User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 10:58, 23 September 2015 diff hist -1 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.51.2 "Point of Presence" Sign
- 14:48, 22 September 2015 diff hist -66 m Main Page EPG 236.3.5.2
- 14:46, 22 September 2015 diff hist +95 m 236.3 Administration →236.3.5.2 Expenditure Accounting: Per RW, clarification of requirements to process payments for temporary or permanent easements
- 11:02, 22 September 2015 diff hist +192 m 236.5 Property Management →236.5.25 Leases, Licenses and Airspace License Agreements: Per RW, provided useful link
- 10:54, 22 September 2015 diff hist 0 m Category:941 Permits and Access Requests →941.5 Request by a City to Construct a “WELCOME TO” Monument: corrected acronym
- 09:34, 22 September 2015 diff hist +69 m Main Page EPG 136.3.8.10
- 09:01, 22 September 2015 diff hist +6 m LPA:136.12 Figures, Glossary and Other Useful Links EPG 136.3.8.10
- 08:57, 22 September 2015 diff hist +693 m LPA:136.13 LPA Policy Changes EPG 136.3.8.10 BEAP
- 08:56, 22 September 2015 diff hist 0 N File:Fig.136.3.23.docx current
- 08:55, 22 September 2015 diff hist -81 m LPA:136.3 Federal Aid Basics renamed file
- 08:53, 22 September 2015 diff hist +260 m LPA:136.3 Federal Aid Basics →136.3.8.10 Bridge Engineering Assistance Program (BEAP): Per BR, additional revisions to conform with new BEAP contract
- 08:27, 22 September 2015 diff hist +776 m LPA:136.13 LPA Policy Changes EPG 136.3.8.10
- 08:19, 22 September 2015 diff hist 0 N File:Fig.136.3.29.docx
- 08:19, 22 September 2015 diff hist 0 N File:Fig.136.3.22 2015.docx current
- 08:19, 22 September 2015 diff hist 0 N File:136.3.21 Sept 2015.docx
- 08:19, 22 September 2015 diff hist 0 N File:Fig.136.3.20 2015.docx
- 08:18, 22 September 2015 diff hist 0 N File:Fig.136.3.19 2015.docx
- 08:18, 22 September 2015 diff hist +146 m LPA:136.3 Federal Aid Basics Per BR, updated forms and added General Scope of Service form to conform with new BEAP contract.
- 08:12, 22 September 2015 diff hist +864 m LPA:136.3 Federal Aid Basics →136.3.8.10 Bridge Engineering Assistance Program (BEAP): Per BR, updated guidance to conform with new BEAP contract.
- 14:38, 21 September 2015 diff hist +93 m 236.7 Negotiation →236.7.1.12 Relocation Section Notices: updated link
- 14:36, 21 September 2015 diff hist +67 m 236.7 Negotiation →236.7.1.12 Relocation Section Notices: updated link
- 11:27, 18 September 2015 diff hist -411 m Main Page
- 11:24, 18 September 2015 diff hist +166 m Main Page EPG 618
- 11:11, 18 September 2015 diff hist +301 m Category:618 Mobilization Per Est. and Review, additional guidance to help districts with project estimates
- 07:31, 18 September 2015 diff hist +113 m 642.9 Sidewalk Ramp and Curb Ramp Design Criteria added link to new Std Plan 608.40
- 07:15, 18 September 2015 diff hist +118 m LPA:136.12 Figures, Glossary and Other Useful Links Established link to new Std Plan 608.50
- 07:14, 18 September 2015 diff hist +26 m 642.10 Curb Ramp Applications Established links to new Std Plan 608.50
- 07:12, 18 September 2015 diff hist +13 m Category:608 Concrete Median, Median Strip, Sidewalk, Curb Ramps, Steps and Paved Approaches Established link to new Std Plan 608.50
- 07:09, 18 September 2015 diff hist +52 m 642.9 Sidewalk Ramp and Curb Ramp Design Criteria Established link to new Std Plan 608.50
- 13:17, 17 September 2015 diff hist +372 m LPA:136.13 LPA Policy Changes EPG 136.11.18
- 13:13, 17 September 2015 diff hist +55 m LPA:136.11 Local Public Agency Construction →136.11.18 Final Plans: Per DE, clarification. MoDOT only needs as built plans when significant struct'l or mat'l changes have been made to original design plans, changes requiring approval of EOR
- 10:55, 17 September 2015 diff hist -1 LPA:136.10 Advertisement for Bid and Project Award →136.10.7.3 Bid Evaluation Considerations
- 10:48, 17 September 2015 diff hist +319 m LPA:136.13 LPA Policy Changes EPG 136.10.7.3
- 10:46, 17 September 2015 diff hist +130 m LPA:136.10 Advertisement for Bid and Project Award →136.10.7.3 Bid Evaluation Considerations: Per DE, the minimum standard for the number bid evaluations has been set at 3. When 3 bids are not available, the LPA is asked to explain.
- 10:05, 17 September 2015 diff hist 0 m LPA:136.7 Design minor correction
- 13:37, 16 September 2015 diff hist 0 N File:Main Page Sep 16, 2015.jpg current
- 13:37, 16 September 2015 diff hist +388 m Main Page
- 13:55, 15 September 2015 diff hist +62 m 903.18 Signing for School Areas →903.19.5.1 School Assembly Installation Contracts: Updated contract links
- 07:03, 15 September 2015 diff hist -41 m Category:235 Preliminary Plans →235.2.3 Project Agreements: Per Design, updated link
- 10:35, 14 September 2015 diff hist +315 m 236.5 Property Management →236.5.25 Leases and Airspace License Agreements: Per RW, updated guidance to conform with new revised approval process for the "WELCOME TO" Monument. Shown in EPG 941.5
- 10:24, 14 September 2015 diff hist +20 m Category:941 Permits and Access Requests updated link
- 09:07, 14 September 2015 diff hist +332 Main Page EPG 941.5
- 08:42, 14 September 2015 diff hist -4 m Category:941 Permits and Access Requests →941.5 Request by a City to Construct a “WELCOME TO” Monument: Per RW and TS, guidance has been provied for a revised approval process for the "WELCOME TO" Monument.
- 13:31, 11 September 2015 diff hist 0 N File:101 No Rise Certificate 2015.pdf
- 13:31, 11 September 2015 diff hist 0 N File:101 Floodplain Development Permit Application 2015.pdf
- 13:31, 11 September 2015 diff hist +10 m Category:101 Standard Forms →Bridge: Per BR, again updated Floodplain Development Permit Application and No-Rise Certificate forms
- 11:02, 10 September 2015 diff hist 0 N File:101 No Rise Certificate.pdf
- 11:01, 10 September 2015 diff hist 0 N File:101 Floodplain Development Permit Application.pdf
- 11:01, 10 September 2015 diff hist -28 m Category:101 Standard Forms →Bridge: Per BR, updated Floodplain Development Permit Application and No-Rise Certificate forms
- 10:52, 10 September 2015 diff hist +134 m LPA:136.13 LPA Policy Changes EPG 136.6