User contributions for Smithk
Jump to navigation
Jump to search
17 February 2017
- 10:3710:37, 17 February 2017 diff hist +1 m LPA:136.12 Figures, Glossary and Other Useful Links No edit summary
- 10:3610:36, 17 February 2017 diff hist +77 m LPA:136.12 Figures, Glossary and Other Useful Links Per ECR, updated link
- 10:0910:09, 17 February 2017 diff hist +13 m Main Page EPG 236.7.4.5
- 10:0610:06, 17 February 2017 diff hist −1,203 m 236.7 Negotiation →236.7.4.5 Subordination of Mortgage Liens: Per RW, updated guidance to our current practices
- 09:4909:49, 17 February 2017 diff hist +139 m 751.32 Concrete Pile Cap Intermediate Bents →751.32.4.2 Encased Pile Cap Bent
- 09:4909:49, 17 February 2017 diff hist +139 m 751.32 Concrete Pile Cap Intermediate Bents →751.32.4.1 Typical Pile Cap Bent
- 09:4509:45, 17 February 2017 diff hist 0 m 751.31 Open Concrete Intermediate Bents →751.31.3.5 Hammer Head Type
- 09:4509:45, 17 February 2017 diff hist 0 m 751.31 Open Concrete Intermediate Bents →751.31.3.3 Web Beam
- 09:4309:43, 17 February 2017 diff hist 0 m 751.31 Open Concrete Intermediate Bents →751.31.3.1 Beam Cap
- 08:4008:40, 17 February 2017 diff hist +1 m 751.9 Bridge Seismic Design →751.9.3.1.7 T- Joint Connections
- 08:2308:23, 17 February 2017 diff hist −49 751.50 Standard Detailing Notes →B3. Estimated Quantities Tables: Removed, per BR
- 08:2108:21, 17 February 2017 diff hist +201 751.34 Concrete Pile Cap Non-Integral End Bents →751.34.3.2 Wide Flange Beams, Plate Girders and Prestressed Girders: Per BR, sentence inadvertently omitted from previous revision.
16 February 2017
- 16:0616:06, 16 February 2017 diff hist +214 m 902.4 Design Features of Traffic Control Signals (MUTCD Chapter 4D) Per TS, inserted link
15 February 2017
- 15:5115:51, 15 February 2017 diff hist −1 m LPA:136 Local Public Agency (LPA) Policy No edit summary
- 14:4714:47, 15 February 2017 diff hist +441 m Main Page EPG 616.6, EPG 902.4, EPG 127.29, EPG 751.9
- 14:0414:04, 15 February 2017 diff hist +107 m 616.16 Typical Applications (MUTCD Chapter 6P) No edit summary
- 14:0214:02, 15 February 2017 diff hist 0 N File:616.8.50 2017.pdf No edit summary
- 14:0114:01, 15 February 2017 diff hist 0 616.16 Typical Applications (MUTCD Chapter 6P) →Listing of Typical Applications for Design and Construction and Materials: Per TS, implement Work Zone No Phone Zone Signs. TA-50 updated.
- 13:4513:45, 15 February 2017 diff hist 0 m 751.9 Bridge Seismic Design →751.9.3.1.7 T- Joint Connections
- 13:4313:43, 15 February 2017 diff hist 0 N File:751.9.3.1.7.6 2017.jpg No edit summary current
- 13:4213:42, 15 February 2017 diff hist 0 N File:751.9.3.1.7.4 2017.jpg No edit summary current
- 13:4213:42, 15 February 2017 diff hist +11 m 751.9 Bridge Seismic Design →751.9.3.1.7 T- Joint Connections: Per BR, expanded the use of epoxy coated reinforcement in bridge structures
- 13:3113:31, 15 February 2017 diff hist −660 751.50 Standard Detailing Notes Per BR, expanded the use of epoxy coated reinforcement in bridge structures
- 13:1813:18, 15 February 2017 diff hist 0 N File:751.35.4.3 2017.jpg No edit summary current
- 13:1813:18, 15 February 2017 diff hist +205 751.35 Concrete Pile Cap Integral End Bents →751.35.4 Reinforcement: Per BR, expanded the use of epoxy coated reinforcement in bridge structures
- 13:1213:12, 15 February 2017 diff hist +94 751.34 Concrete Pile Cap Non-Integral End Bents →751.34.3.2 Wide Flange Beams, Plate Girders and Prestressed Girders: Per BR, expanded the use of epoxy coated reinforcement in bridge structures
- 13:0913:09, 15 February 2017 diff hist 0 m 751.32 Concrete Pile Cap Intermediate Bents No edit summary
- 13:0813:08, 15 February 2017 diff hist 0 m 751.31 Open Concrete Intermediate Bents No edit summary
- 13:0713:07, 15 February 2017 diff hist 0 m 751.24 Retaining Walls No edit summary
- 13:0513:05, 15 February 2017 diff hist 0 m 751.10 General Superstructure No edit summary
- 13:0513:05, 15 February 2017 diff hist 0 m 751.5 Structural Detailing Guidelines →751.5.9.2.2 Epoxy-Coated Reinforcement Requirements
- 13:0413:04, 15 February 2017 diff hist 0 m 751.8 Concrete Box Culverts No edit summary
- 13:0313:03, 15 February 2017 diff hist +172 751.32 Concrete Pile Cap Intermediate Bents →751.32.4 Reinforcement: Per BR, expanded the use of epoxy coated reinforcement in bridge structures
- 12:5912:59, 15 February 2017 diff hist 0 m 751.8 Concrete Box Culverts →751.8.1.1 Material Properties
- 12:4712:47, 15 February 2017 diff hist +74 m 751.31 Open Concrete Intermediate Bents No edit summary
- 12:4012:40, 15 February 2017 diff hist +4 m 751.31 Open Concrete Intermediate Bents →751.31.3.1 Beam Cap
- 12:3912:39, 15 February 2017 diff hist +8 m 751.31 Open Concrete Intermediate Bents →751.31.3.1 Beam Cap
- 12:3912:39, 15 February 2017 diff hist +16 m 751.31 Open Concrete Intermediate Bents →751.31.3.2 Column
- 12:3712:37, 15 February 2017 diff hist 0 m 751.31 Open Concrete Intermediate Bents →751.31.3.2 Column
- 12:3612:36, 15 February 2017 diff hist 0 N File:751.31 part elev.jpg No edit summary current
- 12:3612:36, 15 February 2017 diff hist +831 751.31 Open Concrete Intermediate Bents →751.31.3 Reinforcement: Per BR, expanded the use of epoxy coated reinforcement in bridge structures
- 12:2112:21, 15 February 2017 diff hist +240 751.24 Retaining Walls Per BR, expanded the use of epoxy coated reinforcement in bridge structures
- 12:1712:17, 15 February 2017 diff hist −335 751.10 General Superstructure →751.10.1.8 Epoxy Coated Reinforcement: Per BR, expanded the use of epoxy coated reinforcement in bridge structures
- 12:1612:16, 15 February 2017 diff hist −199 751.8 Concrete Box Culverts →751.8.1.1 Material Properties: Per BR, expanded the use of epoxy coated reinforcement in bridge structures
- 12:1112:11, 15 February 2017 diff hist +2,007 751.5 Structural Detailing Guidelines →751.5.9.2 Reinforcing Steel: Per BR, expanded the use of epoxy coated reinforcement in bridge structures
- 11:4911:49, 15 February 2017 diff hist −64 902.4 Design Features of Traffic Control Signals (MUTCD Chapter 4D) →902.5.8.3.1 Preventive Maintenance
- 11:4711:47, 15 February 2017 diff hist +1,079 902.4 Design Features of Traffic Control Signals (MUTCD Chapter 4D) →902.5.8.3 Signal Maintenance: Per TS, updated signal related preventive maintenance & inspection processes.
- 11:2911:29, 15 February 2017 diff hist −1,459 902.4 Signal Installations and Equipment Per TS, updated signal related preventive maintenance & inspection processes. Cycle of controller & cabinet replacement lengthened from 15 years to 20; LED signal indications replacement extended
- 11:1111:11, 15 February 2017 diff hist 0 N File:127.29.8 map 2017.jpg No edit summary current
- 11:1111:11, 15 February 2017 diff hist +4,039 127.29 Stormwater Per Env'l, new permit language and corresponding requirements. Also adds to the public involvement process as required to allow input on new permits.