User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 09:28, 19 November 2015 diff hist -18 m Category:123 Federal-Aid Highway Program Updated link to PODI
- 08:39, 19 November 2015 diff hist +5 m Main Page
- 08:36, 19 November 2015 diff hist +85 m Main Page Help Article/EPG Approval Process
- 08:26, 19 November 2015 diff hist -38 m Help Article →EPG Approval Process: Guidance updated to reflect recent changes
- 16:05, 18 November 2015 diff hist -961 m 751.10 General Superstructure →751.10.3.1 Drain Type, Alignment and Spacing: Withdrew BR's revisions, from earlier in the day, to EPG 238.3.36.3, EPG 640.1.2 and EPG 751.10.3.1. These will be placed on the next ballot.
- 16:01, 18 November 2015 diff hist -3,544 m 640.1 Pavement Drainage Withdrew BR's revisions, from earlier in the day, to EPG 238.3.36.3, EPG 640.1.2 and EPG 751.10.3.1. These will be placed on the next ballot.
- 15:57, 18 November 2015 diff hist -5,219 m 238.3 Route Surveying Withdrew BR's revisions, from earlier in the day, to EPG 238.3.36.3, EPG 640.1.2 and EPG 751.10.3.1. These will be placed on the next ballot.
- 15:48, 18 November 2015 diff hist -374 m Main Page Withdrew BR's revisions to EPG 238.3.36.3.7, EPG 640.1.2 and EPG 751.10.3.1. These will be placed on the next ballot.
- 14:40, 18 November 2015 diff hist 0 N File:Main Page Nov 18, 2015.jpg current
- 14:40, 18 November 2015 diff hist +45 m Main Page EPG 238.3.36.3, EPG 640.1.2, EPG 751.10.3.1
- 14:08, 18 November 2015 diff hist +961 m 751.10 General Superstructure →751.10.3 Bridge Deck Drainage - Slab Drains: Per BR, design freq. & duration more closely match AASHTO recommendations; design spread more closely matches AASHTO & roadway design gutter spreads
- 13:44, 18 November 2015 diff hist +3,544 m 640.1 Pavement Drainage →640.1.2 Design Controls: Per BR, reorganized and clarified. Updated design gutter spreads to more closely match AASHTO recommendations and bridge gutter spread requirements.
- 13:21, 18 November 2015 diff hist +588 m 238.3 Route Surveying →238.3.36.3 Stream Crossings: Per BR, E 238.3.36.3.17: replaced guidance on Major Streams with guidance for Multiple Structures (in the same floodplain).
- 13:14, 18 November 2015 diff hist 0 N File:238.3.36.3.7 valley.jpg current
- 13:14, 18 November 2015 diff hist +2 m 238.3 Route Surveying →238.3.36.3.7 Valley Sections
- 13:12, 18 November 2015 diff hist 0 N File:238.3.36.3.7 initial.jpg current
- 13:12, 18 November 2015 diff hist +4,629 m 238.3 Route Surveying →238.3.36.3.7 Valley Sections: Per BR, updated to more closely reflect guidance in HEC-RAS user manual. Added guidance for valley sections at stream junctions.
- 11:31, 18 November 2015 diff hist -150 m Category:606 Guardrail and Guard Cable Per EPG, removed link to fed "Roadside Terminal" brochure since this brochure referenced ET-Plus on page 3 of 4
- 15:55, 17 November 2015 diff hist +6 m Main Page EPG 1032
- 15:53, 17 November 2015 diff hist +783 Category:1032 Precast Concrete Flared End Sections Per CM, allows a concrete pipe manufacturer to use steel fibers in concrete flared end sections instead of standard reinforcing steel.
- 14:42, 17 November 2015 diff hist +1 m Main Page
- 14:03, 17 November 2015 diff hist -480 m 236.13 Designing Right of Way Plans →236.13.14.2 Right of Way Obtained by Condemnation: Per RW, clarified guidance. References to paper copies removed.
- 15:44, 16 November 2015 diff hist -1 m Category:101 Standard Forms Wage interview form (CR-1)
- 15:44, 16 November 2015 diff hist 0 N File:110.3.1 wage interview Nov 2015.pdf
- 15:44, 16 November 2015 diff hist -1 m Category:110 State and Federal Wage Rates and Other Requirements Per CM, minor update of the Wage Interview form. It can now aslo be filled out on the Cell phones and tablets.
- 12:10, 16 November 2015 diff hist +1 m Category:101 Standard Forms
- 16:21, 13 November 2015 diff hist 0 N File:616.14 WZ Questions Nov 2015.docx
- 16:21, 13 November 2015 diff hist +16 m 616.14 Work Zone Safety and Mobility Policy Per DE, updated "WZ Questions for the Core Team"
- 13:44, 13 November 2015 diff hist +1 m Main Page
- 09:10, 13 November 2015 diff hist +1 m Category:502 Portland Cement Concrete Base and Pavement →502.1.12.1 Pay Factors (Sec 502.15.7)
- 09:08, 13 November 2015 diff hist -154 m Category:502 Portland Cement Concrete Base and Pavement →502.1.12.1 Pay Factors (Sec 502.15.7): Per CM, deleted unecessary sentence with an archaic link.
- 15:57, 10 November 2015 diff hist 0 m Main Page
- 15:41, 10 November 2015 diff hist -50 m 238.4 Construction Surveying Per BR, removed reference to archaic form (BR 105)
- 15:26, 10 November 2015 diff hist -4 m 751.1 Preliminary Design →751.1.2.32 FHWA Submittal: Per BR, replaced reference to archaic form with Bridge Survey Report
- 14:34, 10 November 2015 diff hist -2 m Main Page
- 16:06, 6 November 2015 diff hist 0 m Main Page
- 16:01, 6 November 2015 diff hist 0 m Main Page
- 15:59, 6 November 2015 diff hist 0 N File:Main Page Nov 6, 2015.jpg current
- 15:59, 6 November 2015 diff hist +131 m Main Page
- 14:29, 6 November 2015 diff hist +148 m LPA:136.13 LPA Policy Changes Fig. 136.4.1
- 14:27, 6 November 2015 diff hist -1 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.4.1
- 14:27, 6 November 2015 diff hist 0 N File:Fig. 136.4.1 Nov 2015.docx
- 14:27, 6 November 2015 diff hist -7 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, Fig. 136.4.1's Attachment E Section 7 modified to reflect that on-call consultant contracts now set DBE goals
- 09:46, 6 November 2015 diff hist 0 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.2.4.3.2 LPA Consideration of DBE for On-Call Contracts
- 09:39, 6 November 2015 diff hist +431 m LPA:136.13 LPA Policy Changes EPG 136.4.2.4.3.2
- 09:37, 6 November 2015 diff hist +1,058 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.2.4.3.2 Consideration of DBE for On-Call Contracts: Per LPA, DBE Goals will now be established on LPA On-Call Consultant Contracts, replacing the statewide programmatic goal.
- 09:29, 6 November 2015 diff hist +8 m LPA:136.13 LPA Policy Changes updated link
- 09:07, 6 November 2015 diff hist +368 m Main Page EPG 134.2.4
- 09:03, 6 November 2015 diff hist +462 m Category:134 Engineering Professional Services →134.2.4 Consultant Solicitation and Selection Process – Standard Solicitation Method for On-Call Cost Plus Fixed Fee Contracts: Per LPA, DBE Goals will now be set by PMs/CAs on on-call contracts
- 09:36, 5 November 2015 diff hist 0 m 751.1 Preliminary Design →751.1.2.5.1 Grade Separations: Per BR, previous RR vertical clearance revision to 23' 4" temporarily placed on hold awaiting BR's consensus.