User contributions
Jump to navigation
Jump to search
- 10:51, 24 January 2018 diff hist +181 m 147.3 Job Order Contracting (JOC) →147.3.5 Term Extension of Job Order Contracts: Per CM, updated the 5th bullet pt. CCO requested that CM no longer submit hard copies of the new performance bond, but send them email links
- 08:14, 22 January 2018 diff hist +3 m 171.12 Maintenance Policy History →DRN(A4) Plastic Pipe
- 14:24, 19 January 2018 diff hist 0 m Category:702 Load-Bearing Piles →702.1.4.4 DFI Documents on Pile Driving and Hammers
- 14:20, 19 January 2018 diff hist 0 N File:103.1.6 Reviewers Checklist.docx current
- 14:19, 19 January 2018 diff hist -152 m 103.1 Bid Opening and Award Process Per Bidding and Est, replaced Reviewer's Checklist link with an uploaded form
- 11:30, 19 January 2018 diff hist -51 m LPA:136.13 LPA Policy Changes
- 11:24, 19 January 2018 diff hist -4 m LPA:136.13 LPA Policy Changes minor cosmetic update to Fig. 136.9.3
- 11:24, 19 January 2018 diff hist -4 m LPA:136.12 Figures, Glossary and Other Useful Links minor cosmetic update to Fig. 136.9.3
- 11:23, 19 January 2018 diff hist 0 N File:136.9.3 2018.docx
- 11:23, 19 January 2018 diff hist -28 m LPA:136.9 Plans, Specs and Estimates (PSE) minor cosmetic update to Fig. 136.9.3
- 12:22, 18 January 2018 diff hist 0 N File:101 Floodplain Development Permit Application 2018.pdf current
- 12:22, 18 January 2018 diff hist -7 m Category:101 Standard Forms →Bridge: Per BR, updated “Floodplain Development Permit/Application” form with minor changes made at the request of SEMA.
- 11:54, 18 January 2018 diff hist +75 m Main Page EPG 106.3.2.87, EPG 402
- 10:31, 18 January 2018 diff hist +5 m 147.3 Job Order Contracting (JOC) Per EPS, updated Fence JOC link
- 09:53, 18 January 2018 diff hist +5 m Category:625 Slab Stabilization Per CM, revised "Guidance for Asphalt Cement Price Index Adjustments" to include info about contingent item work.
- 09:53, 18 January 2018 diff hist +5 m Category:409 Seal Coat Per CM, revised "Guidance for Asphalt Cement Price Index Adjustments" to include info about contingent item work.
- 09:53, 18 January 2018 diff hist +5 m Category:402 Bituminous Surface Leveling Per CM, revised "Guidance for Asphalt Cement Price Index Adjustments" to include info about contingent item work.
- 09:52, 18 January 2018 diff hist +5 m Category:401 Bituminous Base and Pavement Per CM, revised "Guidance for Asphalt Cement Price Index Adjustments" to include info about contingent item work.
- 09:52, 18 January 2018 diff hist 0 N File:403 Guidance for Asphalt Cement Price Index Adjustments 2018.docx current
- 09:51, 18 January 2018 diff hist +5 m Category:403 Asphaltic Concrete Pavement Per CM, revised "Guidance for Asphalt Cement Price Index Adjustments" to include info about contingent item work.
- 08:56, 18 January 2018 diff hist +1,259 Nm 106.3.2.87 TM-87 No-Pick-Up Time for Tack Coats Per CM, new TM for determining no pick-up-time for tack coat
- 11:51, 17 January 2018 diff hist +160 m Main Page EPG 236.3
- 11:27, 17 January 2018 diff hist +1,311 m 236.3 Administration →236.3.4 Right of Way Acquisition Authority and Project Funding: Per RW, to align w/ CFR reg, updated RW activities that can be coded to the PE number prior to receiving FHWA's "A" date approval
- 10:28, 17 January 2018 diff hist -9 m 806.8 Storm Water Pollution Prevention Plan (SWPPP) →806.8.1 Introduction to the Storm Water Permit and Storm Water Polution Prevention Plan (SWPPP): Per CADD, updated a link to EPA
- 10:16, 17 January 2018 diff hist 0 N File:606.1.3.1 Guardrail Length of Need Calculator 2018.xlsx
- 10:15, 17 January 2018 diff hist -8 m 606.1 Guardrail Per Charles Schumann, minor revision to guardrail calculator spreadsheet (added links to MoDOT approved MASH crashworthy end terminals and MoDOT locations for greater convenience for the user)
- 13:21, 16 January 2018 diff hist -1 m 236.3 Administration →236.3.4.1 General
- 14:43, 12 January 2018 diff hist -2,346 m Category:1037 Sheer Connectors current
- 14:37, 12 January 2018 diff hist 0 Category:1000 MATERIALS Title of EPG 1037 corrected to "Shear" from "Sheer".
- 14:37, 12 January 2018 diff hist +2,687 Nm Category:1037 Shear Connectors Title of EPG 1037 corrected to "Shear" from "Sheer". Old article had 8911 hits and only a few minor corrections from its original incorporation into EPG from Materials Manual in July 2007
- 09:24, 11 January 2018 diff hist 0 N File:910.3.2.13.2.jpg current
- 09:24, 11 January 2018 diff hist +71 m 910.3 Dynamic Message Signs (DMS) →910.3.2.13.2 Other Weather Messages
- 15:38, 10 January 2018 diff hist -4 m Main Page EPG 104.7
- 15:02, 10 January 2018 diff hist +1 m 104.7 Scoping Estimates
- 15:01, 10 January 2018 diff hist +1 m 104.7 Scoping Estimates
- 15:01, 10 January 2018 diff hist 0 N File:104.7 EngFac SFY 15 to 17.pdf current
- 15:01, 10 January 2018 diff hist -119 m 104.7 Scoping Estimates Per TP, updated Engineering Factors Report to SFY 2015 - 2017
- 10:47, 10 January 2018 diff hist +32 m 147.3 Job Order Contracting (JOC) Per EPG, upated JOC JSP links
- 11:58, 9 January 2018 diff hist +622 m 153.9 Design Per DE, added info for DE63
- 10:42, 9 January 2018 diff hist +27 m 102.2 Contractor Performance Rating System Per CM, updated link to Contractor Performance Questionnaire
- 08:51, 4 January 2018 diff hist 0 m Help Article →EPG Ballot Cycles
- 15:41, 3 January 2018 diff hist +1 m Other Aspects of Pavement Design →Minor Roads
- 14:35, 3 January 2018 diff hist +49 m Category:134 Engineering Professional Services updated link
- 14:25, 3 January 2018 diff hist +1 m 237.14 Electronic Design Data Delivery (BIM Deliverables) →237.14.1 Specifications of Electronic Design of Contract Plans for Automated Machine Guidance (AMG): minor correction
- 09:31, 2 January 2018 diff hist +1 m Main Page
- 09:55, 29 December 2017 diff hist 0 N File:Main Page Dec 29, 2017.jpg current
- 09:54, 29 December 2017 diff hist +72 m Main Page
- 08:34, 29 December 2017 diff hist +360 m Category:110 State and Federal Wage Rates and Other Requirements →110.1 Wage Rates (Guidance for Sec 110.1): Per CM, link added for payroll training course
- 08:17, 29 December 2017 diff hist 0 N File:616.14 WZ Questions Dec 2017.docx current
- 08:16, 29 December 2017 diff hist +12 m 616.14 Work Zone Safety and Mobility Policy Per EPServices, updated Work Zone Questions for the Core Team