User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 12:45, 15 May 2020 diff hist +42 m Recent Policy Changes in the EPG EPG 616.6.2.2
- 11:35, 15 May 2020 diff hist 0 N File:616.6.2.2 Typical sign and AWRS.jpg current
- 11:34, 15 May 2020 diff hist 0 N File:616.6.2.2 Typical road work ahead and flagger ahead.jpg current
- 11:33, 15 May 2020 diff hist +34 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.2 General Characteristics of Signs (MUTCD 6F.02): Per TS, guidance has been updated because flags now shall be used on the ROAD/BRIDGE WORK AHEAD signs during short durations projects in daytime hours. Revised the photo of the sign and AWRS assemble without the flags.
- 09:49, 15 May 2020 diff hist -233 m 606.2 Guard Cable Per CCO and EPS, deleted archaic additional information
- 09:55, 14 May 2020 diff hist +31 m 943.3 AASHTO Policy on Route Marking and Application Updated U.S. Route Numbering - Electronic Application Form current
- 08:38, 14 May 2020 diff hist 0 File:751.5 Dual Lane Structures Tied at Fill Face of End Bent.gif Smithk uploaded a new version of File:751.5 Dual Lane Structures Tied at Fill Face of End Bent.gif current
- 08:38, 14 May 2020 diff hist 0 File:751.5 Dual Lane Structure Tied at Intersection.gif Smithk uploaded a new version of File:751.5 Dual Lane Structure Tied at Intersection.gif current
- 08:32, 14 May 2020 diff hist 0 File:751.5 double-fillet welding symbol.gif Smithk uploaded a new version of File:751.5 double-fillet welding symbol.gif current
- 08:30, 14 May 2020 diff hist 0 File:751.5 double-bevel-groove welding symbol.gif Smithk uploaded a new version of File:751.5 double-bevel-groove welding symbol.gif current
- 07:58, 14 May 2020 diff hist 0 File:751.5 development of standard hooks in tension.gif Smithk uploaded a new version of File:751.5 development of standard hooks in tension.gif current
- 15:25, 13 May 2020 diff hist 0 File:751.5 development of non-epoxy coated grade 40 deformed bars in tension.gif Smithk uploaded a new version of File:751.5 development of non-epoxy coated grade 40 deformed bars in tension.gif current
- 15:10, 13 May 2020 diff hist 0 File:751.5 development and tension lap splice lengths-top bars.gif Smithk uploaded a new version of File:751.5 development and tension lap splice lengths-top bars.gif current
- 14:50, 13 May 2020 diff hist 0 File:751.5 development and tension lap splice lengths-bars in compression.gif Smithk uploaded a new version of File:751.5 development and tension lap splice lengths-bars in compression.gif current
- 14:34, 13 May 2020 diff hist 0 File:751.5 development and tension lap splice lengths-other than top bars.gif Smithk uploaded a new version of File:751.5 development and tension lap splice lengths-other than top bars.gif current
- 14:32, 13 May 2020 diff hist 0 File:751.5 details near free edge or const joint.gif Smithk uploaded a new version of File:751.5 details near free edge or const joint.gif current
- 14:30, 13 May 2020 diff hist 0 File:751.5 detail of steel pile splice.gif Smithk uploaded a new version of File:751.5 detail of steel pile splice.gif current
- 14:45, 12 May 2020 diff hist -53 m Category:1048 Pavement Marking Material →1048.2.10 Type 1 and Type 2 Temporary Raised Pavement Markers: Per CM and TS, removed the archaic “Type 1/Type 2” designation from temporary raised pavement markers.
- 14:20, 12 May 2020 diff hist +16 m Category:139 Design - Build
- 14:18, 12 May 2020 diff hist +88 m 620.2 Pavement and Curb Markings (MUTCD Chapter 3B) →620.2.11 Raised Pavement Markers (MUTCD Section 3B.11): Per CM and TS, removed the archaic “Type 1/Type 2” designation from temporary raised pavement markers.
- 12:54, 12 May 2020 diff hist -2 m Category:139 Design - Build
- 10:04, 12 May 2020 diff hist +159 m Recent Policy Changes in the EPG EPG 751.50
- 09:53, 12 May 2020 diff hist 0 m 751.50 Standard Detailing Notes
- 09:30, 12 May 2020 diff hist -5 m 751.50 Standard Detailing Notes →H10a. Cast-In-Place Permanent Barrier
- 09:14, 12 May 2020 diff hist -1,314 m 751.50 Standard Detailing Notes Per BR, revised H10 so notes work with all barriers.
- 13:48, 7 May 2020 diff hist +325 m Recent Policy Changes in the EPG EPG 642.4, EPG 902.4, EPG 902.5.9
- 13:26, 7 May 2020 diff hist +716 902.5 Traffic Control Signal Features (MUTCD Chapter 4D) →902.5.9 Provisions for Pedestrians (MUTCD Section 4D.03): Per TS, updated guidance for the installation of audible pedestrian signals at intersections of projects requiring ADA upgrades. This guidance also applies to new construction projects.
- 13:21, 7 May 2020 diff hist +994 902.4 Signal Installations and Equipment Per TS, updated guidance for the installation of audible pedestrian signals at intersections of projects requiring ADA upgrades. This guidance also applies to new construction projects.
- 13:14, 7 May 2020 diff hist 0 m 642.4 Impact of the Project Category on ADA →642.4.2.1 Definition of Alteration
- 13:12, 7 May 2020 diff hist 0 N File:642.4.2.1.jpg current
- 13:12, 7 May 2020 diff hist +1,309 642.4 Impact of the Project Category on ADA Per TS, updated guidance for the installation of audible pedestrian signals at intersections of projects requiring ADA upgrades. This guidance also applies to new construction projects.
- 10:56, 7 May 2020 diff hist +19 m Recent Policy Changes in the EPG EPG 413.1
- 09:26, 7 May 2020 diff hist +6,629 413.1 Micro-Surfacing Per CM, guidance for single pass and double pass micro-surfacing was expanded; guidance for micro-surfacing grade selection and surface preparation also expanded. New guidance for post construction and the method of measurement and basis of payment now available.
- 07:28, 7 May 2020 diff hist -45 m Category:1180 Bituminous Stockpile Patching Material
- 07:27, 7 May 2020 diff hist +4 Category:1180 Bituminous Stockpile Patching Material
- 07:24, 7 May 2020 diff hist 0 N File:Hi 642.4.2.1.pdf current
- 07:24, 7 May 2020 diff hist +3 Category:1180 Bituminous Stockpile Patching Material
- 07:23, 7 May 2020 diff hist 0 N File:642.4.2.1.pdf current
- 07:23, 7 May 2020 diff hist +38 Category:1180 Bituminous Stockpile Patching Material
- 13:21, 5 May 2020 diff hist 0 File:751.5 corner joint.gif Smithk uploaded a new version of File:751.5 corner joint.gif current
- 13:15, 5 May 2020 diff hist 0 File:751.5 Coordinating Substructure on Tangent Alignment.gif Smithk uploaded a new version of File:751.5 Coordinating Substructure on Tangent Alignment.gif current
- 13:12, 5 May 2020 diff hist 0 File:751.5 convex contour symbol.gif Smithk uploaded a new version of File:751.5 convex contour symbol.gif current
- 09:41, 4 May 2020 diff hist 0 m Recent Policy Changes in the EPG
- 09:21, 4 May 2020 diff hist 0 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.87 Temporary Rumble Strips (MUTCD 6F.87)
- 09:20, 4 May 2020 diff hist 0 N File:Fig 616.6.87.2.2 2020.jpg current
- 09:20, 4 May 2020 diff hist 0 N File:Fig 616.6.87.2.1 2020.jpg current
- 09:19, 4 May 2020 diff hist 0 N File:Fig 616.6.87.1.2 2020.jpg current
- 09:19, 4 May 2020 diff hist 0 N File:Fig 616.6.87.1.1 2020.jpg current
- 09:18, 4 May 2020 diff hist +20 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.87 Temporary Rumble Strips (MUTCD 6F.87): Per TS, in Figs. 616.6.87.1 and 616.6.87.2, revised the rumble strip spacing to the manufacturer's recommendations. For speed limits 60-70, the spacing changed from 30 to 35 feet.
- 15:18, 1 May 2020 diff hist +1 147.4 Fixed Price Variable Scope (FPVS) Contracting