User contributions for Smithk
Jump to navigation
Jump to search
1 October 2019
- 07:5407:54, 1 October 2019 diff hist +76 m LPA:136.12 Figures, Glossary and Other Useful Links Form 136.8.8
- 07:5307:53, 1 October 2019 diff hist +152 m LPA:136.8 Local Public Agency Land Acquisition updated link for Form 136.8.8
30 September 2019
- 12:1912:19, 30 September 2019 diff hist +572 m Category:505 Bridge Deck Concrete Wearing Surface →505.1.3 Silica Fume Concrete (for Sec 505.30): Per CM, new guidance for Polyester Polymer Concrete Overlay
- 09:0809:08, 30 September 2019 diff hist 0 m Help Article →EPG Ballot Cycles
27 September 2019
- 14:3914:39, 27 September 2019 diff hist +42 m Category:129 Public Involvement updated Design links
- 13:0213:02, 27 September 2019 diff hist 0 N File:136.8.8a.docx No edit summary current
- 13:0213:02, 27 September 2019 diff hist +135 m LPA:136.8 Local Public Agency Land Acquisition Per RW, Form 136.8.8 was updated to detail parcel acquisition and responsibility as well as expenditure detail. New Form 136.8.8a is a simple chart to compute these required details for Form 136.8.8.
- 12:4812:48, 27 September 2019 diff hist +134 m LPA:136.12 Figures, Glossary and Other Useful Links Per RW, updated Form 136.8.8; new Form 136.8.8a
- 12:4612:46, 27 September 2019 diff hist 0 N File:136.8.8 2019.docx No edit summary current
- 12:4512:45, 27 September 2019 diff hist +5 m LPA:136.12 Figures, Glossary and Other Useful Links No edit summary
26 September 2019
- 09:4909:49, 26 September 2019 diff hist +90 m Main Page EPG 109.12.5
- 09:1909:19, 26 September 2019 diff hist +1,544 m Category:109 Measurement and Payment →109.12.5 Change Order Time Extension for Extreme Events: Per CM, new guidance allows the State CM Engineer the latitude to grant time extensions for extreme events. This guidance reflects what CM has long been doing in these circumstances.
25 September 2019
- 14:2914:29, 25 September 2019 diff hist 0 File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 4) Post Stiffener.gif Smithk uploaded a new version of File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 4) Post Stiffener.gif current
- 14:2714:27, 25 September 2019 diff hist 0 File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 4) Post Plate Washer.gif Smithk uploaded a new version of File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 4) Post Plate Washer.gif current
- 14:2514:25, 25 September 2019 diff hist 0 File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 4) Plan of Bent Plate.gif Smithk uploaded a new version of File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 4) Plan of Bent Plate.gif current
- 14:2214:22, 25 September 2019 diff hist 0 File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 4) Part Section.gif Smithk uploaded a new version of File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 4) Part Section.gif current
- 14:2014:20, 25 September 2019 diff hist 0 File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 4) Part Section Thru Plate.gif Smithk uploaded a new version of File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 4) Part Section Thru Plate.gif current
- 14:1814:18, 25 September 2019 diff hist 0 File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 4) Optional Tie Connection.gif Smithk uploaded a new version of File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 4) Optional Tie Connection.gif current
- 14:1514:15, 25 September 2019 diff hist 0 File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 4) Details of Post.gif Smithk uploaded a new version of File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 4) Details of Post.gif current
- 11:2911:29, 25 September 2019 diff hist 0 File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 3) Top View.gif Smithk uploaded a new version of File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 3) Top View.gif current
- 11:2611:26, 25 September 2019 diff hist 0 File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 3) Section AA.gif Smithk uploaded a new version of File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 3) Section AA.gif current
- 11:2211:22, 25 September 2019 diff hist 0 File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 3) Post Stiffener.gif Smithk uploaded a new version of File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 3) Post Stiffener.gif current
- 11:1911:19, 25 September 2019 diff hist 0 File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 3) Post Plate Washer.gif Smithk uploaded a new version of File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 3) Post Plate Washer.gif current
- 10:5810:58, 25 September 2019 diff hist +18 m Category:100 GENERAL →100.1.1 MoDOT Organization
- 10:1010:10, 25 September 2019 diff hist 0 File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 3) Part Section.gif Smithk uploaded a new version of File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 3) Part Section.gif current
- 10:0710:07, 25 September 2019 diff hist 0 File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 3) Details of Post.gif Smithk uploaded a new version of File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 3) Details of Post.gif current
- 10:0410:04, 25 September 2019 diff hist 0 File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 3) Detail B.gif Smithk uploaded a new version of File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 3) Detail B.gif current
- 09:5109:51, 25 September 2019 diff hist 0 File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 3) .5 in Plate.gif Smithk uploaded a new version of File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 3) .5 in Plate.gif current
- 09:4509:45, 25 September 2019 diff hist 0 File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 2) Section DD.gif Smithk uploaded a new version of File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 2) Section DD.gif current
- 09:2909:29, 25 September 2019 diff hist 0 File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 2) Section CC.gif Smithk uploaded a new version of File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 2) Section CC.gif current
- 09:2009:20, 25 September 2019 diff hist 0 File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 2) Section AA.gif Smithk uploaded a new version of File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 2) Section AA.gif current
- 09:0709:07, 25 September 2019 diff hist 0 File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 2) Part Section.gif Smithk uploaded a new version of File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 2) Part Section.gif current
- 09:0009:00, 25 September 2019 diff hist 0 File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 2) Part Elevation 2.gif Smithk uploaded a new version of File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 2) Part Elevation 2.gif current
- 08:4908:49, 25 September 2019 diff hist 0 File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 2) Part Elevation 1.gif Smithk uploaded a new version of File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 2) Part Elevation 1.gif current
- 08:4108:41, 25 September 2019 diff hist 0 File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 2) Details of Post.gif Smithk uploaded a new version of File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 2) Details of Post.gif current
- 08:3608:36, 25 September 2019 diff hist 0 File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 2) Detail B.gif Smithk uploaded a new version of File:751.40 Replacement of Existing Curb with Thrie Beam Rail (System 2) Detail B.gif current
- 08:2908:29, 25 September 2019 diff hist 0 File:751.40 Replacement of Existing Curb with Thrie Beam Rail (Optional System 4) Part Section.gif Smithk uploaded a new version of File:751.40 Replacement of Existing Curb with Thrie Beam Rail (Optional System 4) Part Section.gif current
- 08:1308:13, 25 September 2019 diff hist 0 File:751.40 Replacement of Existing Curb at End of Wing (Non-Integral End Bents) Anchor Systems at Sec.gif Smithk uploaded a new version of File:751.40 Replacement of Existing Curb at End of Wing (Non-Integral End Bents) Anchor Systems at Sec.gif current
24 September 2019
- 14:5614:56, 24 September 2019 diff hist −16 m Help Article →Division Contacts
- 14:1614:16, 24 September 2019 diff hist 0 File:751.40 Replacement of Existing Curb at End of Wing (Integral End Bents) Anchor Systems at Section.gif Smithk uploaded a new version of File:751.40 Replacement of Existing Curb at End of Wing (Integral End Bents) Anchor Systems at Section.gif current
- 13:5413:54, 24 September 2019 diff hist 0 File:751.40 Replacement of Existing Curb (Safety Barrier Curb on Wing) Section Thru Curb Optional Anch.gif Smithk uploaded a new version of File:751.40 Replacement of Existing Curb (Safety Barrier Curb on Wing) Section Thru Curb Optional Anch.gif current
- 13:5013:50, 24 September 2019 diff hist 0 File:751.40 Replacement of Existing Curb (Safety Barrier Curb on Slab) Section Thru Curb Optional Anch.gif Smithk uploaded a new version of File:751.40 Replacement of Existing Curb (Safety Barrier Curb on Slab) Section Thru Curb Optional Anch.gif current
- 12:0912:09, 24 September 2019 diff hist +40 m 153.21 Traffic Per TS, updated the reviewer info for the TR50 agreement
23 September 2019
- 15:2315:23, 23 September 2019 diff hist 0 File:751.40 reinforcement- Development and Tension Lap Splice Lengths - Other Than Top Bars (Fy = 60 .gif Smithk uploaded a new version of File:751.40 reinforcement- Development and Tension Lap Splice Lengths - Other Than Top Bars (Fy = 60 .gif current
- 10:5810:58, 23 September 2019 diff hist −32 m 153.21 Traffic Per TS, updated point of contact for the TR50 agreement
- 09:4909:49, 23 September 2019 diff hist −2 m Category:754 Bridge Engineering Assistance Program (BEAP) No edit summary current
- 09:1809:18, 23 September 2019 diff hist −17 m Help Article →Division Contacts
20 September 2019
- 13:4813:48, 20 September 2019 diff hist 0 File:751.40 prestressed concrete i-girders-miscellaneous details-exp device support holes part elevati.gif Smithk uploaded a new version of File:751.40 prestressed concrete i-girders-miscellaneous details-exp device support holes part elevati.gif current
- 13:0313:03, 20 September 2019 diff hist +137 m Category:101 Standard Forms →AASHTOWare Project Quick Reference Guides (QRGs): Per CM, new QRG, AWP MA Sample Record General IAS Audit Record
19 September 2019
- 12:3112:31, 19 September 2019 diff hist +81 m 236.6 Appraisal and Appraisal Review →236.6.3.1 Standard Appraisal Format: Per RW, updated the USPAP Compliance Statement to conform with our appraisal forms.