User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 11:03, 18 February 2021 diff hist -10 m LPA:136.3 Federal Aid Basics Per BR, minor revisions for Fig. 136.3.20, BEAP Project Tracking Form
- 09:18, 18 February 2021 diff hist -61 m 147.3 Job Order Contracting (JOC) removed errant link
- 08:18, 18 February 2021 diff hist -197 m Recent Policy Changes in the EPG EPG 147.3
- 08:14, 18 February 2021 diff hist +325 m 147.3 Job Order Contracting (JOC) Per DE, FHWA has incorporated their Final Rule for ID/IQ projects into 23 CFR 635 Subpart F. JOCs are a procurement means for delivering ID/IQ projects.
- 13:15, 17 February 2021 diff hist +2 m 751.6 General Quantities →751.6.1 Index of Quantities: Per BR, minor corrections
- 11:17, 17 February 2021 diff hist +74 m Recent Policy Changes in the EPG EPG 902.5.8.4
- 11:01, 17 February 2021 diff hist +42 m 902.5 Traffic Control Signal Features (MUTCD Chapter 4D) →902.5.8.4 Record Keeping
- 10:58, 17 February 2021 diff hist +144 m 902.5 Traffic Control Signal Features (MUTCD Chapter 4D) →902.5.8 Responsibility for Operation and Maintenance (MUTCD Section 4D.02): Per TS, new Statewide Signal/Lighting/Flasher Preventive Maintenance Checklist
- 10:22, 17 February 2021 diff hist 0 N File:902.5.8.3.1 checklist.xlsx current
- 10:20, 17 February 2021 diff hist +133 m Category:101 Standard Forms →Financial Services: Per TS, added Statewide Signal/Lighting/Flasher Preventive Maintenance Checklist
- 10:16, 17 February 2021 diff hist 0 m 902.5 Traffic Control Signal Features (MUTCD Chapter 4D) →902.5.36.2 Yellow Change and Red Clearance Intervals (MUTCD Section 4D.26): Per TS, minor correction
- 09:46, 17 February 2021 diff hist +38 m Recent Policy Changes in the EPG EPG 237.13.1
- 09:38, 17 February 2021 diff hist 0 N File:237.13.1 no typical.jpg current
- 09:38, 17 February 2021 diff hist +655 m 237.13 Contract Plan File Name Convention →237.13.1 Design Contract Plans: Per Bid & Contracts, clarified how to name contract plan files when typical sections are not included in the plans
- 09:51, 16 February 2021 diff hist +149 m 231.2 Clear Zones →231.2.1 Introduction: Per TS, minor clarifications current
- 09:24, 11 February 2021 diff hist +60 m Recent Policy Changes in the EPG EPG 127.1.2.1
- 09:21, 11 February 2021 diff hist +23 m 127.1 Request for Environmental Services →127.1.2.1 Location/Conceptual Plan Stage: Per Env'l, clarified that NEPA can be approved at location/conceptual plan stage for simple projects but occurs later for more complicated projects.
- 08:15, 10 February 2021 diff hist -560 m Recent Policy Changes in the EPG EPG 134.3.2
- 15:40, 9 February 2021 diff hist +146 m 751.12 Barriers, Railings, Curbs and Fences →751.12.1.3.3 End of Barrier Reinforcement: Per BR, minor correction in the barbill guidance
- 08:32, 9 February 2021 diff hist -68 m 231.4 Shoulder Width →231.4.2.1 Rural Major Routes: updated link
- 15:54, 8 February 2021 diff hist -1 m 751.13 Expansion Joint Systems →751.13.3.1 General
- 15:53, 8 February 2021 diff hist 0 N File:751.13.3.1 2021.jpg current
- 15:52, 8 February 2021 diff hist +7,704 m 751.13 Expansion Joint Systems Per BR, implemented open cell foam joint seal and updated preformed compression seal for revised manufacturer data.
- 15:35, 8 February 2021 diff hist +865 m Recent Policy Changes in the EPG
- 15:24, 8 February 2021 diff hist +569 m 751.50 Standard Detailing Notes →H5. Expansion Joint Systems: Per BR, H5f. Open Cell Foam Joint Seal (new notes for Bridge Standard Drawings)
- 14:17, 5 February 2021 diff hist -194 m Category:109 Measurement and Payment →109.12.1.1 Change Order Approval Level Criteria
- 14:16, 5 February 2021 diff hist +83 m Category:109 Measurement and Payment →109.12.3 Time Adjustment Change Orders
- 14:16, 5 February 2021 diff hist -82 m Category:109 Measurement and Payment →109.12.1.3 Contingent Items - Settlement for Cost
- 13:52, 5 February 2021 diff hist 0 N File:109.12.1 Time.pdf current
- 13:51, 5 February 2021 diff hist 0 N File:109.12.1 RE.pdf current
- 13:51, 5 February 2021 diff hist 0 N File:109.12.1 Division.pdf current
- 13:51, 5 February 2021 diff hist 0 N File:109.12.1 Chief Engineer.pdf current
- 13:50, 5 February 2021 diff hist 0 N File:109.12.1 Mobilization.pdf current
- 13:50, 5 February 2021 diff hist +170 m Category:109 Measurement and Payment →109.12 Change Orders: Per CM, updated example change orders.
- 09:24, 5 February 2021 diff hist +681 m 907.1 Safety Program Guidelines Per TS, minor clarifications
- 14:05, 4 February 2021 diff hist +56 m 751.22 Prestressed Concrete I Girders →751.22.1.4.2 Girder Length and Geometric Layout: minor clarification
- 12:01, 4 February 2021 diff hist -11 m Recent Policy Changes in the EPG
- 10:27, 4 February 2021 diff hist -176 m Recent Policy Changes in the EPG EPG 751.22.1.4
- 10:17, 4 February 2021 diff hist 0 N File:751.22.1.4.2.jpg current
- 10:17, 4 February 2021 diff hist 0 N File:751.22.1.4.1.jpg current
- 10:14, 4 February 2021 diff hist -240 m 751.22 Prestressed Concrete I Girders →751.22.1.4 Span and Structure Lengths: Per BR, guidance added from 2013 design bulletin that limited spans lengths for Type 6 (bulb-tee) girders to 105 ft. due to stabilities issues beyond this length.
- 08:53, 4 February 2021 diff hist +21 m 903.9 General Information Signs →903.9.15 River and Major Lake Name (I3-1): Per TS, added Missouri River to listing
- 14:18, 2 February 2021 diff hist +4 m 231.4 Shoulder Width →231.4.3.2 Design: Per CM and EPS, further clarified shoulder design and construction processes
- 14:17, 2 February 2021 diff hist +241 m Other Aspects of Pavement Design →Shoulder Surface: Per CM and EPS, further clarified shoulder design and construction processes
- 13:08, 2 February 2021 diff hist +1 m 751.50 Standard Detailing Notes →H3d. Laminated Neoprene Pad Assembly
- 12:28, 2 February 2021 diff hist +139 m Recent Policy Changes in the EPG EPG 751.50
- 12:15, 2 February 2021 diff hist +912 m 751.50 Standard Detailing Notes →H3. Bearings: Per BR, clarified coating requirements for Grade 50 W steel sole plate.
- 15:37, 1 February 2021 diff hist +565 m Recent Policy Changes in the EPG EPG 231.4
- 14:32, 1 February 2021 diff hist -218 m Recent Policy Changes in the EPG EPG 231.2
- 14:12, 1 February 2021 diff hist 0 N File:231.4.3.2.jpg current