User contributions
Jump to navigation
Jump to search
- 12:58, 20 March 2017 diff hist -250 m Main Page EPG 616.1
- 12:42, 20 March 2017 diff hist +55 m 606.1 Guardrail →606.1.3.2 End Terminals, Crash Cushions and Anchors: inserted link
- 11:13, 20 March 2017 diff hist +495 m 606.1 Guardrail →606.1.3.2 End Terminals, Crash Cushions and Anchors: Per EPG, clarified grading limits and associated std plans
- 14:50, 17 March 2017 diff hist +118 m 751.50 Standard Detailing Notes Per BR, std details further revised to accommodate galvanized piling
- 14:39, 17 March 2017 diff hist +2,609 m 751.50 Standard Detailing Notes →G5. 20" and 24" CIP Piles: Per BR, renamed "CIP Concrete Piles (Notes for Bridge Standard Drawings" and expanded to accommodate galvanized piling
- 12:57, 17 March 2017 diff hist -9 m Other Aspects of Pavement Design →Shoulder Surface: Per EPG, guidance involving "should" and interstates was futher clarified
- 10:12, 17 March 2017 diff hist 0 m Category:101 Standard Forms →Bridge
- 10:10, 17 March 2017 diff hist 0 N File:101 No Rise Certificate 2017.pdf
- 10:10, 17 March 2017 diff hist 0 N File:101 Floodplain Development Permit Application 2017.pdf current
- 10:09, 17 March 2017 diff hist -4 m Category:101 Standard Forms →Bridge: Per BR, updated “Floodplain Development Permit/Application” and “No-Rise Certificate” by correcting title for SEMA contact and adding digital signatures and seal blocks
- 09:51, 17 March 2017 diff hist +75 m Main Page EPG 616.14.10
- 09:42, 17 March 2017 diff hist +10 m Category:Safe and Sound updated link
- 09:41, 17 March 2017 diff hist +10 m Category:105 Control of Work updated link
- 09:40, 17 March 2017 diff hist 0 N File:616.14.10 TMP.pdf current
- 09:39, 17 March 2017 diff hist +1,591 m 616.14 Work Zone Safety and Mobility Policy Per DE Liaison, clarified existing expectations for WZ Transportation Management Plan
- 08:26, 17 March 2017 diff hist -21 m Category:110 State and Federal Wage Rates and Other Requirements →Required Notices and Posters: Per ECR, updated links to four posters
- 07:24, 17 March 2017 diff hist -62 m Main Page EPG 751.50
- 07:19, 17 March 2017 diff hist +389 m 751.50 Standard Detailing Notes →H11. Miscellaneous: Per BR, it is not required for AASHTO’s design live load for ornamental pedestrian fencing to be applied simultaneously
- 13:32, 16 March 2017 diff hist -253 m Main Page EPG 236.16.9
- 13:18, 16 March 2017 diff hist -487 m 236.16 Outdoor Advertising →236.16.9 Maintenance and Repair of Outdoor Advertising: Per RW, revised process for sending ODA courtesy letter
- 11:19, 16 March 2017 diff hist 0 N File:751.1.2.19 Guidance 2016 June.xlsx
- 11:11, 16 March 2017 diff hist +4 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 11:07, 16 March 2017 diff hist -47 m 751.1 Preliminary Design →751.1.2.19.3 Required Documents: Per BR, updated Foundation Report due date
- 10:30, 16 March 2017 diff hist +22 m Other Aspects of Pavement Design →Shoulder Surface: Per DE, minor clarification for Type A3 shoulder use
- 09:18, 16 March 2017 diff hist 0 N File:616.14 WZ Questions 2017.docx current
- 09:17, 16 March 2017 diff hist 0 m 616.14 Work Zone Safety and Mobility Policy Minor updates to Work Zone Questions for the Core Team
- 08:38, 16 March 2017 diff hist +307 m Main Page EPG 903.18
- 08:16, 16 March 2017 diff hist 0 N File:903 18 4.pdf current
- 08:15, 16 March 2017 diff hist 0 N File:903 18 2.pdf current
- 08:15, 16 March 2017 diff hist +795 m 903.17 Delineation and Object Markers Per TS, clarified Object Marker usage policy including figures showing standard installation details.
- 07:23, 16 March 2017 diff hist 0 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 07:21, 16 March 2017 diff hist 0 N File:751.50 Layer 2.jpg current
- 07:21, 16 March 2017 diff hist +29 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 07:20, 16 March 2017 diff hist 0 N File:751.50 Layer 1.jpg current
- 07:19, 16 March 2017 diff hist +28 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 07:13, 16 March 2017 diff hist +105 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 15:22, 15 March 2017 diff hist +119 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 15:14, 15 March 2017 diff hist 0 N File:751.50 ksf.jpg current
- 15:14, 15 March 2017 diff hist 0 N File:751.50 ftlb.jpg current
- 15:14, 15 March 2017 diff hist +61 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 15:10, 15 March 2017 diff hist 0 N File:751.50 kip.jpg current
- 15:10, 15 March 2017 diff hist -150 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 15:02, 15 March 2017 diff hist 0 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 15:00, 15 March 2017 diff hist 0 N File:751.50 ft.jpg current
- 15:00, 15 March 2017 diff hist -89 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 14:58, 15 March 2017 diff hist +5 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 14:57, 15 March 2017 diff hist 0 N File:751.50 ea.jpg current
- 14:57, 15 March 2017 diff hist -454 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 14:04, 15 March 2017 diff hist +1,417 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 13:39, 15 March 2017 diff hist +83 m 751.1 Preliminary Design →751.1.2.31 Finishing Up Design Layout