User contributions for Smithk
Jump to navigation
Jump to search
30 December 2014
- 12:1912:19, 30 December 2014 diff hist 0 m 903.2 Regulatory Signs and Barricades (MUTCD Chapter 2B) →Table 903.5.3 Regulatory Sign and Plaque Sizes: Per Traffic, corrected dimension for oversized STOP sign
26 December 2014
- 09:4009:40, 26 December 2014 diff hist −3 m Main Page EPG 110.3
- 09:0609:06, 26 December 2014 diff hist +1,257 m Category:110 State and Federal Wage Rates and Other Requirements →110.3 Prevailing Wages and Records (Guidance for Sec 110.3): Per CM, routine revisions to increase the number of payrolls that are checked for compliance.
24 December 2014
- 12:0812:08, 24 December 2014 diff hist −1 m Main Page No edit summary
- 12:0812:08, 24 December 2014 diff hist −2 m Category:150 Quality Management →150.1.1 Folder Structure
- 12:0712:07, 24 December 2014 diff hist +1 m Main Page No edit summary
- 12:0512:05, 24 December 2014 diff hist −74 m Main Page EPG 150.1
- 12:0212:02, 24 December 2014 diff hist +320 m Category:150 Quality Management →150.1 Project Documentation: Per Env'l, updated guidance for project documentation to accommodate SharePoint
- 11:0911:09, 24 December 2014 diff hist 0 N File:Main Page Dec 24, 2014.jpg No edit summary current
- 11:0811:08, 24 December 2014 diff hist −118 m Main Page EPG 109.12
- 11:0611:06, 24 December 2014 diff hist +90 m Category:109 Measurement and Payment added links
- 09:2809:28, 24 December 2014 diff hist 0 N File:236.3 Form A419 Dec 2014.docx No edit summary
- 09:2809:28, 24 December 2014 diff hist 0 m 236.3 Administration Per RW, updated Form A419
- 09:1609:16, 24 December 2014 diff hist +31 m LPA:136.6 Environmental and Cultural Requirements Per Environmental, minor clarification and correction
- 08:2908:29, 24 December 2014 diff hist +1,273 m Category:109 Measurement and Payment →109.12 Change Orders (for Sec 109.12): Per CM, added recommended documentation for change orders and time adjustments
22 December 2014
- 15:2415:24, 22 December 2014 diff hist 0 N File:Main Page Dec 22, 2014.jpg No edit summary current
- 15:2415:24, 22 December 2014 diff hist +124 m Main Page EPG 751.6.2.7
- 14:3914:39, 22 December 2014 diff hist 0 m 751.50 Standard Detailing Notes →A1. Design Specifications, Loadings & Unit Stresses: Per Bridge, minor correction
- 09:1309:13, 22 December 2014 diff hist +652 m 751.6 General Quantities →751.6.2.7 Non-Destructive Testing (NDT) for Cover Plates: Per Bridge, NDT required for all top cover plates when a bridge is to be redecked. Guidance now provided for bottom flange cover plates
19 December 2014
- 15:3415:34, 19 December 2014 diff hist 0 m Main Page No edit summary
- 11:3511:35, 19 December 2014 diff hist +865 m 751.5 Structural Detailing Guidelines →751.5.4.5 Bridge Decks: Per Bridge, updated links
- 11:3011:30, 19 December 2014 diff hist 0 m 751.5 Structural Detailing Guidelines →751.5.3.2 Vertical Drain at End Bents: Per Bridge, updated links
- 10:2410:24, 19 December 2014 diff hist +388 m 751.5 Structural Detailing Guidelines Per Bridge, additional minor clarifications
18 December 2014
- 15:5915:59, 18 December 2014 diff hist 0 N File:Main Page 2 Dec 18, 2014.jpg No edit summary current
- 15:5915:59, 18 December 2014 diff hist 0 N File:Main Page Dec 18, 2014.jpg No edit summary current
- 15:5815:58, 18 December 2014 diff hist −499 m Main Page EPG 751.10, EPG 751.40, EPG 751.50
- 15:3715:37, 18 December 2014 diff hist +1,969 m 751.50 Standard Detailing Notes Per Bridge, incorporated Fiber Reinforced Polymer slab drain details and guidance to provide another material option.
- 14:3714:37, 18 December 2014 diff hist +8 m 751.10 General Superstructure →751.10.3.2.1 New Structure Without Wearing Surface Slab Drains - Details
- 14:3614:36, 18 December 2014 diff hist +1,211 m 751.10 General Superstructure →751.10.3.2.1 New Structure Without Wearing Surface Slab Drains - Details: added slab drain drawing links
- 14:1714:17, 18 December 2014 diff hist +2,336 m 751.40 LFD Widening and Repair →751.40.5.1 Slab Drain Details: Per Bridge, incorporated Fiber Reinforced Polymer slab drain details and guidance to provide another material option.
- 13:3513:35, 18 December 2014 diff hist 0 N File:751.10.3.2.1 optional.jpg No edit summary current
- 13:3413:34, 18 December 2014 diff hist 0 N File:751.10.3.2.1 angled.jpg No edit summary current
- 13:3413:34, 18 December 2014 diff hist 0 N File:751.10.3.2.1 straight.jpg No edit summary current
- 13:3313:33, 18 December 2014 diff hist −325 m 751.10 General Superstructure →751.10.3 Bridge Deck Drainage - Slab Drains: Per Bridge, incorporated Fiber Reinforced Polymer slab drain details and guidance to provide another material option.
- 10:0410:04, 18 December 2014 diff hist +372 m 751.1 Preliminary Design →751.1.1.1 Introduction: Per Bridge, incorporated Fiber Reinforced Polymer slab drain details and guidance to provide another material option.
- 09:2509:25, 18 December 2014 diff hist +1,310 m 751.5 Structural Detailing Guidelines Per Bridge, added an abbreviation; clarified guidance to 751.5.2.1.3 Structure Description
17 December 2014
- 14:4314:43, 17 December 2014 diff hist +1,043 m Category:134 Engineering Professional Services Added ''Helpful Links for Engineering Policy'' info from website
- 14:2614:26, 17 December 2014 diff hist +1 m Main Page No edit summary
- 08:1108:11, 17 December 2014 diff hist −12 m 750.7 Non-Hydraulic Considerations Per Bridge, clarified use of "barrel" (usually by replacing it with "box")
16 December 2014
- 09:2209:22, 16 December 2014 diff hist 0 N File:101 Design Layout Stream 2014.docx No edit summary
- 09:2209:22, 16 December 2014 diff hist 0 N File:101 Design Layout Box 2014.docx No edit summary
- 09:2109:21, 16 December 2014 diff hist 0 N File:101 Culvert Hydraulics Report.docx No edit summary current
- 09:2109:21, 16 December 2014 diff hist 0 N File:101 Bridge Hydraulics Report.docx No edit summary current
- 09:2109:21, 16 December 2014 diff hist +13 m Category:101 Standard Forms →Bridge: Per Bridge, updated four forms
15 December 2014
- 09:4309:43, 15 December 2014 diff hist −41 m Main Page EPG 104.7
- 08:3208:32, 15 December 2014 diff hist 0 N File:Fig 104.7 2014.doc No edit summary
- 08:3208:32, 15 December 2014 diff hist 0 m 104.7 Scoping Estimates Per Estimate and Review, Cost Est. Guide for Rural Prelim Design updated with new Maintenance Treatment per mile cost
- 08:1408:14, 15 December 2014 diff hist 0 N File:147 fence Dec 15 2014.doc No edit summary current
- 08:1408:14, 15 December 2014 diff hist 0 N File:147 guardrail guard cable Dec 2014.docx No edit summary
- 08:1408:14, 15 December 2014 diff hist 0 N File:147 guard cable Dec 2014.doc No edit summary current