User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 07:47, 9 June 2015 diff hist +159 m Main Page EPG 1036.2.1.1
- 07:33, 9 June 2015 diff hist +180 m Category:1036 Reinforcing Steel for Concrete →1036.2.1.1 Reinforcing Steel, Dowel Bars, Mechanical Bar Splices and Cold Drawn Wire: Per Phys Lab, new guidance for sampling mechanical bar splices brings guidance to current practice
- 15:04, 8 June 2015 diff hist 0 m Main Page
- 14:48, 8 June 2015 diff hist +19 m Category:806 Pollution, Erosion and Sediment Control →806.1 Introduction (see Sec. 806): Per Hist Preservation, updated Mo State Operating Permit link
- 14:30, 8 June 2015 diff hist +79 m LPA:136.6 Environmental and Cultural Requirements →136.6.4.6 Base Floodplain and Regulatory Floodway: Per BR, updated links
- 07:26, 8 June 2015 diff hist +495 m LPA:136.13 LPA Policy Changes EPG 136.9.2.5
- 07:22, 8 June 2015 diff hist 0 m LPA:136.12 Figures, Glossary and Other Useful Links Fig 136.9.1
- 07:20, 8 June 2015 diff hist 0 N File:136.9.1 2015.xlsx
- 07:20, 8 June 2015 diff hist 0 m LPA:136.9 Plans, Specs and Estimates (PSE) Fig. 136.9.1 updated to reflect the need for haz waste reports for reno or demo
- 07:17, 8 June 2015 diff hist +527 m LPA:136.9 Plans, Specs and Estimates (PSE) →136.9.2.5 Bridge (Structure) Submittals: Per Design, added guidance (per Sec 202.40.1.1) that a notification of demo 10 days prior to start is required; also reno or demo requires haz waste report
- 09:20, 5 June 2015 diff hist -43 m Category:237 Contract Plans
- 09:18, 5 June 2015 diff hist +74 m Category:237 Contract Plans Per Design, updated link to Electronic Plans Room
- 09:03, 5 June 2015 diff hist +2 m Main Page
- 08:26, 5 June 2015 diff hist 0 N File:100 2015.jpg current
- 08:26, 5 June 2015 diff hist -8 m Category:100 GENERAL →100.1 Construction Inspection Guidelines for MoDOT Organization and Committees: new photo
- 08:16, 5 June 2015 diff hist +32 m 102.1 Construction Inspection Guidance for Sec 102
- 08:15, 5 June 2015 diff hist 0 N File:102.1.jpg current
- 15:04, 4 June 2015 diff hist +952 m Category:173 Erosion Control for Maintenance Operations Per MT, updated divisional link to the SharePoint link
- 07:10, 4 June 2015 diff hist +16 m Category:173 Erosion Control for Maintenance Operations →173.8.2 Regulatory Conditions for Working in Streams/Wetlands: Per MT, updated link
- 13:15, 3 June 2015 diff hist -5 m Main Page
- 13:14, 3 June 2015 diff hist 0 N File:Main Page 2 June 3, 2015.jpg current
- 13:14, 3 June 2015 diff hist 0 N File:Main Page June 3, 2015.jpg current
- 13:14, 3 June 2015 diff hist +61 m Main Page
- 12:57, 2 June 2015 diff hist 0 m Category:173 Erosion Control for Maintenance Operations →173.8.2 Regulatory Conditions for Working in Streams/Wetlands
- 12:55, 2 June 2015 diff hist +42 m Category:173 Erosion Control for Maintenance Operations Per MT, updated several Army Corps of Engineer links
- 08:35, 2 June 2015 diff hist 0 N File:Main Page June 2, 2015.jpg current
- 08:35, 2 June 2015 diff hist +34 m Main Page
- 15:19, 29 May 2015 diff hist 0 m Main Page
- 12:55, 29 May 2015 diff hist +361 m LPA:136.13 LPA Policy Changes Fig. 136.11.16
- 12:51, 29 May 2015 diff hist +100 m LPA:136.12 Figures, Glossary and Other Useful Links Added Fig. 136.11.16
- 12:49, 29 May 2015 diff hist 0 N File:Fig. 136.11.16.docx
- 12:49, 29 May 2015 diff hist +122 m LPA:136.11 Local Public Agency Construction Per LPA, new Fig. 136.11.16, Approved Contract Administration Software, added that IDs systems that secure diaries
- 10:17, 29 May 2015 diff hist +4 m Category:110 State and Federal Wage Rates and Other Requirements Per CM, cosmetically updated Form CR-1
- 10:16, 29 May 2015 diff hist 0 N File:110.3.1 wage interview May 2015.pdf
- 10:16, 29 May 2015 diff hist +4 m Category:101 Standard Forms →Construction and Materials: Per CM, cosmetically updated Form CR-1
- 07:38, 29 May 2015 diff hist +1 m 236.16 Outdoor Advertising →236.16.12 Digital Sign Upgrade Process
- 07:38, 29 May 2015 diff hist -12 m Main Page
- 07:37, 29 May 2015 diff hist +40 m 236.16 Outdoor Advertising →236.16.12 Digital Sign Upgrade Process
- 07:36, 29 May 2015 diff hist +36 m Main Page
- 07:35, 29 May 2015 diff hist -36 m Main Page
- 07:32, 29 May 2015 diff hist +10 m Main Page EPG 236.16.12.1
- 07:27, 29 May 2015 diff hist +57 m 236.16 Outdoor Advertising →236.16.12.1 Digital Upgrade Request: Per ODA, minor clarification
- 14:19, 28 May 2015 diff hist +208 m Main Page EPG 106
- 14:00, 28 May 2015 diff hist +11 m 106.21 Summary of Materials Inspected →106.21.1.1 Summary Packet of Materials Inspected: Per Phys Lab, clarified guidance to make the Summary of Concrete Component Testing portion of the summary report optional
- 13:58, 28 May 2015 diff hist +116 m 106.12 Pre-Acceptance Lists (PAL) →5) Frequency of Facility Review, Sampling and Testing: Per Phys Lab, clarified guidance to allow districts to review PAL facilities on a quarterly basis
- 09:02, 27 May 2015 diff hist +96 m Main Page EPG 108.1
- 08:31, 27 May 2015 diff hist -748 m Category:105 Control of Work →105.9.17 Subcontract Approval Request: Per CM, streamlined subcontract letting process and moved info primarily to EPG 108.1
- 08:29, 27 May 2015 diff hist +1,332 m Category:108 Prosecution and Progress →108.1 Subletting of Contract (for Sec 108.1): Per CM, clarified the contract subletting process as well as streamline the approval. Guidance on how to handle second tier subcontracting was added.
- 08:09, 27 May 2015 diff hist -6,477 m 236.4 Description Writing and Titles Numerous CCO contract link updates to SharePoint
- 13:28, 26 May 2015 diff hist 0 N File:Main Page May 26, 2015.jpg current