User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 11:56, 8 December 2015 diff hist +99 m Category:505 Bridge Deck Concrete Wearing Surface
- 11:56, 8 December 2015 diff hist 0 N File:505.1.2 Latex modified concrete.pdf current
- 11:56, 8 December 2015 diff hist +98 m Category:505 Bridge Deck Concrete Wearing Surface →505.1.2 Latex Modified Concrete (Sec 505.20): Per CM, added Latex Modified Concrete Best Practices Tutorial
- 11:38, 8 December 2015 diff hist -525 m 751.1 Preliminary Design →751.1.2.32 FHWA Submittal: Per EPG, updated terminology to current "federal involvement" instead of "Full Oversight"
- 11:26, 8 December 2015 diff hist +23 m 616.14 Work Zone Safety and Mobility Policy →616.14.8 Significant Projects: Per EPG, updated terminology to current "federal involvement" instead of "Full Oversight"
- 11:22, 8 December 2015 diff hist +34 m 237.9 Submission of Plans and Supporting Documents →237.9.6.10 Plans Distribution: Per EPG, updated terminology to current "federal involvement" instead of "Full Oversight"
- 11:20, 8 December 2015 diff hist +46 m 237.9 Submission of Plans and Supporting Documents →237.9.5 Checking Plans: Per EPG, updated terminology to current "federal involvement" instead of "Full Oversight"
- 11:17, 8 December 2015 diff hist +60 m Category:235 Preliminary Plans →235.6 Approval of Preliminary Plan: Per EPG, updated terminology to current "federal involvement" instead of "Full Oversight"
- 11:14, 8 December 2015 diff hist +30 m 234.6 Diverging Diamond Interchanges →234.6.2.2.6 Ramp and Preliminary Plan Criteria: Per EPG, updated terminology to current "federal involvement" instead of "Full Oversight"
- 11:05, 8 December 2015 diff hist +212 m 147.1 Alternative Technical Concepts →147.1.3 Types of ATCs: Per EPG, updated terminology to current "federal involvement" instead of "Full Oversight"
- 10:51, 8 December 2015 diff hist +46 m Category:134 Engineering Professional Services →134.2.2.5 Solicitation and Selection Step 5 – Selection of Consultant: Per EPG, updated terminology to current "federal involvement" instead of "Full Oversight"
- 10:48, 8 December 2015 diff hist 0 N File:131.1.4.1.2 2015.jpg current
- 10:48, 8 December 2015 diff hist 0 N File:131.1.4.1.1 2015.jpg current
- 10:47, 8 December 2015 diff hist +703 m 131.1 Design Exception Process Per EPG, updated terminology to current "federal involvement" instead of "Full Oversight"
- 09:37, 8 December 2015 diff hist +164 m Category:128 Conceptual Studies →128.10 Conceptual Study Report Approval and Submittal: Per EPG, updated terminology to current "federal involvement" instead of "Full Oversight"
- 09:25, 8 December 2015 diff hist +73 m Category:123 Federal-Aid Highway Program Per EPG, updated terminology to current "federal involvement" instead of "Full Oversight"
- 09:18, 8 December 2015 diff hist +401 m Category:109 Measurement and Payment →109.12 Change Orders (for Sec 109.12): Per EPG, updated terminology to current "federal involvement" instead of "Full Oversight"
- 08:57, 8 December 2015 diff hist +59 m Category:105 Control of Work →105.19 Digital Signatures (Sec 105.19): Per EPG, updated terminology to current "federal involvement" instead of "Full Oversight"
- 08:55, 8 December 2015 diff hist +231 m 104.13 Construction Inspection Guidance for Sec 104 →104.13.2 Value Engineering Proposals (Sec 104.6): Per EPG, updated terminology to current "federal involvement" instead of "Full Oversight"
- 16:26, 3 December 2015 diff hist -128 m Main Page
- 16:24, 3 December 2015 diff hist +15 m Main Page
- 16:23, 3 December 2015 diff hist 0 N File:Main Page 2 Dec 3, 2015.jpg current
- 16:23, 3 December 2015 diff hist 0 N File:Main Page Dec 3, 2015.jpg current
- 16:22, 3 December 2015 diff hist +130 m Main Page
- 15:51, 3 December 2015 diff hist 0 N File:Fig 104.7 2015.doc
- 15:50, 3 December 2015 diff hist 0 m 104.7 Scoping Estimates Per Bidding and Est, updated Cost Estimate Guide
- 11:11, 3 December 2015 diff hist +58 m 127.29 Stormwater Per Env'l, updated MDNR links
- 10:58, 3 December 2015 diff hist +495 m Category:172 Maintenance Facility Performance Expectations Environmental Compliance Per Env'l, updated legal references and links
- 14:18, 2 December 2015 diff hist +987 m 127.17 Wetland and Stream Mitigation Banking Per Envir'l, clarifications and links added
- 11:39, 2 December 2015 diff hist +8 m 127.16 Wetland and Stream Mitigation Per Envir'l, minor clarification
- 15:48, 1 December 2015 diff hist +1 m Main Page
- 09:05, 1 December 2015 diff hist -11 m 751.5 Structural Detailing Guidelines →751.5.4.1 Precast P/S Concrete Girders and Beams: Per BR, updated NU Girder links
- 08:15, 1 December 2015 diff hist 0 N File:616.14 WZ Questions Nov 30 2015.docx
- 08:14, 1 December 2015 diff hist +12 m 616.14 Work Zone Safety and Mobility Policy Per DE, updated "WZ Questions for the Core Team"
- 15:25, 30 November 2015 diff hist +22 m Main Page
- 15:19, 30 November 2015 diff hist -36 m Main Page EPG 127.25.8.3.2
- 14:52, 30 November 2015 diff hist +226 m 127.25 Maintenance Environmental Policies →127.25.8.3.2 System Attachments by Others: Per Envr'l, clarified guidance for connections to MoDOT's drainage related to MS4 permit. Those reviewing policy will investigate further.
- 14:41, 30 November 2015 diff hist -201 m 751.5 Structural Detailing Guidelines →751.5.4.5 Bridge Decks: Per BR, updated links
- 14:08, 30 November 2015 diff hist +203 m Main Page EPG 903.5, EPG 903.6
- 13:43, 30 November 2015 diff hist +757 m 903.5 Regulatory Signs →903.5.36 Weight Limit Signs (R12 Series) (MUTCD Section 2B.59): Per TS, added the NOTICE plaque for use on bridge weight limit changes as well as an option for other regulatory signs.
- 13:40, 30 November 2015 diff hist 0 m 903.2 Extent of Signing →903.2.25 Enhanced Conspicuity for Standard Signs (MUTCD Section 2A.15)
- 13:35, 30 November 2015 diff hist 0 N File:903.6.59.jpg current
- 13:35, 30 November 2015 diff hist +1,229 m 903.6 Warning Signs →903.6.58 TRAVEL SAFE ZONE – FINES DOUBLED Sign (W26-1): Per TS, new EPG 903.6.59 NOTICE Plaque (W16-18P) for use on bridge weight limit changes as well as an option for other regulatory signs.
- 13:27, 30 November 2015 diff hist +2 m 903.2 Extent of Signing →903.2.25 Enhanced Conspicuity for Standard Signs (MUTCD Section 2A.15)
- 13:27, 30 November 2015 diff hist 0 N File:903.2.25.1 2015.jpg current
- 13:26, 30 November 2015 diff hist +404 m 903.2 Extent of Signing →903.2.25 Enhanced Conspicuity for Standard Signs (MUTCD Section 2A.15): Per TS, added the NOTICE plaque for use on bridge weight limit changes as well as an option for other regulatory signs.
- 11:01, 30 November 2015 diff hist 0 N File:236.16.2 map Nov 2015.jpg current
- 11:00, 30 November 2015 diff hist +12 m 236.16 Outdoor Advertising Per RW, updated map
- 09:15, 25 November 2015 diff hist -443 m Main Page EPG 941.5, EPG 236.5.15
- 08:30, 25 November 2015 diff hist +79 m 236.5 Property Management →236.5.15 Methods for Disposal: inserted link