User contributions for Smithk
Jump to navigation
Jump to search
30 June 2016
- 08:2408:24, 30 June 2016 diff hist −6 m 751.40 LFD Widening and Repair →751.40.4.3 Replacement of Existing Rail with Thrie Beam Rail: Per BR, updated several internet links
29 June 2016
- 13:5213:52, 29 June 2016 diff hist 0 m Category:110 State and Federal Wage Rates and Other Requirements →110.3 Prevailing Wages and Records (Guidance for Sec 110.3): Per CM, minor correction
- 10:1710:17, 29 June 2016 diff hist −121 m 751.9 Bridge Seismic Design →751.9.2.6.4 Pile Lateral and Rotational Stiffness, (p-y curves): Per BR, accommodates removal of Table 751.9.2.4.1. If only SPT data are known, soil property are est'd from correlation charts
- 10:1410:14, 29 June 2016 diff hist +115 m 751.9 Bridge Seismic Design →751.9.2.4.1 Soil Properties: Per BR, updated text to accommodate the removal of Table 751.9.2.4.1. If only SPT data are known, soil property are now estimated from correlation charts.
28 June 2016
- 15:2015:20, 28 June 2016 diff hist +105 m Main Page No edit summary
- 12:3412:34, 28 June 2016 diff hist −8 m Category:550 Portland Cement Concrete Pavement Design Per DE, updated outdated reference to a JSP in the text. The JSP is not in the General Provisions
- 11:2911:29, 28 June 2016 diff hist 0 N File:236.8.8.3 Business or Farm Fixed Payment Claim.docx No edit summary
- 11:2811:28, 28 June 2016 diff hist −134 m 236.8 Relocation Assistance Program Per RW, updated link to 236.8.8.3 Business or Farm Operation Fixed Payment Claim form
- 10:5510:55, 28 June 2016 diff hist 0 N File:Main Page June 28, 2016.jpg No edit summary current
- 10:5510:55, 28 June 2016 diff hist −190 m Main Page EPG 751.9, EPG 450.9, EPG 751.1.3.4
- 10:3010:30, 28 June 2016 diff hist 0 N File:Fig. 616.13.jpg No edit summary current
- 10:3010:30, 28 June 2016 diff hist 0 N File:616.13 Traffic Segment.pdf No edit summary current
- 10:3010:30, 28 June 2016 diff hist −20 m 616.19 Work Zone Capacity, Queue and Travel Delay Per TS, updated Traffic Segment Hourly Volume instructions and Fig. 616.13 (to show a current version of the TSHV application)
- 08:2908:29, 28 June 2016 diff hist −8 m Category:450 Bituminous Pavement Design →450.9 Safety EdgeSM: Per DE, updated outdated reference to a JSP in the text. The JSP is not in the General Provisions
- 08:2008:20, 28 June 2016 diff hist +209 m 751.1 Preliminary Design →751.1.3.4 Railing Type, Height and Guidelines for Curb Blockouts: Per BR, clarified guidance that bridge rails on single lane bridges may be used in place if grade is not raised.
- 07:2107:21, 28 June 2016 diff hist −2 m 751.9 Bridge Seismic Design →751.9.2.4.1 Soil Properties
- 07:2107:21, 28 June 2016 diff hist −8,157 m 751.9 Bridge Seismic Design →Table 751.9.2.4.1 Soil Property Correlations: Per BR, removed outdated Table 751.9.2.4.1 Soil Property Correlations
27 June 2016
- 14:4514:45, 27 June 2016 diff hist 0 m Main Page No edit summary
24 June 2016
- 08:4408:44, 24 June 2016 diff hist 0 m Main Page No edit summary
23 June 2016
- 10:5910:59, 23 June 2016 diff hist +211 m LPA:136.13 LPA Policy Changes EPG 136.11.5
- 10:5810:58, 23 June 2016 diff hist +417 m LPA:136.11 Local Public Agency Construction →136.11.5 Subcontracts: Per LPA, guidance clarified to indicate that subcontracts require FHWA Form 1273
22 June 2016
- 14:3914:39, 22 June 2016 diff hist 0 m Main Page No edit summary
- 08:2308:23, 22 June 2016 diff hist 0 N File:751.10.1.7.2 2016.jpg No edit summary current
- 08:2308:23, 22 June 2016 diff hist +26 m 751.10 General Superstructure →751.10.1.7.2 Standard Partial Depth Precast Prestressed Panel Bridge Deck Slabs Using SIP P/C P/S Panel Forms: Per BR, Clarification of clearance
- 08:0708:07, 22 June 2016 diff hist +29 m Main Page EPG 751.37, EPG 751.37
- 07:4107:41, 22 June 2016 diff hist +120 m 751.50 Standard Detailing Notes →G1. Concrete Bents: Per BR, provided concrete column, drilled shaft/socket stirrups/ties and longitudinal reinforcement lap length requirements that meet AASHTO LRFD
- 07:3907:39, 22 June 2016 diff hist +521 m 751.37 Drilled Shafts →751.37.6.1 Reinforcement Design: Per BR, provided concrete column, drilled shaft/socket stirrups/ties and longitudinal reinforcement lap length requirements that meet AASHTO LRFD
- 07:3407:34, 22 June 2016 diff hist 0 m 751.31 Open Concrete Intermediate Bents →751.31.3.2 Column
- 07:3307:33, 22 June 2016 diff hist 0 N File:751.31.3.2 stagger 2016.jpg No edit summary current
- 07:3307:33, 22 June 2016 diff hist +191 m 751.31 Open Concrete Intermediate Bents →751.31.3.2 Column: Per BR, provided concrete column, drilled shaft/socket stirrups/ties and longitudinal reinforcement lap length requirements that meet AASHTO LRFD
21 June 2016
- 12:5912:59, 21 June 2016 diff hist +1 m Main Page No edit summary
- 10:3410:34, 21 June 2016 diff hist +96 m Category:109 Measurement and Payment →109.14 Price Adjustment for Fuel (for Sec 109.14): Per CM, clarified fuel adjustment guidance pertaining to pay items in 4 categories
- 09:1509:15, 21 June 2016 diff hist −216 m 616.23 Construction Inspection Guidelines for Sec 616 removed archaic links
- 09:0109:01, 21 June 2016 diff hist 0 N File:134.5.2 2016.docx No edit summary
- 09:0109:01, 21 June 2016 diff hist 0 N File:134.4.1 June 2016.docx No edit summary current
- 09:0109:01, 21 June 2016 diff hist 0 N File:134.2.2.5.7 2016.docx No edit summary current
- 09:0109:01, 21 June 2016 diff hist 0 N File:134.2.2.5.6 2016.docx No edit summary current
- 09:0109:01, 21 June 2016 diff hist 0 N File:134.2.2.5.4 June 2016.doc No edit summary current
- 09:0009:00, 21 June 2016 diff hist 0 N File:134.2.2.5.3 June 2016.docx No edit summary current
- 09:0009:00, 21 June 2016 diff hist 0 N File:134.2.2.2 June 2016.doc No edit summary current
- 09:0009:00, 21 June 2016 diff hist −35 m Category:134 Engineering Professional Services Per DE, updated numerous forms
- 07:3207:32, 21 June 2016 diff hist 0 N File:104.7 Engineering Factors Report 13 to 15.pdf No edit summary
- 07:3207:32, 21 June 2016 diff hist +1 m 104.7 Scoping Estimates No edit summary
- 07:2907:29, 21 June 2016 diff hist 0 N File:104.7 Engineering Factors Report 11 to 13.pdf No edit summary
- 07:2907:29, 21 June 2016 diff hist +75 m 104.7 Scoping Estimates Per TP, added historical eng'g factors report for 2013-2015
- 07:2707:27, 21 June 2016 diff hist 0 N File:104.7 Engineering Factors Report 12 to 14.pdf No edit summary
- 07:2607:26, 21 June 2016 diff hist 0 N File:104.7 Engineering Factors Report 10 to 12.pdf No edit summary
- 07:2607:26, 21 June 2016 diff hist −102 m 104.7 Scoping Estimates Per TP, updated link to historic reports
20 June 2016
- 13:3413:34, 20 June 2016 diff hist 0 m 751.1 Preliminary Design →751.1.2.29 Protection of Spill Slopes and Side Slopes: correction of spelling
- 12:1712:17, 20 June 2016 diff hist +5 m Category:101 Standard Forms Per Bridge, updated Request for Final Soundings for Structures Form at the request of Geotechnical