User contributions
Jump to navigation
Jump to search
- 10:10, 15 June 2017 diff hist 0 N File:620 Durable.doc current
- 10:10, 15 June 2017 diff hist +321 Category:620 Pavement Marking Per TS, updated guidance to reflect new materials available and updated retroreflectivity requirements for acceptance.
- 08:34, 15 June 2017 diff hist +3,710 m Category:747 Bridge Reports and Layouts →747.1.6.2 Mechanically Stabilized Earth (MSE) Wall Systems: Per BR, division responsibilities for preparing MSE wall plans, computing excavation quantities and locations added
- 15:22, 14 June 2017 diff hist -2 m Main Page
- 13:56, 9 June 2017 diff hist -58 m Main Page EPG 402, EPG 450, EPG 751.24, EPG 760
- 12:48, 9 June 2017 diff hist 0 N File:760.4.2 FAQ 2017.docx current
- 12:48, 9 June 2017 diff hist +5 m Category:760 General Construction Inspection for Structures
- 12:47, 9 June 2017 diff hist +5 m Category:760 General Construction Inspection for Structures Per TP, also updated FAQ document
- 12:37, 9 June 2017 diff hist +1,465 Category:760 General Construction Inspection for Structures →760.4 Vertical Clearance: Per TP, expanded and clarified guidance for the measurement and reporting of vertical clearance.
- 11:36, 9 June 2017 diff hist +137 751.24 Retaining Walls →751.24.2.1 Design: Per BR, the types of pipes permitted as pipe pile spacers behind MSE walls for driving piling during bridge construction were expanded.
- 11:29, 9 June 2017 diff hist -94 751.6 General Quantities →751.6.1 Index of Quantities: Per BR, the types of pipes permitted as pipe pile spacers behind MSE walls for driving piling during bridge construction were expanded.
- 11:20, 9 June 2017 diff hist +446 Category:450 Bituminous Pavement Design →450.3 Layer Design: Per CM, guidance has been expanded to provide suggested additional quantities amounts for addressing the surface irregularities of existing pavement.
- 11:15, 9 June 2017 diff hist +1,745 Category:402 Bituminous Surface Leveling →402.1.2 Mix and Quantities: Per CM, guidance has been expanded to provide suggested additional quantities amounts for addressing the surface irregularities of existing pavement.
- 10:17, 9 June 2017 diff hist +436 m LPA:136.13 LPA Policy Changes EPG 136.6.4.9
- 10:15, 9 June 2017 diff hist 0 m LPA:136.6 Environmental and Cultural Requirements →136.6.4.9 Borrow Sites and Other Land Disturbance Activities Outside Right of Way
- 10:12, 9 June 2017 diff hist +140 m LPA:136.6 Environmental and Cultural Requirements →136.6.4.9 Borrow Sites and Other Land Disturbance Activities Outside Right of Way: Per Hist. Pres., guidance for env'l clearance help clarified
- 13:45, 8 June 2017 diff hist -282 m Main Page EPG 751.50
- 13:29, 8 June 2017 diff hist +89 m 751.50 Standard Detailing Notes
- 12:33, 8 June 2017 diff hist +1,386 m 751.50 Standard Detailing Notes Per BR, added Redeck Standard Notes and made minor revisions to Notes B3.32 and B3.33.
- 10:51, 8 June 2017 diff hist +101 m Main Page
- 10:48, 8 June 2017 diff hist +129 m Main Page EPG 134
- 10:42, 8 June 2017 diff hist -2 m Category:101 Standard Forms Per LPA, updated Submittal to Professional Services Committee
- 10:41, 8 June 2017 diff hist 0 N File:134.3.1 2017.doc current
- 10:41, 8 June 2017 diff hist 0 N File:134.2.4 2017.doc current
- 10:41, 8 June 2017 diff hist 0 m Category:134 Engineering Professional Services
- 10:40, 8 June 2017 diff hist 0 Category:134 Engineering Professional Services →134.1.3 Consultant Qualification
- 10:38, 8 June 2017 diff hist 0 N File:134.2.2.2 June 2017.docx current
- 10:38, 8 June 2017 diff hist 0 N File:134.2.2 2017.doc current
- 10:37, 8 June 2017 diff hist +6,789 m Category:134 Engineering Professional Services Per LPA, revised guidance for eAgreement (electronic vs wet signatures) workflow changes and to incorporate more-than-Taking Care of the System (TSCO) planning studies.
- 13:49, 7 June 2017 diff hist +13 m Main Page
- 13:31, 7 June 2017 diff hist -5 m Main Page EPG 903.15.3
- 12:13, 7 June 2017 diff hist +329 m 903.14 Memorial Signs →903.15.3 Heroes Way Interchange Program: Per TS, updated guidance to reflect current practice.
- 08:39, 7 June 2017 diff hist 0 N File:Main Page June 7, 2017.jpg current
- 08:39, 7 June 2017 diff hist -106 m Main Page
- 07:22, 7 June 2017 diff hist 0 N File:101 Workforce Pilot Program Employee Notification.pdf current
- 07:21, 7 June 2017 diff hist 0 N File:101 Sample Company Workforce Diversity Job Special Provision Action Plan.docx current
- 07:21, 7 June 2017 diff hist 0 N File:101 Contractor's Monthly New Employee Report.pdf current
- 07:21, 7 June 2017 diff hist -4 m Category:101 Standard Forms →External Civil Rights
- 07:20, 7 June 2017 diff hist +403 m Category:101 Standard Forms Three new forms from ECR
- 10:02, 6 June 2017 diff hist +296 m Category:900 TRAFFIC CONTROL
- 09:59, 6 June 2017 diff hist +300 m Category:1000 MATERIALS
- 09:57, 6 June 2017 diff hist +300 m Category:800 ROADSIDE DEVELOPMENT
- 09:54, 6 June 2017 diff hist +298 m Category:109 Measurement and Payment
- 09:53, 6 June 2017 diff hist +298 m Category:105 Control of Work
- 09:52, 6 June 2017 diff hist +301 m Category:101 Standard Forms
- 14:33, 5 June 2017 diff hist 0 m Main Page
- 09:27, 5 June 2017 diff hist -153 m Category:235 Preliminary Plans →235.2.3 Municipal Agreements (DE11) and County Agreements (DE10): Per DE, updated language to current Agreements Review Group's process for reviewing DE10 and DE11
- 09:25, 5 June 2017 diff hist -346 m 153.9 Design Per DE, updated language to EPG 153.8 DE Table and EPG 235.2.3 to current Agreements Review Group process for reviewing DE10 and DE11.
- 13:06, 2 June 2017 diff hist -5 m LPA:136.4 Consultant Selection and Consultant Contract Management updated broken 23 CFR 172.3 link
- 12:21, 2 June 2017 diff hist +8 m 103.1 Bid Opening and Award Process Per DE, the Bidding and Contract Group further clarified that Permitted Combination of Projects for lettings is no longer allowed.