User contributions for EPGsysop
Jump to navigation
Jump to search
9 March 2018
- 10:4210:42, 9 March 2018 diff hist +410 m 751.1 Preliminary Design →751.1.2.21 Substructure Type: Per BR, min galvanized penetration guidance added for retaining wall piles supported on piles & bridge end bents on piles with embankments supported by MSE walls
8 March 2018
- 15:1215:12, 8 March 2018 diff hist 0 m 127.16 Wetland and Stream Mitigation No edit summary
- 14:5414:54, 8 March 2018 diff hist +125 m Main Page No edit summary
- 14:3214:32, 8 March 2018 diff hist −10 m Category:101 Standard Forms →Utility or Right of Way Related: Updated link to Permit for Work on Right of Way
- 13:5213:52, 8 March 2018 diff hist +3 m Main Page No edit summary
- 12:5812:58, 8 March 2018 diff hist −6 m Category:612 Impact Attenuators →612.1.3 MoDOT Protective Vehicle/TMA Guidelines
- 12:4612:46, 8 March 2018 diff hist −103 m Category:101 Standard Forms Per ECR and CM, deleted archaic Spanish version of the Wage Interview Form (CR-1)
- 12:4512:45, 8 March 2018 diff hist −110 m Category:110 State and Federal Wage Rates and Other Requirements Per ECR and CM, deleted archaic Spanish version of the Wage Interview Form (CR-1)
- 11:3911:39, 8 March 2018 diff hist +51 m Main Page EPG 612, EPG 616.8
- 11:1011:10, 8 March 2018 diff hist 0 N File:616.8.35d MT 2018.pdf No edit summary current
- 11:1011:10, 8 March 2018 diff hist 0 N File:616.8.35c MT 2018.pdf No edit summary current
- 11:1011:10, 8 March 2018 diff hist 0 N File:616.8.35b MT 2018.pdf No edit summary current
- 11:1011:10, 8 March 2018 diff hist 0 N File:616.8.35a MT 2018.pdf No edit summary current
- 11:0911:09, 8 March 2018 diff hist 0 N File:616.8.35 MT 2018.pdf No edit summary current
- 11:0911:09, 8 March 2018 diff hist +25 m 616.8 Typical Applications (MUTCD 6H) Per TS, the TMA Light Bar is now temporarily optional and not required to be purchased for use. TA 35 MT and TAs 35a-d MT
- 10:4910:49, 8 March 2018 diff hist +228 m Category:612 Impact Attenuators →612.1.3 MoDOT Protective Vehicle/TMA Guidelines: Per TS, the TMA Light Bar is now temporarily optional and not required to be purchased for use.
7 March 2018
- 15:2715:27, 7 March 2018 diff hist −70 m 127.25 Maintenance Environmental Policies →127.25.2.2 MoDOT Hazardous Material Spills: Per Env'l, updated link
- 15:2215:22, 7 March 2018 diff hist +49 m 127.25 Maintenance Environmental Policies →127.25.2.2 MoDOT Hazardous Material Spills: Per Env'l, updated link
- 15:1415:14, 7 March 2018 diff hist +198 m 751.12 Barriers, Railings, Curbs and Fences →751.12.4 Chain Link Fence: Per BR, clarified wind load and dead load for chain link fence.
5 March 2018
- 15:0615:06, 5 March 2018 diff hist +766 m Category:1040 Guardrail, End Terminals, One-Strand Access Restraint Cable and Guard Cable Material →Table 1040.2.1.1 List of Prequalified Guardrail Fabricators Brand Registration and Guarantee on File: Per CM, added manufacturer
2 March 2018
- 14:2014:20, 2 March 2018 diff hist +430 m 153.13 Highway Safety Per HS, added HS07 agreement
- 13:4713:47, 2 March 2018 diff hist 0 m 237.13 Contract Plan File Name Convention →237.13.2 Electronic Design Data: Per CADD, corrected file naming convention
- 10:5510:55, 2 March 2018 diff hist −242 m Category:702 Load-Bearing Piles Per CM, most recent revision deleted since it was deemed incorrect
- 10:5010:50, 2 March 2018 diff hist 0 N File:702.pdf No edit summary current
- 10:5010:50, 2 March 2018 diff hist +12 m Category:702 Load-Bearing Piles →702.1.5 Pile Driving Documentation
- 10:4710:47, 2 March 2018 diff hist +242 m Category:702 Load-Bearing Piles →702.1.5 Pile Driving Documentation: Per BR, clarified that reporting of PDA data is not required when piles are driven to rock.
- 10:3810:38, 2 March 2018 diff hist +4 m 750.7 Non-Hydraulic Considerations →750.7.2.3 Roadways and Roadside Applications with ADT < 1700
- 10:3510:35, 2 March 2018 diff hist +53 m 750.7 Non-Hydraulic Considerations →750.7.2.3 Roadways and Roadside Applications with ADT < 1700
- 10:3310:33, 2 March 2018 diff hist +9 m Category:941 Permits and Access Requests →941.6.3.7 Construction Inspection
- 10:2810:28, 2 March 2018 diff hist 0 N File:730.3.jpg No edit summary current
- 09:5609:56, 2 March 2018 diff hist 0 m Category:732 Flared End Sections →732.1 Installation: Corrected link
- 09:3109:31, 2 March 2018 diff hist −2 m Main Page No edit summary
1 March 2018
- 09:0609:06, 1 March 2018 diff hist +3 m 616.18 Construction Inspection Guidelines for Sec 616 →Flagger Requirements (for Sec 616.4.3): Updated sign no. for PLEASE WAIT FOR PILOT CAR to G20-4a
- 09:0409:04, 1 March 2018 diff hist −2 m 616.3 Temporary Traffic Control Elements (MUTCD Chapter 6C) →616.3.13 Pilot Car Method of One-Lane, Two-Way Traffic Control (MUTCD 6C.13)
- 09:0009:00, 1 March 2018 diff hist +17 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →Table 616.6.58: Updated sign no. for PLEASE WAIT FOR PILOT CAR to G20-4a
28 February 2018
- 07:5607:56, 28 February 2018 diff hist −664 m 153.16 Maintenance Per TS, MT and Comm Secr, TR57 replaced MT27
27 February 2018
- 14:4614:46, 27 February 2018 diff hist +7 m 751.24 Retaining Walls →751.24.2.1 Design: Per BR, minor clarifications
- 11:0211:02, 27 February 2018 diff hist −239 m Main Page EPG 450
- 10:5610:56, 27 February 2018 diff hist 0 N File:450 Estimate Factors 2018.doc No edit summary current
- 10:5610:56, 27 February 2018 diff hist +10 m Category:450 Bituminous Pavement Design Per EPS, updated Tack Coat estimate factors
- 10:3610:36, 27 February 2018 diff hist 0 N File:Main Page Feb 27, 2018.jpg No edit summary current
- 10:3510:35, 27 February 2018 diff hist +126 m Main Page No edit summary
- 10:1610:16, 27 February 2018 diff hist 0 m 901.7 Light Source and Intensity →901.7.2 Average Maintained Intensity
- 10:0110:01, 27 February 2018 diff hist −100 m 901.7 Light Source and Intensity →901.7.2 Average Maintained Intensity: Per EPS, updated link
- 09:2709:27, 27 February 2018 diff hist +1,031 m 153.21 Traffic Per TS, added three new agreements (TR55, TR56, TR57)
26 February 2018
- 14:0114:01, 26 February 2018 diff hist −203 m 238.2 Land Surveying →238.2.8 Survey Property Damage: Per RW, removed reference to archaic RW11 agreement
- 13:5113:51, 26 February 2018 diff hist +1 m 751.24 Retaining Walls →751.24.2.1 Design
- 12:4712:47, 26 February 2018 diff hist 0 m 751.24 Retaining Walls →751.24.2.1 Design: Per Br, minor cosmetic clarification
- 11:0811:08, 26 February 2018 diff hist +35 m Category:110 State and Federal Wage Rates and Other Requirements Per CM, updated links
23 February 2018
- 12:3612:36, 23 February 2018 diff hist −714 m 236.14 Change in Route Status Report →236.14.6 Roadway Relinquishment Agreement: Per RW, removed outdated forms and references to the forms (RW5, RW6, RW19, RW32)