User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 10:51, 10 September 2015 diff hist +118 m LPA:136.12 Figures, Glossary and Other Useful Links Per BR, updated Figs. 136.6.11 and 136.6.12
- 10:47, 10 September 2015 diff hist +236 m LPA:136.6 Environmental and Cultural Requirements Per BR, provided link to latest version of SEMA's Floodplain Development Permit Application and No-Rise Certificate.
- 08:14, 10 September 2015 diff hist +269 m Main Page EPG 751.50
- 08:09, 10 September 2015 diff hist +425 m 751.50 Standard Detailing Notes →H2b. Precast Prestressed Panels (Notes for Bridge Standard Drawings): Per BR, added new references to prestressed truncated end deck panels.
- 14:44, 9 September 2015 diff hist +445 Main Page EPG 616.23.2.5.6, EPG 606.1.3.2, EPG 106.3.2.59.3, EPG 235.8
- 14:31, 9 September 2015 diff hist -382 617.1 Temporary Traffic Barriers →617.1.1 Temporary Concrete Traffic Barrier – Type F: Per TS, guidance for Temporary Concrete Traffic Barrier Standard Drawings now reflects recent crash studies.
- 14:29, 9 September 2015 diff hist -517 616.23 Traffic Control for Field Operations →616.23.2.5.6 Temporary Traffic Barrier: Per TS, guidance for Temporary Concrete Traffic Barrier Standard Drawings now reflects recent crash studies.
- 14:25, 9 September 2015 diff hist +1,982 606.1 Guardrail →606.1.3.2 Approved Crashworthy End Terminals: Per DE, end treatments are now further subdivided to more closely match the hardware to its intended use, performance, reusability, & cost of repair
- 14:21, 9 September 2015 diff hist +67 106.3.2.59 TM-59, Determination of the International Roughness Index →106.3.2.59.3 Construction Acceptance Procedures: Per CM, guidance now codifies the intent that no filters may be used to distort the true road profile measurement with an inertial profiler.
- 14:18, 9 September 2015 diff hist +3,864 Category:235 Preliminary Plans →235.8 Airports: Per DE, revision details requirements for Obstruction Evaluation/Airport Airspace Analysis that ensure FAA filing requirements are met when MoDOT operations impact FAA airspace
- 12:59, 9 September 2015 diff hist 0 Main Page
- 12:56, 9 September 2015 diff hist 0 N File:Main Page Sep 9, 2015.jpg current
- 12:55, 9 September 2015 diff hist +2 m Main Page
- 12:36, 8 September 2015 diff hist -104 m Main Page
- 12:17, 8 September 2015 diff hist -64 m Main Page EPG 751.50 and EPG 133.4.1
- 12:12, 8 September 2015 diff hist +6 m 133.4 Snow and Ice Control Operations →133.4.1 Route Classifications: Per MT, clarified non-continuous operations rtes. plowing guidance. It was never intented to meet objectives on these rtes. as soon as possible with 24/7 work.
- 11:30, 8 September 2015 diff hist +1,429 m 751.50 Standard Detailing Notes Per BR, cleaned up numerous notes and revised Bridge Approach Slab Notes to match recent release of new Bridge Approach Slab Std. Drawings
- 10:42, 8 September 2015 diff hist +85 m 751.6 General Quantities →751.6.1 Index of Quantities: Per BR, replaced Bridge Approach Slab (Bridge) pay items with new Bridge Approach Slab (Major Road) and Bridge Approach Slab (Minor Road).
- 10:27, 8 September 2015 diff hist +1 m 127.1 Request for Environmental Services
- 10:26, 8 September 2015 diff hist 0 N File:127.1.jpg current
- 10:25, 8 September 2015 diff hist +33 m 127.1 Request for Environmental Services added photo
- 10:09, 8 September 2015 diff hist 0 N File:Main Page Sep 8, 2015.jpg current
- 10:09, 8 September 2015 diff hist +88 m Main Page
- 07:06, 8 September 2015 diff hist -21 m 751.50 Standard Detailing Notes →A1. Design Specifications, Loadings & Unit Stresses: Per BR, revised underlining
- 09:24, 4 September 2015 diff hist +15 m Main Page
- 09:23, 4 September 2015 diff hist 0 N File:Main Page Sep 4, 2015.jpg current
- 09:22, 4 September 2015 diff hist +399 m Main Page
- 07:47, 4 September 2015 diff hist -14 m 751.50 Standard Detailing Notes →A1. Design Specifications, Loadings & Unit Stresses: Per BR, revised underlining
- 08:59, 3 September 2015 diff hist -113 m 121.1 Public Involvement and Decision-Making Per TP, updated link to map of Metropolitan Planning Organizations (MPOs) and Regional Planning Commissions (RPCs)
- 08:57, 3 September 2015 diff hist 0 N File:121.1 RPC MPO.pdf
- 08:57, 3 September 2015 diff hist -56 m 121.2 The Planning Framework for Transportation Decision-Making Per TP, updated link to map of Metropolitan Planning Organizations (MPOs) and Regional Planning Commissions (RPCs)
- 15:29, 2 September 2015 diff hist 0 m 141.7 Transportation Improvement Program Approval
- 15:28, 2 September 2015 diff hist 0 N File:141.7 mpo 2015.pdf
- 15:28, 2 September 2015 diff hist 0 m 141.7 Transportation Improvement Program Approval
- 15:24, 2 September 2015 diff hist 0 m 141.7 Transportation Improvement Program Approval
- 15:23, 2 September 2015 diff hist 0 N File:141.7 mpo 2015.jpg current
- 15:22, 2 September 2015 diff hist 0 m 141.7 Transportation Improvement Program Approval Per TP, updated MPO map
- 14:36, 2 September 2015 diff hist 0 m Main Page
- 15:11, 1 September 2015 diff hist +4 m Main Page
- 14:29, 1 September 2015 diff hist 0 m 141.7 Transportation Improvement Program Approval Per TP, Joplin Metro Planning Org now has a 2-year TIP cycle
- 14:24, 1 September 2015 diff hist -117 m 121.2 The Planning Framework for Transportation Decision-Making Per TP, removed link to outdated Practitioner's Guide
- 11:21, 1 September 2015 diff hist 0 N File:110.3.1 wage interview SP Sept 2015.pdf
- 11:21, 1 September 2015 diff hist 0 N File:110.3.1 wage interview Sept 2015.pdf
- 11:21, 1 September 2015 diff hist +97 m Category:110 State and Federal Wage Rates and Other Requirements Per ECR and CM, Wage Interview form updated to have date for the Inspector to indicate when the interview was performed, clarified the Reviewer date on the form, and added a date for any action taken.
- 10:34, 31 August 2015 diff hist 0 N File:Main Page Aug 31, 2015.jpg current
- 10:34, 31 August 2015 diff hist -456 m Main Page
- 14:41, 28 August 2015 diff hist +121 m Main Page EPG 751.50, EPG 751.14
- 08:28, 28 August 2015 diff hist -303 m 751.50 Standard Detailing Notes →A4. Protective Coatings: Per BR, renumbered 751.50 A4 Series of Protective Coating Notes
- 07:49, 28 August 2015 diff hist +1,455 m 751.14 Steel Superstructure →751.14.5.8 Protective Coating Requirements: Per BR, revised to conform to Sec 1081, clarifying when to use System I.
- 07:11, 28 August 2015 diff hist -700 m 236.7 Negotiation Per RW, updated link to Partial Deeds of Release, RW25