User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 10:24, 18 February 2016 diff hist +1 m 616.23 Traffic Control for Field Operations
- 10:18, 18 February 2016 diff hist -1 m LPA:136.13 LPA Policy Changes
- 10:18, 18 February 2016 diff hist +149 m LPA:136.13 LPA Policy Changes Fig. 136.11.22
- 10:16, 18 February 2016 diff hist +85 m LPA:136.12 Figures, Glossary and Other Useful Links Fig 136.11.22
- 10:14, 18 February 2016 diff hist 0 N File:136.11.22.docx current
- 10:14, 18 February 2016 diff hist +32 m LPA:136.11 Local Public Agency Construction Per LPA, relabeled Final Acceptance Checklist as new Fig. 136.11.22 LPA Final Acceptance Checklist
- 09:45, 18 February 2016 diff hist -5 m LPA:136.12 Figures, Glossary and Other Useful Links Fig 136.11.19 restored
- 09:35, 18 February 2016 diff hist -10 m LPA:136.11 Local Public Agency Construction restored earlier version of Fig. 136.11.19
- 12:28, 17 February 2016 diff hist +5 m LPA:136.12 Figures, Glossary and Other Useful Links Fig 136.11.19
- 12:28, 17 February 2016 diff hist 0 N File:136.11.19 2016.docx
- 12:28, 17 February 2016 diff hist +10 m LPA:136.11 Local Public Agency Construction Per LPA, minor modifications to Fig. 136.11.19, Final Acceptance Checklist
- 08:50, 17 February 2016 diff hist -7 m LPA:136.12 Figures, Glossary and Other Useful Links Fig 136.4.10
- 08:50, 17 February 2016 diff hist 0 N File:136.4.10 2016.xlsx current
- 08:49, 17 February 2016 diff hist -14 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, minor correction to spreadsheet
- 15:43, 16 February 2016 diff hist 0 m Main Page
- 13:22, 16 February 2016 diff hist 0 m LPA:136.7 Design →136.7.2.6.1 Utility Relocations: Per LPA, updated link
- 15:52, 11 February 2016 diff hist 0 N File:Main Page Feb 11, 2016.jpg current
- 15:52, 11 February 2016 diff hist +172 m Main Page
- 11:19, 10 February 2016 diff hist +19 m LPA:136.7 Design →136.7.2.6.1 Utility Relocations: updated RSMO link
- 09:48, 10 February 2016 diff hist -2 m Main Page
- 14:43, 9 February 2016 diff hist 0 m 903.18 Signing for School Areas →Table 903.19.1 School Area Sign and Plaque Sizes: Per TS, corrected the dimensions for W16-9P to correspond with those of the MUTCD
- 11:10, 9 February 2016 diff hist -8 m 620.2 Pavement and Curb Markings (MUTCD Chapter 3B) →620.2.20 Pavement Word, Symbol and Arrow Markings (MUTCD Section 3B.20): updated link
- 11:09, 9 February 2016 diff hist -9 m 620.2 Pavement and Curb Markings (MUTCD Chapter 3B) →620.2.20 Pavement Word, Symbol and Arrow Markings (MUTCD Section 3B.20): updated link
- 11:06, 9 February 2016 diff hist -5 m 620.2 Pavement and Curb Markings (MUTCD Chapter 3B) →620.2.11 Raised Pavement Markers (MUTCD Section 3B.11): updated link
- 11:04, 9 February 2016 diff hist -8 m 620.2 Pavement and Curb Markings (MUTCD Chapter 3B) →620.2.18 Crosswalk Markings (MUTCD Section 3B.18): updated link
- 09:52, 9 February 2016 diff hist -39 m 236.3 Administration →236.3.7.5 Distribution of Clearance Certification: Per RW, update reflects current requirements, clarifies any confusion
- 13:14, 8 February 2016 diff hist -7 m Category:1045 Paint for Structural Steel →1045.1 Apparatus: Per CM, updated link
- 12:03, 8 February 2016 diff hist +110 m Category:1045 Paint for Structural Steel →1045.1 Apparatus: Per Chem Lab and Phys Lab, added link to the "Approved and Pre-Qualified List" table
- 11:47, 8 February 2016 diff hist -194 m Main Page EPG 236.3
- 11:07, 8 February 2016 diff hist +1,250 m 236.3 Administration Per RW and FHWA, provided A-Date and clearance process for right of way on design-build projects.
- 08:36, 8 February 2016 diff hist 0 N File:Moving Files from SharePoint to CIA 2016.docx
- 08:36, 8 February 2016 diff hist +5 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, updated QRG Moving Contract Files from SharePoint to CIA
- 10:43, 3 February 2016 diff hist +151 m Main Page EPG 751.50
- 10:34, 3 February 2016 diff hist +59 m 751.50 Standard Detailing Notes →G1. Concrete Bents: Per BR, clarified #5-H (L shaped) approach slab anchorage bars, end of slab, and fill face of end bent. Revised lap splice for U and V bars in end bents.
- 10:03, 3 February 2016 diff hist 0 N File:Main Page Feb 3, 2016.jpg current
- 10:03, 3 February 2016 diff hist +261 m Main Page
- 09:29, 3 February 2016 diff hist +246 m 751.35 Concrete Pile Cap Integral End Bents adjusted figures
- 09:07, 3 February 2016 diff hist 0 N File:751.35.4.4 plan.jpg current
- 09:06, 3 February 2016 diff hist 0 N File:751.35.4. sections.jpg current
- 09:06, 3 February 2016 diff hist 0 N File:751.35.4.3 skewed.jpg current
- 09:05, 3 February 2016 diff hist 0 N File:751.35.4.3 sections.jpg current
- 09:05, 3 February 2016 diff hist 0 N File:751.35.4.3.jpg current
- 09:05, 3 February 2016 diff hist 0 N File:751.35.4.2 section d-d.jpg current
- 09:04, 3 February 2016 diff hist 0 N File:751.35.4.2 sections.jpg current
- 09:04, 3 February 2016 diff hist 0 N File:751.35.4.2 2016.jpg current
- 09:04, 3 February 2016 diff hist 0 N File:751.35.4.1 section d-d.jpg current
- 09:03, 3 February 2016 diff hist 0 N File:751.35.4.1 sections.jpg current
- 09:03, 3 February 2016 diff hist 0 N File:751.35.4.1 2016.jpg current
- 09:02, 3 February 2016 diff hist 0 N File:751.35.3.5 section d-d.jpg current
- 09:02, 3 February 2016 diff hist 0 N File:751.35.3.5 section a-a.jpg current