, 24 October 2014 diff hist 0 m Main Page
- 13:39, 24 October 2014 diff hist 0 N File:Main Page Oct 24, 2014.jpg current
- 13:38, 24 October 2014 diff hist +286 m Main Page new photo
- 09:50, 24 October 2014 diff hist 0 N File:824 volunteers.jpg current
- 09:50, 24 October 2014 diff hist +42 m Category:824 Adopt-A-Highway and Sponsor-A-Highway Programs added photo current
- 13:54, 23 October 2014 diff hist 0 N File:751.13.4.7 Option 1 end bent.jpg current
- 13:53, 23 October 2014 diff hist 0 N File:751.13.4.5 Section thru joint 2014.jpg current
- 13:52, 23 October 2014 diff hist -40 m 751.13 Expansion Joint Systems Per Bridge, minor clarifications in text and figures
- 12:48, 23 October 2014 diff hist 0 N File:Main Page Oct 23, 2014.jpg current
- 12:48, 23 October 2014 diff hist -152 m Main Page new photo
- 09:55, 22 October 2014 diff hist -176 m Main Page EPG 620.13 and EPG 606
- 09:19, 22 October 2014 diff hist -26 m 238.1 Aerial Mapping and LiDAR Surveys updated link
- 09:16, 22 October 2014 diff hist -16 m Category:134 Engineering Professional Services →134.2.4 Consultant Solicitation and Selection Process – Standard Solicitation Method for On-Call/Hourly Rate Contracts Cost Plus Fixed Fee Contracts: Per LPA, minor corrections
- 08:38, 22 October 2014 diff hist +1,598 m Category:606 Guardrail and Guard Cable Added charts of available roadside hardward from FHWA website
- 07:25, 22 October 2014 diff hist +177 m 620.13 Measurement of Retroreflectivity by Handheld Retroreflectometers →620.13.5 Acceptance: Per Traffic, Pavement Marking Acceptance Table clarified
- 07:16, 22 October 2014 diff hist +13 m 750.6 Erosion Control and Energy Dissipation →750.6.3 Types of Ditch Protection: Per Bridge, minor corrections
- 13:50, 20 October 2014 diff hist +1 m Main Page
- 15:17, 17 October 2014 diff hist +6 m Main Page
- 15:12, 17 October 2014 diff hist 0 N File:Main Page Oct 17, 2014.jpg current
- 15:11, 17 October 2014 diff hist +252 m Main Page new photo
- 14:46, 17 October 2014 diff hist 0 m Main Page
- 07:57, 17 October 2014 diff hist -218 m Category:134 Engineering Professional Services Per LPA, removed Figs. 134.5.1.3 and 134.5.1.4 (hourly rate contracts)
- 07:28, 17 October 2014 diff hist -256 m Category:134 Engineering Professional Services →134.5.1 Invoicing: Per LPA, removed references to the figures which pertain to “Hourly Rate” contracts and are no longer applicable
- 07:17, 17 October 2014 diff hist +171 m Main Page EPG 903.6.11
- 07:15, 17 October 2014 diff hist -655 903.6 Warning Signs →903.6.11 Chevron Alignment Sign (W1-8) (MUTCD Section 2C.09): Per Traffic, chevrons to be installed on curves with AADTs > 1000 & have advisory speed 15 mph or more below road's posted speed