User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 14:44, 31 March 2015 diff hist 0 m Main Page
- 15:16, 30 March 2015 diff hist 0 m Main Page
- 15:13, 30 March 2015 diff hist 0 m Main Page
- 15:04, 30 March 2015 diff hist +5 m Category:101 Standard Forms →Construction and Materials: Per CM, updated log
- 14:52, 30 March 2015 diff hist 0 N File:110.3 Payroll Log 2015.xlsx current
- 14:52, 30 March 2015 diff hist +10 m Category:110 State and Federal Wage Rates and Other Requirements Per CM, upated Payroll Log Form
- 07:31, 30 March 2015 diff hist +9 m LPA:136.3 Federal Aid Basics →136.3.8.5.2 Project Eligibility and Selection: updated link
- 07:29, 30 March 2015 diff hist +11 m LPA:136.3 Federal Aid Basics →136.3.8.3.2 Project Eligibility and Selection: updated link
- 12:56, 27 March 2015 diff hist -27 m Main Page EPG 751.5.1.4
- 12:50, 27 March 2015 diff hist +563 m 751.5 Structural Detailing Guidelines →751.5.1.4 Contract Addendums and Construction Changes: Per Bridge, minor clarifications about dates and plans changes for addendums
- 09:43, 27 March 2015 diff hist -30 m Main Page EPG 110.3
- 09:25, 27 March 2015 diff hist +52 m Category:101 Standard Forms →Construction and Materials: Per CM, added Payroll Log Form
- 09:23, 27 March 2015 diff hist +33 m Category:110 State and Federal Wage Rates and Other Requirements →110.3 Prevailing Wages and Records (Guidance for Sec 110.3)
- 09:20, 27 March 2015 diff hist +33 m Category:110 State and Federal Wage Rates and Other Requirements inserted link
- 09:11, 27 March 2015 diff hist 0 N File:110.3 Payroll Log.xlsx current
- 09:11, 27 March 2015 diff hist -53 m Category:110 State and Federal Wage Rates and Other Requirements →110.3 Prevailing Wages and Records (Guidance for Sec 110.3): Per CM, revision eliminated the unnecessary numbering of payrolls received from contractors. We now identify payrolls by date range.
- 08:53, 27 March 2015 diff hist -2 m LPA:136.8 Local Public Agency Land Acquisition
- 08:47, 27 March 2015 diff hist +8,980 m LPA:136.8 Local Public Agency Land Acquisition Per RW, updated numerous links
- 08:55, 26 March 2015 diff hist 0 N File:Main Page Mar 26, 2015.jpg current
- 08:55, 26 March 2015 diff hist +637 m Main Page EPG 1002.1, etc.
- 08:07, 26 March 2015 diff hist -700 m Category:1009 Aggregate for Drainage →1009.1 Procedure: Per CM, the ITP gives sampling requirements and excel to oracle sheets for reporting material. Thus the Required Field Test tables were removed
- 08:07, 26 March 2015 diff hist -941 m Category:1007 Aggregate for Base →1007.1 Procedure: Per CM, the ITP gives sampling requirements and excel to oracle sheets for reporting material. Thus the Required Field Test tables were removed
- 08:06, 26 March 2015 diff hist -744 m Category:1006 Aggregate for Surfacing →1006.1 Procedure: Per CM, the ITP gives sampling requirements and excel to oracle sheets for reporting material. Thus the Required Field Test tables were removed
- 08:05, 26 March 2015 diff hist -1,352 m Category:1005 Aggregate for Concrete →1005.1 Procedure: Per CM, the ITP gives sampling requirements and excel to oracle sheets for reporting material. Thus the Required Field Test tables were removed
- 08:04, 26 March 2015 diff hist -742 m Category:1004 Graded Aggregate for Bituminous Surface →1004.1 Procedure: Per CM, the ITP gives sampling requirements and excel to oracle sheets for reporting material. Thus the Required Field Test tables were removed
- 08:04, 26 March 2015 diff hist -740 m Category:1003 Aggregate for Seal Coats →1003.1 Procedure: Per CM, the ITP gives sampling requirements and excel to oracle sheets for reporting material. Thus the Required Field Test tables were removed
- 08:03, 26 March 2015 diff hist -887 m Category:1002 Aggregate for Asphaltic Concrete →1002.1 Procedure: Per CM, the ITP gives sampling requirements and excel to oracle sheets for reporting material. Thus the Required Field Test tables were removed
- 11:18, 25 March 2015 diff hist +185 m LPA:136.13 LPA Policy Changes Fig 136.4.11
- 11:16, 25 March 2015 diff hist -4 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.4.11 updated
- 11:15, 25 March 2015 diff hist 0 N File:136.4.11 2015.doc current
- 11:15, 25 March 2015 diff hist -8 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, Fig.136.4.11 udpated with new link to MoDOT's Approved Consultant Prequalification List
- 11:08, 25 March 2015 diff hist 0 File:134.2.4 2015.doc uploaded a new version of "Image:134.2.4 2015.doc" current
- 11:08, 25 March 2015 diff hist 0 N File:134.2.4 2015.doc
- 11:08, 25 March 2015 diff hist 0 N File:134.2.2 2015.doc current
- 11:08, 25 March 2015 diff hist -18 m Category:134 Engineering Professional Services Per LPA, updated two forms
- 10:42, 25 March 2015 diff hist -34 m Category:134 Engineering Professional Services updated links
- 10:36, 25 March 2015 diff hist -34 m LPA:136.4 Consultant Selection and Consultant Contract Management updated links
- 07:59, 25 March 2015 diff hist +838 m 236.15 Requests from Cities for Annexations Per RW, updated several links
- 07:44, 25 March 2015 diff hist +148 m 236.14 Change in Route Status Report Per RW, updated link
- 07:37, 25 March 2015 diff hist -3 m 236.12 Quality Assurance Reviews
- 07:36, 25 March 2015 diff hist +122 m 236.12 Quality Assurance Reviews Per RW, updated link
- 07:34, 25 March 2015 diff hist +947 m 236.11 Mediation Per RW, updated numerous links
- 07:17, 25 March 2015 diff hist +538 m 236.10 Right Of Way Condemnation Per RW, updated links
- 13:42, 24 March 2015 diff hist 0 N File:Main Page Mar 24, 2015.jpg current
- 13:41, 24 March 2015 diff hist -795 m Main Page
- 07:27, 24 March 2015 diff hist +4 m Main Page
- 07:25, 24 March 2015 diff hist -8 m Main Page
- 09:41, 23 March 2015 diff hist 0 N File:Main Page Mar 23, 2015.jpg current
- 09:40, 23 March 2015 diff hist +507 m Main Page EPG 751.5.1.6
- 07:28, 23 March 2015 diff hist 0 N File:751.5.1.6 Additional.pdf