User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 15:39, 5 November 2019 diff hist +54 m Category:236 Right of Way Per RW, insisted on adding a link of the "Value Determination Schedule" (which is a chart of fees) to the listing of major types of access.
- 12:26, 5 November 2019 diff hist 0 m 237.9 Submission of Plans and Supporting Documents
- 10:01, 5 November 2019 diff hist 0 File:237.9.3 due dates.pdf Smithk uploaded a new version of File:237.9.3 due dates.pdf current
- 11:42, 4 November 2019 diff hist +13 m Help Article →Division Contacts
- 10:22, 1 November 2019 diff hist -13 m 103.1 Bid Opening and Award Process →103.1.6.1.3 Assembling Job Special Provisions
- 10:14, 1 November 2019 diff hist +14 m 103.1 Bid Opening and Award Process
- 10:07, 1 November 2019 diff hist -8 m 237.9 Submission of Plans and Supporting Documents →237.9.3 PS&E Submittal Guidelines
- 09:29, 1 November 2019 diff hist 0 m Help Article →Division Contacts
- 09:27, 1 November 2019 diff hist +47 m Help Article
- 09:24, 1 November 2019 diff hist +63 m Help Article
- 14:42, 31 October 2019 diff hist +57 m 751.11 Bearings →751.11.2.1 Elastomeric Bearings: Per BR, clarified the maximum allowed taper
- 07:45, 31 October 2019 diff hist +16 m Category:153 Agreements and Contracts
- 07:44, 31 October 2019 diff hist +8 m 236.14 Change in Route Status Report
- 07:43, 31 October 2019 diff hist +16 m 236.4 Description Writing and Titles
- 07:42, 31 October 2019 diff hist +4 m 236.4 Description Writing and Titles
- 07:41, 31 October 2019 diff hist -20 m 236.4 Description Writing and Titles updated link
- 07:39, 31 October 2019 diff hist -8 m 236.14 Change in Route Status Report updated link
- 07:38, 31 October 2019 diff hist +84 m Category:153 Agreements and Contracts Updated link
- 13:35, 29 October 2019 diff hist +1 m LPA:136.3 Federal Aid Basics →136.3.8.10.2 Project Eligibility and Selection
- 13:27, 29 October 2019 diff hist -104 m Category:153 Agreements and Contracts
- 13:22, 29 October 2019 diff hist +26 m Category:153 Agreements and Contracts →153.1 The Agreement Process
- 13:20, 29 October 2019 diff hist +26 m Category:153 Agreements and Contracts →153.1.1 Things to Know Before Beginning the Process
- 12:45, 29 October 2019 diff hist 0 m Category:153 Agreements and Contracts →153.1.1 Things to Know Before Beginning the Process
- 08:50, 29 October 2019 diff hist +2 m 606.2 Guard Cable
- 08:47, 29 October 2019 diff hist +1 m 606.2 Guard Cable
- 15:11, 28 October 2019 diff hist +182 Main Page EPG 236
- 14:48, 28 October 2019 diff hist +139 m 236.6 Appraisal and Appraisal Review →236.6.5.9 Non-Competitive Proposals for Contract Realty Appraisals: Per RW, minor clarifications pertaining to current practices
- 14:29, 28 October 2019 diff hist +143 m 236.5 Property Management →236.5.28.3 Compensation for Changes in Access: Per RW, minor clarifications pertaining to current practices
- 11:29, 25 October 2019 diff hist +175 m Main Page EPG 105.9
- 11:11, 25 October 2019 diff hist +38 m Category:146 Disadvantaged Business Enterprise (DBE) →146.3.3 DBE Trucking Companies: Per CM, updated daily diary and daily work reports links
- 11:08, 25 October 2019 diff hist +35 m Category:113 Construction Inspection Guidance for Contractor's Claims Per CM, updated daily diary link
- 11:02, 25 October 2019 diff hist -266 m Category:109 Measurement and Payment Per CM, revisions allow for the expanded opportunities of the AWP.
- 11:01, 25 October 2019 diff hist -462 m Category:108 Prosecution and Progress Per CM, revisions allow for the expanded opportunities of the AWP.
- 10:59, 25 October 2019 diff hist -468 m Category:105 Control of Work →105.9 Authority and Duties of Resident Engineer (Sec 105.9): Per CM, revisions allow for the expanded opportunities of the AWP.
- 10:25, 25 October 2019 diff hist -36 m 910.4 ITS Architecture Per TS, updated links
- 09:56, 25 October 2019 diff hist +128 m Category:105 Control of Work Per CM, updated daily diary and daily work reports links
- 15:11, 24 October 2019 diff hist -2 m 751.22 Prestressed Concrete I Girders Per BR, updated archaic AASHTO Prestressed Girder code references
- 14:26, 24 October 2019 diff hist -176 m 236.16 Outdoor Advertising Per Outdoor Advertising, updated links
- 09:29, 24 October 2019 diff hist +14 m 751.37 Drilled Shafts →751.37.1.6 General Detail Considerations: Per BR, re-titled
- 09:27, 24 October 2019 diff hist +28 m Main Page
- 09:26, 24 October 2019 diff hist +28 m 751.5 Structural Detailing Guidelines
- 09:24, 24 October 2019 diff hist +15 m 751.38 Spread Footings
- 09:22, 24 October 2019 diff hist +15 m 751.5 Structural Detailing Guidelines
- 08:30, 24 October 2019 diff hist +6 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, updated links
- 13:58, 23 October 2019 diff hist +51 m 751.37 Drilled Shafts →751.37.1.6 General Detail Considerations
- 12:28, 23 October 2019 diff hist -409 m Main Page EPG 751.37.1.6
- 12:10, 23 October 2019 diff hist +131 m 751.5 Structural Detailing Guidelines →751.5.3.3 Intermediate Bents: Per BR, updated links
- 12:05, 23 October 2019 diff hist +36 m 751.37 Drilled Shafts →751.37.1.6 General Detail Considerations
- 12:00, 23 October 2019 diff hist 0 N File:751.37.1.6.jpg current
- 11:33, 23 October 2019 diff hist +44 m 751.37 Drilled Shafts →751.37.1.6 General Detail Considerations