User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 10:28, 5 December 2014 diff hist 0 N File:748.6.1.jpg current
- 10:28, 5 December 2014 diff hist +169 m 748.6 High Water Surface Elevation Per Bridge, updated links & verbiage (Design High Water changed to Design Flood Elevation or Normal High Water and High Water changed to Base Flood Elevation). Figure updated w/ new verbiage
- 09:54, 5 December 2014 diff hist +67 m 230.2 Vertical Alignment →230.2.11 Grades: Per Bridge, updated link
- 09:49, 5 December 2014 diff hist -479 m Category:101 Standard Forms →Bridge: Per Bridge, removed 5 archaic forms
- 09:42, 5 December 2014 diff hist 0 N File:747 Bridge Survey Report.docx
- 09:42, 5 December 2014 diff hist +666 m 238.3 Route Surveying Per Bridge, EPG 238.3.36 and 238.3.37 reformatted to coodinate with Bridge Report and Layout revisions.
- 08:27, 5 December 2014 diff hist -4 m 238.4 Construction Surveying updated links
- 08:22, 5 December 2014 diff hist +1 m 750.3 Bridges updated link
- 16:11, 4 December 2014 diff hist 0 N File:751.32.3.2.1.1 2014.jpg current
- 16:11, 4 December 2014 diff hist -130 m 751.32 Concrete Pile Cap Intermediate Bents →751.32.3.2.1 Sway Bracing: Per Bridge, updated sway bracing figure
- 15:25, 4 December 2014 diff hist +180 m MediaWiki:Sidebar Added links to contractual standards via a new box, "Other MoDOT Standards"
- 12:25, 4 December 2014 diff hist +276 MediaWiki:Sidebar
- 16:01, 3 December 2014 diff hist -2 238.3 Route Surveying →238.3.1.29 Utilities
- 13:51, 3 December 2014 diff hist +63 m Main Page
- 12:20, 3 December 2014 diff hist 0 N File:Main Page Dec 3, 2014.jpg current
- 12:19, 3 December 2014 diff hist -11 m Main Page EPG 147.3, EPG 170
- 11:14, 3 December 2014 diff hist -4,116 m 770.10 Linseed Oil Treatment Per Maintenance, article info deleted since treatment is no longer in use
- 08:38, 3 December 2014 diff hist 0 N File:236.11 Agreement to Mediate 2014.doc current
- 08:38, 3 December 2014 diff hist +10 m 236.11 Mediation Per RW, updated Agreement to Mediate form
- 08:28, 3 December 2014 diff hist 0 N File:147 asphalt pavement repair Dec 2014.doc current
- 08:28, 3 December 2014 diff hist 0 N File:147 bridge Dec 2014.doc current
- 08:28, 3 December 2014 diff hist 0 N File:147 concrete pavement repair Dec 2014.doc current
- 08:27, 3 December 2014 diff hist 0 N File:147 fence Dec 2014.doc current
- 08:27, 3 December 2014 diff hist 0 N File:147 guardrail guard cable 2014.docx
- 08:27, 3 December 2014 diff hist 0 N File:147 guard cable 2014.doc current
- 08:27, 3 December 2014 diff hist 0 N File:147 guardrail 2014.doc current
- 08:27, 3 December 2014 diff hist -13 m 147.3 Job Order Contracting (JOC) Per Estimate and Review, updated all Job Order Contracting JSPs
- 15:56, 2 December 2014 diff hist -116 m 770.1 District Routine Maintenance and Special Crew Responsibilities Per Maintenance, linseed oil info deleted since treatment is no longer in use
- 15:55, 2 December 2014 diff hist -1,347 m 413.6 Scrub Seal Treatment Per Maintenance, article info deleted since treatment is no longer in use
- 15:54, 2 December 2014 diff hist -4,402 m 771.16 Penetrating Concrete Sealer - Silane Per Maintenance, article info deleted since treatment is no longer in use
- 15:37, 2 December 2014 diff hist 0 m Category:170 Maintenance Activity Planning Guidelines →Work Scheduling Guidelines
- 15:36, 2 December 2014 diff hist 0 N File:Work schedule2 Dec 20143.jpg current
- 15:36, 2 December 2014 diff hist +2 m Category:170 Maintenance Activity Planning Guidelines
- 15:30, 2 December 2014 diff hist 0 N File:170 Work Scheduling Guide 2014 Dec.xls current
- 15:29, 2 December 2014 diff hist -2 m Category:170 Maintenance Activity Planning Guidelines →Work Scheduling Guidelines
- 15:27, 2 December 2014 diff hist 0 N File:Work schedule2 Dec 20142.jpg current
- 15:27, 2 December 2014 diff hist +1 Category:170 Maintenance Activity Planning Guidelines →Work Scheduling Guidelines
- 15:16, 2 December 2014 diff hist 0 N File:Work schedule2 Dec 2014.jpg current
- 15:16, 2 December 2014 diff hist 0 N File:Work schedule1 Dec 2014.jpg current
- 15:15, 2 December 2014 diff hist +64 m Category:170 Maintenance Activity Planning Guidelines Per Maintenance, updated Work Scheduling Guide and Index of Printable Planning Guides. References to Scrub Seal Treatment and Linseed Oil Treatment removed. New R328 and R329 codes
- 09:14, 2 December 2014 diff hist +65 m 751.1 Preliminary Design →751.1.2.18.3 Supporting Documents: added link
- 09:13, 2 December 2014 diff hist +49 m Category:101 Standard Forms →Bridge: added link
- 09:10, 2 December 2014 diff hist -2 m 751.1 Preliminary Design →751.1.2.18.3 Supporting Documents
- 09:04, 2 December 2014 diff hist +81 m 750.3 Bridges Per Bridge, replaced "design high water" with "the water surface"and rewrote and retitled EPG 750.3.2.4.1 Design High Water Surface Elev as "Normal Water Surface Elevation
- 08:40, 2 December 2014 diff hist -5 m 750.2 Culverts →750.2.11 Data Required on Plans: Per Bridge, replaced "design high water elevation" with "design flood elevation"
- 08:27, 2 December 2014 diff hist +69 m 751.9 Bridge Seismic Design →751.9.2.6.3 Pile Axial Stiffness: Per Bridge, replaced "design high water elevation" with "Normal Water Surface Elevation"
- 08:21, 2 December 2014 diff hist -94 m 750.7 Non-Hydraulic Considerations →750.7.4.3 Summary of Responsibilities: Per Bridge, clarification of terms such as Base Flood Elevation and Design FLood Elevation
- 16:25, 1 December 2014 diff hist -4 m 751.1 Preliminary Design →751.1.2.5.1 Grade Separations
- 16:20, 1 December 2014 diff hist -426 m Main Page EPG 751
- 16:04, 1 December 2014 diff hist 0 N File:751.1.2.18.2 Retaining Wall.pdf