User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 13:37, 26 February 2015 diff hist +177 m LPA:136.8 Local Public Agency Land Acquisition
- 13:36, 26 February 2015 diff hist +247 m LPA:136.8 Local Public Agency Land Acquisition Per RW, guidance has been expanded for the streamlined documentation process for the acquisitions of LPA projects
- 11:03, 26 February 2015 diff hist +36 m 236.8 Relocation Assistance Program Updated 2 MO Rev Statutes links
- 14:47, 25 February 2015 diff hist 0 N File:Main Page Feb 25, 2015.jpg current
- 14:47, 25 February 2015 diff hist +1,329 m Main Page EPG 620, EPG 628, EPG 910.5
- 13:52, 25 February 2015 diff hist 0 N File:910.5.2.jpg current
- 13:52, 25 February 2015 diff hist +12,156 N 910.5 ITS Improvements Procurement Per DE, this new article provides guidance on federalizing ITS purchases whether they are standalone or a part of a construction project.
- 13:49, 25 February 2015 diff hist 0 N File:HFST.jpg current
- 13:48, 25 February 2015 diff hist +74 m Category:600 INCIDENTAL CONSTRUCTION EPG 628, new article
- 13:47, 25 February 2015 diff hist 0 N File:628 HFST demonstration.docx current
- 13:47, 25 February 2015 diff hist +6,139 N Category:628 High Friction Surface Treatment HFST cost-effectively increases the safety of road segments where vehicles frequently depart the traveled way due to polishing of the existing pavem't aggregate or by slightly substandard geometry
- 13:40, 25 February 2015 diff hist +22 620.13 Measurement of Retroreflectivity by Handheld Retroreflectometers Per TS, eliminated Mem’l Day striping goal, use of double dropped wet reflective elements, & grooving on constr’n project if a durable pavem’t marking product is not being used.
- 13:38, 25 February 2015 diff hist -2,236 620.12 Construction Inspection for Sec 620 Per TS, eliminated Mem’l Day striping goal, use of double dropped wet reflective elements, & grooving on constr’n project if a durable pavem’t marking product is not being used.
- 13:37, 25 February 2015 diff hist -67 620.11 Guidelines for Using Water-Borne Traffic Paint Per TS, eliminated Mem’l Day striping goal, use of double dropped wet reflective elements, & grooving on constr’n project if a durable pavem’t marking product is not being used.
- 13:36, 25 February 2015 diff hist -1,749 620.10 Operational Procedures and Safety Per TS, eliminated Mem’l Day striping goal, use of double dropped wet reflective elements, & grooving on constr’n project if a durable pavem’t marking product is not being used.
- 13:35, 25 February 2015 diff hist -630 m 620.2 Pavement and Curb Markings (MUTCD Chapter 3B) Per TS, eliminated Mem’l Day striping goal, use of double dropped wet reflective elements, & grooving on constr’n project if a durable pavem’t marking product is not being used.
- 13:34, 25 February 2015 diff hist -1,632 m 620.1 General (MUTCD Chapter 3A) Per TS, eliminated Mem’l Day striping goal, use of double dropped wet reflective elements, & grooving on constr’n project if a durable pavem’t marking product is not being used.
- 13:32, 25 February 2015 diff hist -764 m Category:620 Pavement Marking Per TS, eliminated Mem’l Day striping goal, use of double dropped wet reflective elements, & grooving on constr’n project if a durable pavem’t marking product is not being used.
- 10:21, 25 February 2015 diff hist +208 m Main Page EPG 450, EPG 402
- 09:30, 25 February 2015 diff hist 0 m Category:402 Bituminous Surface Leveling →402.1.2 Mix and Quantities: Per CM, updated BP-2/SP95 mix thickness info to be in conformation with specs.
- 09:29, 25 February 2015 diff hist +1,487 m Category:450 Bituminous Pavement Design Per CM, updated BP-2/SP95 mix thickness info to be in conformation with specs. Also added guidance emphasizing the importance of following the minimum thickness criteria.
- 08:50, 25 February 2015 diff hist -214 m Category:123 Federal-Aid Highway Program →123.1.1 FHWA Oversight - National Highway System: updated PoDi link
- 14:57, 24 February 2015 diff hist -3 m Main Page
- 14:43, 24 February 2015 diff hist -96 m Main Page EPG 101
- 14:28, 24 February 2015 diff hist 0 m Category:150 Quality Management Per CM, updated QRG
- 14:26, 24 February 2015 diff hist 0 N File:Sample Record General Feb 2015.docx
- 14:26, 24 February 2015 diff hist 0 N File:Digital Signature for Adobe Pro 10 (Contractors) 2015.docx
- 14:25, 24 February 2015 diff hist -1 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, upated two QRGs
- 09:26, 24 February 2015 diff hist 0 m 642.9 Sidewalk Ramp and Curb Ramp Design Criteria →642.2.4 Side Streets and Driveway Crossings: Per EPG, corrected min. width of walkway is 4 ft.
- 09:04, 24 February 2015 diff hist -431 m 236.5 Property Management Per RW, deleted three archaic forms
- 08:54, 24 February 2015 diff hist +1,218 m 236.13 Designing Right of Way Plans Per RW, updated several links
- 16:27, 23 February 2015 diff hist 0 N File:Main Page Feb 23, 2015.jpg current
- 16:27, 23 February 2015 diff hist +107 m Main Page
- 16:15, 23 February 2015 diff hist +92 m Category:700 STRUCTURES AND HYDRAULICS added EPG 734
- 16:14, 23 February 2015 diff hist +113 Nm Category:734 Installation of Pipe by Horizontal Boring Methods New page: Refer to [http://www.modot.mo.gov/business/standards_and_specs/Sec0734.pdf Sec 734] for MoDOT’s specifications.
- 15:53, 23 February 2015 diff hist +103 m Category:203 Roadway and Drainage Excavation, Embankment and Compaction →Borrow (Sec 203.3): Per CM, archaic construction diary info replaced with SM info
- 14:03, 23 February 2015 diff hist +123 m LPA:136.13 LPA Policy Changes Form 136.8.20
- 14:02, 23 February 2015 diff hist 0 m LPA:136.12 Figures, Glossary and Other Useful Links A typo in Form 136.8.20 LPA Project Acquisition Monitoring Checklist was corrected
- 14:01, 23 February 2015 diff hist 0 N File:136.8.20 2015.docx
- 14:00, 23 February 2015 diff hist 0 m LPA:136.8 Local Public Agency Land Acquisition Per RW, a typo in Form 136.8.20 LPA Project Acquisition Monitoring Checklist was corrected
- 13:34, 23 February 2015 diff hist -481 m 236.5 Property Management Per RW, removal of RAI Form references
- 13:14, 23 February 2015 diff hist +152 m 236.8 Relocation Assistance Program
- 13:08, 23 February 2015 diff hist +315 m 236.8 Relocation Assistance Program
- 13:06, 23 February 2015 diff hist +224 m 236.8 Relocation Assistance Program
- 13:03, 23 February 2015 diff hist +119 m 236.8 Relocation Assistance Program updated link
- 12:33, 23 February 2015 diff hist +13,179 m 236.8 Relocation Assistance Program Per RW, many scores of links updated
- 12:08, 20 February 2015 diff hist +236 m Category:237 Contract Plans Per Bidding and Contracts, updated link
- 12:01, 20 February 2015 diff hist 0 m LPA:136.13 LPA Policy Changes
- 11:54, 20 February 2015 diff hist +79 m 237.9 Submission of Plans and Supporting Documents →237.9.1 Final Design Plans Submittal: Per DE, added Project Reviewing Checklist
- 11:54, 20 February 2015 diff hist +77 m Category:101 Standard Forms →Checklist: Per Design, added Project Reviewing Checklist